Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction
Section 355 — HOT-MIX ASPHALT BASE COURSE
Illinois Standard Specifications for Road and Bridge Construction, Section 355. Full text, cross-references and related pay items on BuildSpec.
Hot-Mix Asphalt Base Course Art. 355.05 175 (c) The option of correcting deficient pavement with additional lift(s) shall not apply. 354.10 Backfill at Edge. Within 24 hours after completion of the base course widening, the remaining portion of the widening trench shall be backfilled as specified in Article 202.06. Prior to opening the base course widening to traffic, the Contractor shall compact the earth backfill adjacent to the base course. Compaction shall be obtained with a pneumatic-tired roller, to the satisfaction of the Engineer. 354.11 Earth Shoulders. At locations where no…
The rest of Section 355 — HOT-MIX ASPHALT BASE COURSE is for members
You're reading the opening of Section 355 — HOT-MIX ASPHALT BASE COURSE. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations