for Highway Construction Page 183 of 715 SECTION 301 – GRANULAR SUBBASE
301.01 Description.
Provide, place, and c onstruct 1 or more courses of granular subbase on a prepared subgrade.
301.02 Materials.
Provide materials as specified i n 703. The Engineer will accept granular subbase for quality requirements at the point of delivery. Use the following standard methods for tests: Compaction Standard for Coarse Granular Materials by Use of the Vibratory Spring- load Compactor .............................................................................................. Idaho IT 74 In-Place Density and Moisture Content of Soil and Soil Aggregate by Nuclear Methods (Shallow Depth) ................................................. AASHTO T 310 Method B Prepare and submit an Idah o IT 74 density curve for the subbase material to be incorporated into the work, before placing granular subbase on the roadway. This testing is incidental and a separate payment will not be made. RAP may be used in granular subbase when appr oved. Do not exceed a RAP size of 3 inches. The Engineer will visually verify the RAP daily, in place, to confirm the size requirement has been met.
301.03 Construction Requirements.
301.04 Method of Measurement.
The Engineer will measure acceptably completed work as follows:
301.05 Basis of Payment .
The Department will pay for accepted quantities as follows: Pay Item Pay Unit Granular Subbase .................................................................................. Ton or CY Granular Subbase in Stockpile ............................................................... Ton or CY Granular Subbase Load, Haul, and Pl ace .............................................. Ton or CY for Highway Construction Page 185 of 715 SECTION 302 – EMULSION TREATED BASE
302.01 Description.
Construct 1 or more courses of emulsion treated base.
302.02 Materials.
Provide aggregate as specified in 703. The Engineer will accept aggregate for quality requirements at the point of delivery. Provide emulsified asphalt of the type and grade as specified in 702. The Engineer w ill accept the material at the point of delivery. Use the following standard test methods: Compaction Standard for Coarse Granular Materials by Use of the Vibratory Spring- load Compactor ......................................................... Idaho IT 74 In-Place Density and M oisture Content of Soil and Soil Aggregate by Nuclear Methods (Shallow Depth) ................................................. AASHTO T 310 Method B Instead of Idaho IT 74, if approved, the maximum dry density of aggregate base may be tested with: Moisture Density Relations of Soils ..................................................... AASHTO T 180 Method D Prepare an Idaho IT 74 density curve or an AASHTO T 180 Method D moisture- density curve for the aggregate base and submit bef ore placement . This testing is incidental .
302.03 Construction Requirements.
Mix the aggregate , emulsified asphalt , and water in an approved stationary plant. Mix the emulsified asphalt with water at a ratio of 1:1 and uniformly mix with the aggregate base until approximately 4 percent diluted emulsified asphalt, by weight of dry aggregate, has been added. Additional water may be required to complete the mixing of the aggregate base and to facilitate compaction. Place the base material on the roadbed by means of an approved aggregate spreader. Do not exc eed a maximum compacted thickness of 0.5 foot for each layer. Construct the base in 2 or more layers of approximate equal thicknes s if the required compacted depth of the base exceeds 0.5 foot. The compacted depth of a single layer of the base may be increased to 0.8 foot when vibrating or other approved types of special compacting equipment are used. Shaping and spreading may be per formed with motor graders or approved methods in areas where it is not practical to operate the spreader. Compact for its full width after each layer has been spread and continue compaction until 100 percent of the applicable maximum density is attained. Produce a surface for each layer with uniform texture and aggregate that is firmly keyed. Maintain the surface during the compaction operations.