for Highway Construction Page 491 of 715 SECTION 611 – CATTLE GUARDS
611.01 Description.
Construct cattle guards.
611.02 Materials.
Use Class 30 concrete . Provide material as specified in: Metal Reinforcement .................................................................................................................... 503 Structural Metal s ........................................................................................................................... 504 Nonstructural Concrete ................................................................................................................. 509 Culverts ........................................................................................................................................ 602 Fences ......................................................................................................................................... 610
611.03 Construction Requirements.
Complete roadway grading at the location of the cattle guard before excavating for the cattle guard. Backfill the structure with granular material as specified in 210.
611.04 Method of Measurement.
The Engineer will measure acceptably completed work by the each, including the wing braces and posts. The distance between the posts will be excluded from measurement for fence.
611.05 Basis of Payment .
The Department will pay for acceptable quantities at the contract unit prices as follows: Pay Item Pay Unit Cattle Guard, Type ___ .......................................................................... Each Structural excavation and compacting backfill are incidental and the cost included in the cattle guard contract unit price. The Departme nt will pay for culverts as specified in 602. for Highway Construction Page 492 of 71 5 SECTION 6 12 – GUARDRAIL
612.01 Description.
Provide and install guardrail and concrete barrier .
612.02 Materials.
Provide materials as specified in: Excavation and Embankment ....................................................................................................... 205 Concrete ....................................................................................................................................... 502 Metal Reinforcement .................................................................................................................... 503 Steel Guardrail Posts ............................................................................................................... 708.07 Guardrail and Hardware .......................................................................................................... 708.14 Wood Guardrail Posts and Wood Blockouts ............................................................................ 710.03
612.03 Construction Requirements.
612.04 Metho d of Measurement.
The Engineer will measure acceptably completed work as follows: