Type * ........................................ TON 370 * Mixture type
Preparation of surfaces to be overlaid sh all be included in the cost of other pay items in this section.
No payment will be made for additional anti-stripping additives. The cost of removing and replacing soft yielding areas shall be included in the cost of other pay items in this section. 380 No payment will be made for coring operations and related traffic control expenditures required in 402.16. Corrections for pavement smoothness including removal and replacement of pavement, shall be included in the cost of other pay items in this section.
The cost of removal of HMA for temporary pavement including the subgrade and subbase materials shall be included in the cost of HMA for temporary pavement. 390