Pavement smoothness will be accepted by means of an inertial profiler, a 16 ft 610 straightedge, or a 10 ft straightedge as described below.
a.Inertial Profiler with Smoothness Pay Adjustments When a pay item for Inertial Profiler, HMA is included in the contract, the 401.18 318 Contractor shall furnish, calibrate, and operate an approved inertial profiler in accordance with ITM 917 for the accepta nce of longitudinal smoothness on the mainline traveled way, incl uding adjacent acceleration or deceleration lanes, where all of the following conditions are met: 1. The posted speed is greater than 45 mph. 620
3.The HMA is placed on a milled surface and the planned lay rate for a single lift is 165 lb/sq yd or greater, or the total combined planned lay rate of surface, intermediate, and base courses is 385 lb/sq yd or greater. The profiles and International Roughness Index, IRI, results including areas of 630 localized roughness shall become the property of the Department. The inertial profiler shall remain the property of the Contractor. The project area will be divided into individual smoothness sections measuring 0.1 mi in length for each lane. The paving exceptions and areas exempt from inertial profiler operation will be in accordance with ITM 917. If the posted speed limit for an entire smoothness section is less than or equal to 45 mph, the section will be exempt from Inertial Profiler operation and the smoothness within the section will be accepted in accordance with 401.18(b). 640 If the posted speed limit is greater than 45 mph for a portion of a smoothness section and is less than or equal to 45 mph for the remainder, the section smoothness acceptance will be as follows:
2.In accordance with 401.18(b ) for the portion of the section with a posted speed limit less than or equal to 45 mph. 650 At locations where the inertial profiler is required, it shall be used on the surface course and on any dense graded intermediate course immediately below the surface course. (b) 16 ft Straightedge The Contractor shall furnish and operate a 16 ft straightedge in accordance with 306.03(d) and as described below. The 16 ft straightedge shall be used to measure smoothness along the direction of mainline traffic. 660 401.18 319 Locations on the pavement surface scrape d by the straightedge shall be marked. The pavement shall be corrected in accordan ce with 401.18(e) to meet the required tolerance. For existing utility and manhole castings that required no grade adjustment, the tolerance may be adjusted after being reviewed and approved by the Engineer. For contracts which include the Inertial Profiler, HMA pay item, the 16 ft straightedge or the Inertial Profiler simulati ng the 16 ft straightedge shall be used to measure longitudinal smoothness on surface courses at the following locations:
9.All intersections with significant change in cross slope. For contracts where the inertial profiler is not used for smoothness acceptance, the 16 ft straightedge shall be used to measure longitudinal smoothness on all surface courses, and on any dense graded intermediate course immediately below the surface course. Measurement with the 16 ft straightedge shall include the above locations, all mainline traveled way lanes and ramps with posted speeds greater than 45 mph, and on ramp acceleration or deceleration lanes.
c.10 ft Straightedge 700 The 10 ft straightedge will be in accordance with 306.03(d). The 10 ft straightedge will be used to check transverse slopes, acr oss travel lanes and shoulders, approaches, and crossovers. When the 10 ft straightedge is used, the pavement variations shall be corrected to 1/8 in. or less.
d.Areas of Localized Roughness, ALR At locations where the inertial profiler is being used on an intermediate course, 401.18 320 all areas having a localized roughness in excess of 160 in./mi utilizing continuous IRI with a 25 ft window shall be corrected subject to approval by the Engineer. At locations where the iner tial profiler is being used on a surface course, all areas under category Type A, as defined in 401.19(c), having a localized roughness in excess of 160 in./mi or category Type B in excess of 170 in./mi utilizing continuous IRI with a 25 ft window shall be corrected subject to approval by the Engineer. After ALR's have been identified, a grinding simulation shall be performed to estimate whether the ALR can be corrected to an IRI value of less than 160 in./mi with no more than a 1/4 in. max grind depth at any spot. If such correction is not possible, then an ALR with an IRI value of less than 190 in./mi can remain uncorrected if approved by the Engineer, and an ALR with an IRI value greater than 190 in./mi shall require full depth removal and replacement of the surface course of sufficient area to meet specifications. 720 In addition, if there is only one ALR in any two lane mile section, then no smoothness correction will be required if the ALR does not exceed 190 in./mi and the overall smoothness in accordance with 401.18(d) of the two lane mile section does not require any corrective action. A two lane mile section will start one mile before the ALR and end one mile after the ALR in order that all two lane mile sections will have, at most, one ALR each.
