Bases & Subbases (300-399)

300The costs of the RBC mix design and QC testing shall be included in the cost of

IN · 2024 Standard SpecificationsBook pages 56View official source ↗

The costs of the RBC mix design and QC testing shall be included in the cost of the full depth reclamation. The costs associated with removal of grass and vegetation, rubberized crack filler, durable pavement markings, loop wires and other non-pavement materials shall be 380 included in the cost of the full depth reclamation. The costs associated with pulverizing, stabilizing, compacting, curing, and maintenance of the RBC shall be included in the cost of the full depth reclamation. The cost associated with mixing water shall be included in the cost of the full depth reclamation. The cost associated with aggregate, wh en used to supplement material volume, shall be included in the cost of the corrective aggregate pay item. 390 When portland cement is a required stabilizing material, costs associated with mixing, installation, compaction, curing, and maintenance shall be included in the cost of the full depth reclamation.

The cost associated with ag gregate, when used to adju st the RBC gradation, shall be included in the cost of th e corrective aggregate pay item. In the locations of failing subgrade, removal of the RBC shall be included in the cost of the subgrade treatment. 400 308.20 301 DIVISION 400 – ASPHALT PAVEMENTS

Source: Indiana Standard Specifications, 2024 Edition. Pages 56 of 1,248.