Storm Sewers Jacked in Place Art. 552.04 Trench backfill will be paid for according to Article 208.04. Removal and replacement of unsuitable material below plan bedding grade will be paid for according to Article 109.04. SECTION 552. STORM SEWERS JACKED IN PLACE
552.01 Description. This work shall consist of installing, by jacking, storm
sewers of the required inside diameter at locations shown on the plans.
552.02 Materials. Materials shall be according to the following.
Item Article/Section
552.03 Traffic Control. The road shall be kept open to traffic according to
Article 701 — 17(d)(3).
CONSTRUCTION REQUIREMENTS
552.04 General. Storm sewers shall be jacked in a continuous operation.
The construction may be accomplished by jacking the storm sewer, or if the Contractor elects, a metal casing of sufficient strength and size first, then the storm sewer installed inside the casing. If the casing is used, it shall remain in place to support the embankment, and the voids between the liner and the sewer pipe shall be completely filled with sand or grout mixture as approved by the Engineer. The diameter of the metal casing, if used, shall not exceed the outside diameter of the storm sewer by more than 6 in. (150 mm). The Contractor may shorten the length of storm sewer to be jacked by open cutting and sheeting, shoring or bracing the excavation outside the roadway limits. No open cutting shall be permitted inside the shoulder lines. If continuous jacking operation cannot be maintained, the Contractor shall take the necessary precautions to not allow the jacked pipe to become fixed in place. The Contractor shall provide details of the anticipated installation method and equipment. Installation details shall be provided for each location shown in the plans and include (1) the method proposed and a step-by-step installation sequence,
552.05 Joints. As each succeeding pipe section is placed against the
previously jacked pipe, a 1/2 in. (13 mm) manila rope or other suitable material shall be inserted throughout the entire groove of the joint and set in place with mastic. The opening on the inside of the pipe shall be mortared with a mixture composed of one part cement to three parts sand, by volume, based on dry materials, after the complete sewer has been jacked in place. Any other method of jointing must be approved by the Engineer prior to the start of construction.
552.06 Accuracy of Placement. The alignment and elevation of the forward
end of the pipe shall be checked at regular intervals as work proceeds and appropriate measures immediately taken to correct any observed deviation. When the Contractor elects to jack a metal casing prior to installing the storm sewer, all earth and other foreign material shall be removed from inside the casing. The storm sewer sections shall be installed by jacking the sections through the casing.
552.07 Method of Measurement. This work will be measured for payment in
place in feet (meters). Cast Iron Soil Pipe Art. 560.05 Excavation in rock will be measured for payment according to Article 502.12.
552.08 Basis of Payment. This work will be paid for at the contract unit price
per foot (meter) for STORM SEWERS JACKED IN PLACE, of the diameter or equivalent round size specified. Excavation in rock will be paid for according to Article 502.13. UTILITIES SECTION 560. CAST IRON SOIL PIPE
560.01 Description. This work shall consist of constructing a cast iron soil
pipe.
560.02 Materials. Materials shall be according to the following.
Item Article/Section
560.03 General. Construction requirements shall be according to Section 550
with the following exceptions. The pipe shall be laid with its spigot end lacking 1/4 in. (6 mm) of being driven full into the bell. Gaskets of clean, sound hemp yarn braided or twisted and tightly driven shall be used to pack the joints, followed by caulking with pure soft lead of the best quality for the purpose, so as to make a tight and permanent joint. All pipes shall be carefully cleaned before laying, and shall be left clean and in working order. The pipe shall have a solid bearing throughout its entire length. If it becomes necessary to cut the pipe, it shall be cut in such a manner that the ends will be square with the axis of the pipe.