paid for by the linear foot, complete in place.
Adjustments to the contract payment with respect to mixture, density, and smoothness for mixture produced will be included in a quality assurance adjustment 520 pay item. The unit price for this pay item will be $1.00 and the quantity will be in units of dollars. The quantity is th e total calculated in accordance with 410.19. A change order will be prepared to reflect contract adjustments in accordance with 109.05. Payment will be made under: Pay Item Pay Unit Symbol Joint Adhesive, ____________ ................................................. LFT course type 530 QC/QA - HMA, _____, _____, _____, ______ mm, - SMA .... TON (ESAL (1))(PG(2))(Course(3))(Mix(4)) Quality Assurance Adjustment .................................................. DOL
temperature grades are - 22
Preparation of surfaces to be overlaid sh all be included in the cost of other pay 540 items within this section. Coring and refilling of the pavement holes shall be included in the cost of other pay items within this section. No payment will be made for additional anti-stripping additives, appeal coring or related traffic control expenditures for coring operations.
Corrections for pavement smoothness sha ll be included in the cost of other pay items within this section. 550 The price for inertial profiler, HMA will be full compensation regardless of how often the inertial profiler is used or how often the IRI is determined.