Bases & Subbases (300-399)

391Any damage to the completed recycled material shall be repaired by the 330

IN · 2024 Standard SpecificationsBook pages 391393View official source ↗

Contractor prior to the placement of new asphalt concrete or final surface sealing. Patching shall be in accordance with 304. The excavated patch areas shall be filled and compacted with HMA or CIR material as dir ected by the Engineer. No direct payment will be made for damage or repair unless approved by the Engineer. 416.13 Curing Before placing the final surfacing, the recycled surface shall remain in-place for a minimum of three days and meet one of the following conditions: (a) there is less than 3.0% moisture remaining in the mixture, or 340

b.the material has cured for a minimum of 10 consecutive days without rainfall. The planned method and duration of curing for CIR shall be in accordance with the QCP. The specified surface course sha ll be placed within two weeks of the CIR final cure, but no later than November 1.

416.14 Milling

The entire surface of the CIR shall be scarified in accordance with 306.04 in 350 preparation for the overlay, except liquidated damages will not apply. Construction engineering shall be provided in accordance with 105.08(b).

416.15 CIR Surface Course

The surface course atop the CIR shall be as shown on the plans. The CIR shall be swept of all loose material and standing water with a rotary power broom in accordance with 409 immedi ately prior to placing the surface. The CIR shall be swept lightly to avoid damage to the CIR. A tack coat shall be required only for the HMA overlay and shall be applied to the CIR in accordance with 406 immediately following sweeping operations. Monuments shall be reestablished in accordance with 615.10.

416.16 Method of Measurement

The CIR will be measured by the square yard, complete in place. Asphalt emulsion will be measured by the ton. Aggregate used to adjust the CIR gradation will be measured by the ton. HMA patching wi ll be measured in accordance with 304.06. Milling will be measured in accordance with 306.10. Re-established monuments will 370 be measured in accordance with 615.13. Gr ade adjustment of existing structures will be measured in accordance with 720.06. Removal of snowplowable raised pavement markers will be measured in accordan ce with 808.12. Portland cement will be measured by the ton. 416.16

416.17 Basis of Payment

The CIR will be paid for at the contract unit price per square yard, complete in place. Asphalt emulsion will be paid for at the contract unit price per ton, complete in place. Aggregate used to adjust the CIR grada tion will be paid for at the contract unit price per ton, complete in place. HMA patching will be paid for in accordance with 380

304.07 for the thickness shown on the plans. Milling will be paid for in accordance

with 306.11. Re-established monuments will be paid for in accordance with 615.14. Grade adjustment of existing structures will be paid for in accordance with 720.07. Removal of snowplowable raised pavement markers will be paid for in accordance with 808.13. Portland cement will be paid for in accordance with 104.03. The change order will include direct material costs, delivery costs, and shall not include any other markups. Payment will be made under: 390 Pay Item Pay Unit Symbol Cold In-Place Recycling ............................................................ SYS Corrective Aggregate, CIR ........................................................ TON Stabilizing Material, Asphalt Emulsion ..................................... TON Stabilizing Material, Portland Cement ...................................... TON The costs of the CIR mix design and QC testing shall be included in the cost of the CIR. 400 The costs associated with removal of gr ass and vegetation, rubberized crack filler, durable pavement markings, loop wires and other non-pavement materials shall be included in the cost of the CIR. The costs associated with stabilizing, compacting, curing and maintenance of the CIR not related to failing subgrade shall be included in the cost of the CIR. The cost associated with mixing water sh all be included in the cost of the CIR. The cost associated with aggregate wh en used to supplement material volume shall be included in the cost of the corrective aggregate pay item. When portland cement is a required stabilizing material, costs associated with mixing, installation, compaction, curing, and maintenance shall be included in the cost of the CIR. The cost associated with aggregate when used to adjust the CIR gradation shall be included in the cost of the corrective aggregate pay item. 420 416.17 393 The cost of milling the asphalt emulsion stabilized CIR to maintain profile shall be included in the cost of the milling. In the locations of failing subgrade, removal of the CIR shall be included in the cost of subgrade treatment.

Source: Indiana Standard Specifications, 2024 Edition. Pages 391393 of 1,248.