Section 583 — PORTLAND CEMENT MORTAR FAIRING COURSE

Illinois Standard Specifications for Road and Bridge Construction, Section 583. Full text, cross-references and related pay items on BuildSpec.

Art. 582.06 Portland Cement Mortar Fairing Course 514 The established average target density shall apply throughout the project unless there are changes in mix materials or an appreciable change in the job mix formula. The Engineer may require a new average target density to be established if there is reason to believe that the mixture being placed is not the same as the mixture used to determine the target density. 582.06 Acceptance Tests. Acceptance tests will be performed once the average target density has been established. At least one acceptance test will be taken for each 200 ft (60 m)…

The rest of Section 583 — PORTLAND CEMENT MORTAR FAIRING COURSE is for members

You're reading the opening of Section 583 — PORTLAND CEMENT MORTAR FAIRING COURSE. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 583 — PORTLAND CEMENT MORTAR FAIRING COURSE — free for 14 daysSign in