e.Smoothness Section Correction The width of the corrected area may be partial or full lane width, depending on 730 the respective wheel path profiles. Underlying courses that are exposed by corrective action shall be milled to a depth of 1 1/2 in. and replaced with surface course. After the corrective action is taken on a surface cour se, the inertial profiler shall be operated throughout the entire affected smoothness section to verify the adequacy of the corrective action. At locations where the 16 ft straightedge is used, the pavement variations shall be corrected to 1/4 in. or less. If grinding of an intermediate course is used for pavement smoothness 740 corrections, the grinding shall not precede the surface placement by more than 30 calendar days if open to traffic. 401.19 Pay Factors
a.Dense Graded Mixture One Lot Pay factors, PF, are calcula ted for the air voids at N des, Vbe at N des and in-place density, %Gmm. The Percent Within Limits, PWL, for each lot will be determined in accordance with ITM 588. The appropriate pay factor for each property is calculated as follows: Estimated PWL greater than 90: 401.19 PF = ((0.50 x PWL) + 55.00)/100 Estimated PWL greater than 70 and equal to or less than 90: PF = ((0.40 x PWL) + 64.00)/100 Estimated PWL greater than or equal to 50 and equal to or less than 70: PF = ((0.85 x PWL) + 32.5)/100 If the Lot PWL for any one of the properties is less than 50, a sublot has an air void content less than 1.0% or greater than 8.0%, or a sublot has a volume of effective binder greater than 3.0% above design minimums, the lot will be referred to the Department’s Division of Materials and Tests for adjudication as a failed material in accordance with normal Department practice as listed in 105.03. Air voids, Vbe, and in-place density, %Gmm, PF values will be reported to the nearest 0.01. Rounding will be in accordance with 109.01(a). A composite pay factor for each lot based on test results for mixture properties and density is determined by a weighted formula as follows: Lot PF = 0.30(PF VOIDS ) + 0.35(PF Vbe) + 0.35(PF DENSITY ) where: Lot PF = Lot Composite Pay Factor for Mixture and Density PFVOIDS = Lot Pay Factor for Air Voids at N des PFVbe = Lot Pay Factor for Vbe at N des PFDENSITY = Lot Pay Factor for In-Place Density, % Gmm The lot quality assurance adjustment for mixture properties and density is calculated as follows: q = L x U x (Lot PF – 1.00)/MAF where: q = quality assurance adjustment for mixture properties and density of the lot L = Lot quantity U = Unit price for the material, $/ton Lot PF = Lot Pay Factor Lot test results for the air voids at N des, Vbe at N des, and density will be used to determine the Lot Pay Factors. 790 401.19 322 The specification limits for the air voids at N des, Vbe at N des, and density will be as follows: SPECIFICATION LIMITS Mixture LSL* USL** Air Voids at N des, % 3.60 6.40 Volume of Effective Binder at N des, % Spec Spec +2.50 Density LSL* USL** Roadway Core Density (%Gmm), % 93.00 n/a * LSL, Lower Specification Limit ** USL, U pper Specification Limit
b.Dense Graded Mixture < On e Lot and Open Graded Mixture A composite pay factor for each sublot based on test results for mixture properties and density is determined in a weighted formula as follows: Dense Graded Mixture: 800 SCPF = 0.30(PF VOIDS ) + 0.35(PF Vbe) + 0.35(PF DENSITY ) Open Graded Mixture: SCPF = 0.20(PF BINDER ) + 0.35(PF VOIDS ) + 0.45 where: SCPF = Sublot Composite Pay Factor for Mixture and Density PFBINDER = Sublot Pay Factor for Binder Content PFVOIDS = Sublot Pay Factor for Air Voids at N des PFVbe = Sublot Pay Factor for Vbe at N des PFDENSITY = Sublot Pay Factor for Density If the SCPF for an open graded sublot is less than 0.85 or the volume of effective binder is greater than 3.0% above design minimums, the sublot will be referred to the Division of Materials and Test s for adjudication as a failed material in accordance with 105.03. The sublot quality assurance adjustment for mixture properties and density is calculated as follows: q = L x U x (SCPF – 1.00)/MAF where: 820 401.19 323 q = quality assurance adjustment for the sublot L = sublot quantity U = unit price for the material $/ton SCPF = sublot composite pay factor Sublot test results for mixture properties will be assigned pay factors in accordance with the following: BINDER CONTENT Open Graded Deviation from DMF (±%) Pay Factor 1.05 0.3 1.04 0.4 1.02 0.5 1.00 0.6 0.90 0.7 0.80 0.8 0.60 0.9 0.30 1.0 0.00 >1.0 Submitted to the Division of Materials and Tests* * Test results will be considered and adjudicated as a failed material in accordance with normal De partment practice as listed in 105.03. VOLUME OF EFFECTIVE BINDER, Vbe Dense Graded Pay Factors Deviation from Spec Minimum > +3.0 Submitted to the Division of Materials and Tests* DQG 1.00 - 0.05 for each 0.1% above +2.5% > +2.0 and < +2.5 1.05 - 0.01 for each 0.1% above +2.0% > +0.5 and < +2.0 1.05 DQG 1.05 - 0.01 for each 0.1% below +0.5% -0.5 and < 0.0 1.00 - 0.02 for each 0.1% below 0.0% -2.0 and < -0.5 0.90 - 0.06 for each 0.1% below -0.5% < -2.0 Submitted to the Division of Materials and Tests* * Test results will be considered and adjudicated as a failed material in accordance with normal De partment practice as listed in 105.03. 