652.1General Description
This work includes furnishing and applying reflectorized high build standard and high build wet weather traffic line paint according to the plans and these specifications. This Item also includes applying words and symbols according to plan details, specifications, and the current Manual on Uniform Traffic Control Devices. 652.1.01 Definitions Painted Stripes: Solid or broken (skip) lines. The location and color are designated on the plans. Skip Traffic Stripes: Painted segments with unpainted gaps as specified on the plans. The location and color are designated on the plans. 652.1.02 Related References
General Provisions 101 through 150.
EPA Method 3052 EPA Method 6010
ASTM ASTM Other D711 D3335 D3718 D4144 E4941 E1710 E2177 AASHTO M 247 QPL 46, QPL 71 SOP 39 TT-P-1952E 652.1.03 Submittals General Provisions 101 through 150.
652.2Materials
Ensure that materials for painting traffic stripe, words, and symbols meet the following requirements:
Material Section Traffic Line Paint 6A and 6B 870.2.02.A.4 and 870.2.02.A.5 1194 1194 1194 1194 1194
Use glass spheres and/or reflective composite optics for the reflective media system that ensures the high build paint pavement markings meet the reflectance performance requirements in Subsection 652.3.06. Do not use glass spheres and/or reflective composite optics containing greater than 200 ppm total arsenic, 200 ppm total antimony, or 200 ppm total lead when tested according to the most recent US EPA Methods 3052 and 6010, or other approved methods. Ensure glass spheres meet the requirements of AAHTO M 247. Use glass spheres produced from an approved source listed on QPL 71. Glass beads conforming to an alternative gradation may be used provided all other requirements of AASHTO M 247 and this specification are met. Obtain approval from the Office of Materials and Research to use alternate gradations. 652.2.01 Delivery, Storage, and Handling
Ensure the paint does not cake, liver, thicken, curdle, gel, or show any other objectionable properties after storage for six months above 32 °F (0 °C).
Mix thoroughly before use.
652.3Construction Requirements
652.3.01 Personnel General Provisions 101 through 150. 652.3.02 Equipment
Use a traffic stripe painter that can travel at a predetermined speed both uphill and downhill, applying paint uniformly. Ensure that the painter feeds paint under pressure through nozzles spraying directly onto the pavement. Use a paint machine equipped with the following:
any pattern.
• Cutoff valves for automatically applying broken or skip lines • A mechanical bead dispenser that operates simultaneously with the spray nozzle to uniformly distribute glass spheres and/or reflective composite optics at an application rate to meet the reflectance performance requirements in Subsection 652.3.06. • Line-guides consisting of metallic shrouds or air blasts
Use brushes, templates, and guides when hand painting.
Use brushes, brooms, scrapers, grinders, high-pressure water jets, or air blasters to remove dirt, dust, grease, oil, and other foreign matter from painting surfaces without damaging the underlying pavement. 1195 1195 1195 1195 1195
652.3.03 Preparation Locate approved paint manufacturers on QPL 46. Before starting each day’s work, thoroughly clean paint machine tanks, connections, and spray nozzles, using the appropriate solvent. Thoroughly mix traffic stripe paint in the shipping container before putting it into machine tanks. Before painting, thoroughly clean pavement surfaces of dust, dirt, grease, oil, and all other foreign matter. 652.3.04 Fabrication General Provisions 101 through 150. 652.3.05 Construction
Ensure that the traffic stripe is the specified length, width, and placement. On sections where no previously applied markings are present, ensure accurate stripe location by establishing control points at spaced intervals. The Engineer will approve control points.
Apply traffic stripe paint by machine. If areas or markings are not adaptable to machine application, use hand equipment.
Paint will be subject to application rate checks. Apply 5 in (125 mm) wide traffic stripe at the following minimum rates:
NOTE: Change minimum rate proportionately for varying stripe widths.
Maintain 25 mils (0.58mm) minimum wet average thickness above the surface of the pavement.
• The surface is moist or covered with foreign matter. • Air temperature in the shade is below 50 °F (10 °C) • Wind causes dust to land on prepared areas or blows paint and glass spheres and/or reflective composite optics around during application
glass spheres and/or reflective composite optics at a rate to meet the reflectance performance requirements in Subsection 652.3.06.
