Grouting of Anchor Rods And Bars Art. 584.04 The mortar shall be placed to the thickness necessary to eliminate unevenness between the beams. It shall be placed to form a smooth even surface from the higher beam edges to the lower surface. The mortar finished surface shall slope not less than 1:3 (V:H) and shall be feathered smoothly into the deck beam surfaces. The finish shall be free of depressions or sharp edges. The mortar shall be cured for a period of not less than three days by the wetted burlap method according to Article 1020.13(a)(3). Curing shall commence as soon as practicable after mortar placement.
583.04 Method of Measurement. This work will be measured for payment in
feet (meters) along the beam edges.
583.05 Basis of Payment. This work will be paid for at the contract unit price
per foot (meter) for PORTLAND CEMENT MORTAR FAIRING COURSE. SECTION 584. GROUTING OF ANCHOR RODS AND BARS
584.01 Description. This work shall consist of drilling and grouting anchor
rods and bars into hardened concrete.
584.02 Materials. Materials shall be according to the following.
Item Article/Section
584.03 General. Holes shall be drilled in the concrete to 1/4 in. (6 mm) larger
in diameter than the diameter of the anchor rods or bars and to the depth shown on the plans. A template or other approved method shall be used to ensure accurate location of the drilled holes. All holes shall be blown free of concrete dust and chips and shall be absolutely dry prior to placing the chemical adhesive. Prior to inserting the anchor rod or bar into the hole, the hole shall be filled approximately 1/3 full of the mixed chemical adhesive. The anchor rod or bar shall be inserted into the partially filled hole and moved up and down several times to ensure total contact of the chemical adhesive with concrete as well as the rod or bar. Additional chemical adhesive shall be extruded to proper concrete level and finished as necessary. The anchor rod or bar shall be aligned to maintain a perpendicular plane. No load shall be applied to the anchors until the chemical adhesive has cured for at least 24 hours.
584.04 Basis of Payment. This work will not be measured or paid for
separately, but shall be considered as included in the unit price bid for the item of construction involved. SECTION 585. RESERVED Art. 586.01 Granular Backfill for Structures SECTION 586. GRANULAR BACKFILL FOR STRUCTURES
586.01 Description. This work shall consist of furnishing, transporting and
placing granular backfill for abutment structures.
586.02 Materials. Materials shall be according to the following.
Item Article/Section
586.03 General. This work shall be according to Article 502.10, except as
modified below. The backfill volume shall be backfilled, with granular material as specified in Article 586.02, to the required elevation as shown on the plans. The backfill volume shall be placed in convenient lifts for the full width to be backfilled. Mechanical compaction will not be required. The granular backfill shall be brought to the finished grade as shown on the plans. When concrete is to be cast on top of the granular backfill, the Contractor, subject to approval of the Engineer, may prepare the top surface of the fill to receive the concrete as he/she deems necessary for satisfactory placement.
586.04 Method of Measurement. This work will be measured for payment as
follows.
586.05 Basis of Payment. This work will be paid for at the contract unit price
per cubic yard (cubic meter) for GRANULAR BACKFILL FOR STRUCTURES. SECTION 587. CONCRETE SEALER
587.01 Description. This work shall consist of furnishing and applying a
sealer to concrete structures as shown on the plans.
587.02 Materials. Materials shall be according to the following.
Item Article/Section