401.19 324 AIR VOIDS Dense Graded Open Graded Pay Factor Deviation from Spec (±%) Deviation** (±%) 3.0 1.05 !DQG 7 > 3 DQG 4.0 1.00 4.1 0.98 1.8 4.2 0.96 4.3 0.94 4.4 0.92 1.9 4.5 0.90 2.0 4.6 0.84 4.7 0.78 4.8 0.72 4.9 0.66 5.0 0.60 > 2.0 > 5.0 Submitted to the Division of Materials and Tests* * Test results will be considered and adjudicated as a failed material in accordance with normal Department practice as listed in 105.03. ** Deviation shall be from 17.5% for OG25.0 mm and OG19.0 mm mixtures and shall be from 14.5% for OG9.5 mm mixtures. For mixtures produced during a plant’s adjustment period, pay factors based on the DMF with the above tolerances will be used to compute quality assurance adjustments. Sublot test results for density will be assigned pay factors in accordance with the following: DENSITY Percentages are based on %MSG Pay Factors, % Dense Graded 8.0 Submitted to the Division of Materials and Tests* 97.0 - 97.9 1.00 96.6 - 96.9 1.05 - 0.01 for each 0.1% above 96.5 95.0 - 96.5 1.05 94.1 - 94.9 1.00 + 0.005 for each 0.1% above 94.0 93.0 - 94.0 1.00 92.0 - 92.9 1.00 - 0.005 for each 0.1% below 93.0 91.0 - 91.9 0.95 - 0.010 for each 0.1% below 92.0 90.0 - 90.9 0.85 - 0.030 for each 0.1% below 91.0 9.9 Submitted to the Division of Materials and Tests* * Test results will be considered and adjudicated as a failed material in accordance with normal Department practice as listed in 105.03. 401.19 The pay factors will be rounded to the nearest 0.01.
c.Smoothness 840 Smoothness pay adjustments will only be applied when the smoothness is measured by an inertial profiler in accordance with 401.18(a). The Mean Roughness Index, MRI, will be determined utilizing a fixed interval for each lane for each 0.1 mile section of paving. The MRI for a 0.1 mile section will be the average of the IRI of the two wheel paths. Categorized segments shall be as follows: 1. Type A. Pavement on a non-interstate with more than a single opportunity to achieve a smooth ride or asphalt pavement on an 850 interstate with a single opportunity or more. The following operations, if performed on the contract, will be considered opportunities.
a.A layer of HMA base, intermediate, and surface; each layer is an opportunity. Wedge and level will not be considered an opportunity.
b.Profile milling to correct cross slope is considered an opportunity prior to placing base, intermediate, or 860 surface HMA.
2.Type B. Pavement that is not included in the description above under Type A. At locations where an inertial profiler is used to accept smoothness, a quality assurance adjustment will be determined for each lane. This adjustment will be applied to all QC/QA HMA pay items within the pavement section. The adjustment will be calculated using the following formula: 870 where: qs = quality assurance adjustment for smoothness for one section PFs = pay factor for smoothness n = number of layers A = area of the section, sq yd S = planned spread rate for material, lb/sq yd T = conversion factor: 2,000 lb/ton U = unit price for the material, $/ton. 401.19 The quality assurance adjustment for smoothness, Q s, for the contract will be the total of the quality assurance adjustments for smoothness, q s, on each section by the following formula: Qs T s When smoothness is measured by an inertial profiler, payment adjustments will 880 be made for any 0.1 mile section based on initial MRI generated on the surface course only and in accordance with the following ta ble. Smoothness correction, if required, shall be in accordance with 401.18(e). The MRI pay factors for smoothness will be determined prior to any required smoothness correction. PAY FACTORS FOR SMOOTHNESS Posted Speed greater than 45 mph MRI, in./mi. Pay Factor, PF over 0 to 35 1.06 over 35 to 40 1.05 over 40 to 45 1.04 over 45 to 50 1.03 over 50 to 55 1.02 over 55 to 60 1.01 over 60 to 70 1.00 over 70 to 75 0.99 over 75 to 80 0.98 over 80 to 85 0.96 over 85 to 90 0.95 over 90 For Type A, PFs will be 0.95 and the section shall be corrected to 70 or less. over 90 to 110 For Type B, PFs will be 0.95 and the section does not require correction. over 110 For Type B, PFs will be 0.95 and the section shall be corrected to 90 or less.