for Highway Construction Page 182 of 715 SECTION 300 – BASES for Highway Construction Page 183 of 715 SECTION 301 – GRANULAR SUBBASE
301.01 Description.
Provide, place, and c onstruct 1 or more courses of granular subbase on a prepared subgrade.
301.02 Materials.
Provide materials as specified i n 703. The Engineer will accept granular subbase for quality requirements at the point of delivery. Use the following standard methods for tests: Compaction Standard for Coarse Granular Materials by Use of the Vibratory Spring- load Compactor .............................................................................................. Idaho IT 74 In-Place Density and Moisture Content of Soil and Soil Aggregate by Nuclear Methods (Shallow Depth) ................................................. AASHTO T 310 Method B Prepare and submit an Idah o IT 74 density curve for the subbase material to be incorporated into the work, before placing granular subbase on the roadway. This testing is incidental and a separate payment will not be made. RAP may be used in granular subbase when appr oved. Do not exceed a RAP size of 3 inches. The Engineer will visually verify the RAP daily, in place, to confirm the size requirement has been met.
301.03 Construction Requirements.
BASES in other states
Get an email when 300 changes
Idaho revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.