Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction

Section 407 — HOT-MIX ASPHALT PAVEMENT (FULL-DEPTH)

Illinois Standard Specifications for Road and Bridge Construction, Section 407. Full text, cross-references and related pay items on BuildSpec.

Art. 407.01 Hot-Mix Asphalt Pavement (Full-Depth) 216 The HMA test strip will be evaluated for payment according to one of the following options. OPTION 1. If the HMA placed during the initial test strip is determined to be acceptable, the mixture will be paid for at the contract unit price. OPTION 2. If the HMA placed during the initial test strip (1) is determined to be unacceptable to remain in place by the Engineer, and (2) was not produced within 2.0 to 6.0 percent air voids or within the individual control limits of the JMF according to the Department’s test results, the mixture will…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in