Protect newly applied paint as follows:
Control and protect traffic with warning and directional signs during painting. Set up warning signs before beginning each operation and place signs well ahead of the painting equipment. When necessary, use a pilot car to protect both the traffic and the painting operation. 1196 1196 1196 1196 1196
Protect the freshly painted stripe using cones or drums. Repair stripe damage or pavement smudges caused by traffic according to Subsection 652.3.06.
Continually deviating from stated dimensions is cause for stopping the work and removing the nonconforming stripe. (See Section 656—Removal of Pavement Markings.) Adhere to the following measurements:
Do not lay stripe less than the specified width. Do not lay stripe more than 1/2 in. (13 mm) over the specified width.
Ensure that the 10 ft. (3 m) painted skip stripe and the 30 ft. (10 m) gap between painted segments vary no more than ± 1 ft. (300 mm) each.
lines or curves of 1 degree or less.
652.3.06 Quality Acceptance
For a minimum of 30 days from the time of placement, ensure the high build traffic paint pavement marking material shows no signs of failure due to blistering, excessive cracking, shipping, bleeding, staining, discoloration, oil content of the pavement materials, smearing or spreading under heat, deterioration due to contact with grease deposits, oil, diesel fuel, or gasoline drippings, spilling, poor adhesion to the pavement material, vehicular damage, and normal wear. In the event that failures mentioned above occur, ensure corrective work is completed at no additional cost to the Department. Obtain pavement marking retro-reflectivity values with a 30-meter geometry retro-reflectometer.
Within 30 days of installation, ensure the in-place markings meet the following minimum reflectance values:
White Yellow Dry (ASTM E 1710) 300 mcd/lux/m2 250 mcd/lux/m2 Wet recovery (ASTM E 2177) 150 mcd/lux/m2 100 mcd/lux/m2
White Yellow Dry (ASTM E 1710) 300 mcd/lux/m2 250 mcd/lux/m2 For each center line, edge line, and skip line, measure retro-reflectivity 9 times for each mile; 3 times within the first 500 feet, 3 times in the middle, and 3 times within the last 500 feet. For projects less than one mile in length, measure retro-reflectivity 9 times as above. Record all retro reflectivity measurements on the form OMR CVP 66 in SOP 39. 1197 1197 1197 1197 1197
Within 30 days of installation, ensure the in-place markings when tested according to ASTM E 1710 meet the following minimum reflectance value of 275 mcd/lux/m2. Perform at a minimum, one retro-reflectivity measurement at one message, one symbol and one transverse line per intersection. Take one measurement per mile for locations other than intersections (i.e. school messages, railroad messages, bike symbols etc.)
Maintain the following minimum reflectance values for 180 days after installation:
White Yellow Dry (ASTM E 1710) 300 mcd/lux/m2 250 mcd/lux/m2 Wet recovery (ASTM E 2177) 150 mcd/lux/m2 100 mcd/lux/m2
White Yellow Dry (ASTM E 1710) 300 mcd/lux/m2 250 mcd/lux/m2 Retest the in-place markings according to Subsection 652.3.06.B.1, 180 days after installation to ensure these minimum retroreflectance values are maintained. NOTE: The Contractor is responsible for retro-reflectivity testing. Furnish initial test results to the Engineer within 30 days of application. Furnish 6-month test results to the Engineer within 180 days of application or prior to final acceptance, whichever comes first.
At the time of installation, check the thicknesses on all skip lines, edge lines and center lines according to ASTM D 4114. For each center line, edge line, and skip line, measure thickness above the pavement 3 times for each mile; once within the first 500 ft., once in the middle, and once within the last 500 ft. For projects less than one mile in length, measure the thickness above the pavement 3 times. Record thickness measurements on the form OMR CVP 66 in SOP 39. Submit results to the Engineer.
