for Highway Construction Page 182 of 715 SECTION 300 – BASES for Highway Construction Page 183 of 715 SECTION 301 – GRANULAR SUBBASE
301.01 Description.
Provide, place, and c onstruct 1 or more courses of granular subbase on a prepared subgrade.
301.02 Materials.
Provide materials as specified i n 703. The Engineer will accept granular subbase for quality requirements at the point of delivery. Use the following standard methods for tests: Compaction Standard for Coarse Granular Materials by Use of the Vibratory Spring- load Compactor .............................................................................................. Idaho IT 74 In-Place Density and Moisture Content of Soil and Soil Aggregate by Nuclear Methods (Shallow Depth) ................................................. AASHTO T 310 Method B Prepare and submit an Idah o IT 74 density curve for the subbase material to be incorporated into the work, before placing granular subbase on the roadway. This testing is incidental and a separate payment will not be made. RAP may be used in granular subbase when appr oved. Do not exceed a RAP size of 3 inches. The Engineer will visually verify the RAP daily, in place, to confirm the size requirement has been met.