927The cost of concrete, reinforcing bars, conduits, ground rod, ground wire,

IN · 2024 Standard SpecificationsBook pages 910View official source ↗

reinforcing bars, conduits, ground rod, ground wire, grounding bushings, anchor rods, and all hardware required to complete the installation of the signal pole foundation shall be included in the cost of signal pole foundation. The cost of weatherhead, 1 in. conduit riser, entrance switch, 1 to 2 in. conduit reducer, ground rod, ground wire, and all hardware required to complete the 810 installation, including the meter base when required and supplied by the utility company shall be included in the cost of signal service. The cost of steel pole bands or straight ey e bolts, span, catenary, and tether of wire rope cables, cable rings, Type A support cable, wire rope clips, safety cable, thimble, service sleeve, and all hardware required to complete the installation as shown on the plans shall be included in the cost of span, catenary, and tether.

The cost of signal face hook-up wire, pol e plates and arms for side mounts, mid- mast arm mount, pipe arms, signal brackets, visors, louvers, bulbs, span hanger, 820 backplates, balance adjuster, weatherhead, and all additional hardware required to assemble a combination of signal faces as shown on the plans shall be included in the cost of traffic signal head.

The cost of removing the existing traffi c signal head, salvaging the existing LED indicators, replacing the existing signal head with a new housing and backplate, and reinstalling shall be included in the cost of traffic signal head, retrofit. The cost to repair or replace damaged or lost salvageable traffic signal equipment shall be at no additional cost to the Department. 830 The cost of excavation, backfill, final cleanup in accordance with 805.14, the cost of re-painting existing metallic equipment to be re-used, the preparation and transmittal of as-built drawings and controller assembly document packets, and necessary incidentals shall be included in th e cost of the pay items in this section.