For each mile section, if paint stripe fails to meet plan details or specifications or deviates from stated dimensions, correct it at no additional cost to the Department. If removal of pavement markings is necessary, perform it according to Section 656 and place it according to this specification. No additional payment will be made for removal and replacement of unsatisfactory striping. Ensure corrective work is completed at no additional cost to the Department. Perform testing according to this specification. Any retest due to failures will be performed at no additional cost to the Department. Furnish all test reports to the Department. Retro-reflectivity and Thickness Longitudinal Line Deficiency: A deficiency will ensure when two or more Location Average results as recorded on form OMR CVP 66 within a One-Mile Section do not meet the performance criteria herein. The entire line within this one-mile section will be determined to be deficient. If the evaluated section is less than 1.0 mile, a single Location Average result not meeting the performance criteria herein will result in the entire line to be determined to be deficient. 1198 1198 1198 1198 1198
Retro-reflectivity Transverse Markings and Symbol Deficiency: A single Location Average result on the marking
or symbol not meeting the performance criteria herein will result in the marking or symbol to be determined to
be deficient.
Ensure that stripes and segments of stripes are clean-cut and uniform. Markings that do not appear uniform or
satisfactory, either during the day or night, or do not meet specifications, will be corrected at the Contractor’s
expense. Paint will be subject to application rate checks.
When correcting a deviation that exceeds the permissible tolerance in alignment, do the following:
Remove misted, dripped, or spattered paint to the Engineer’s satisfaction. Do not damage the underlying
pavement during removal.
Refer to the applicable portions of Section 656—Removal of Pavement Markings.
652.3.07 Contractor Warranty and Maintenance
General Provisions 101 through 150.
652.4Measurement
When traffic stripe is paid for by the square yard (meter), the number of square yards (meters) painted is measured and
the space between stripes is included in the overall measurement.
Linear measurements are made on the painted surface by an electronic measuring device attached to a vehicle. On
curves, chord measurements, not exceeding 100 linear feet (30 linear meters), are used.
Traffic stripe and markings, complete in place, are measured and accepted for payment as follows:
Solid traffic stripe is measured by the linear foot (meter), linear mile (kilometer), or square yard (meter). Breaks or
omissions in solid lines or stripes at street or road intersections are not measured.
Skip traffic stripe is measured by the gross linear foot (meter) or gross linear mile (kilometer). Unpainted spaces
between the stripes are included in the overall measurements if the plan ratio of 1 to 3 remains uninterrupted.
Measurement begins and ends on a stripe.
Markings are words and symbols completed according to plan dimensions. Markings are measured by the unit.
652.4.01 Limits
General Provisions 101 through 150. 11991199119911991199
652.5Payment
Payment will be full compensation for the work under this section, including the following:
• Cleaning and preparing surfaces
• Furnishing materials, including paints, beads, and thinners
• Applying, curing, and protecting paints
• Protecting traffic, including providing and placing necessary warning signs
• Furnishing tools, machines, and other equipment necessary to complete the Item
Payment will be made under:
Item No. 652 Solid traffic stripe, _____ in. (mm), (color) Per linear mile (kilometer)
Item No. 652 Skip traffic stripe, _____in. (mm), (color) Per gross linear mile
(kilometer)
Item No. 652 Solid traffic stripe, _____in. (mm), (color) Per linear foot (meter)
Item No. 652 Skip traffic stripe, _____in. (mm), (color) Per gross linear foot (meter)
Item No. 652 Pavement markings, words, and symbols, (color) Per each
Item No. 652 Traffic stripe, _____in. (mm), (color) Per square yard (meter)
Item No. 652 Solid traffic stripe, High Build Wet Weather, _____ in. (mm), (color) Per linear mile (kilometer)
Item No. 652 Skip traffic stripe, High Build Wet Weather, _____ in. (mm), (color) Per gross linear mile
(kilometer)
Item No. 652 Solid traffic stripe, High Build Wet Weather, _____in. (mm), (color) Per linear foot (meter)
Item No. 652 Skip traffic stripe, High Build Wet Weather, _____in. (mm), (color) Per gross linear foot (meter)
Item No. 652 Pavement markings, High Build Wet Weather, words, and
symbols, (color)
Per each
Item No. 652 Traffic stripe, High Build Wet Weather, _____in. (mm), (color) Per square yard (meter)
652.4.01 Adjustments
General Provisions 101 through 150.. 1200 1200 1200 1200 1200