Bridge Relief Joint Sealer Art. 588.03 517 CONSTRUCTION REQUIREMENTS 587.03 General. Before the sealer is applied, the concrete surface shall have a minimum 48 hour drying period, and shall be cleaned with oil-free compressed air or wire brushes to remove all oil, grime, and loose particles. Surfaces that will not respond to cleaning by compressed air or wire brushes shall be cleaned by sandblasting. Care shall be taken to prevent the sealer from flowing over the edges and onto any concrete that is not to be sealed. The sealer shall be applied according to the manufacturer’s instructions, and…
The rest of Section 588 — BRIDGE RELIEF JOINT SEALER is for members
You're reading the opening of Section 588 — BRIDGE RELIEF JOINT SEALER. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations