943The insulation resistance test shall be made with a megohm meter and the 700

IN · 2024 Standard SpecificationsBook pages 965971View official source ↗

943 The insulation resistance test shall be made with a megohm meter and the 700 resistance to ground shall be no less than 50 megohms in all lighting circuit power cables. The meter shall be set for the voltage rating of the insulation. The continuity test shall be made with an ohmmeter prop erly scaled for measuring the resistance of the power cables. This test shall verify the following: 1. That each power cable is continuous to its termination points.

2.That the cable coding at junction and termination points is consistent with cable coding at the supply point.
3.That power cables are not crossed with the neutral or each other.
4.That the main circuit through each of its branches does not have unusual resistance values. The entire completed installation shall be tested by circuit or by such portions as may be selected and at night if direct ed. Tests shall demonstrate the following:
1.That all power, lighting, and control circuits are continuous, 720 free from short circuits, and free from unspecified grounds.
2.That all circuits are pr operly connected in accordance with applicable wiring diagrams.
3.That all circuits are operab le which shall be demonstrated by continuous operation of each lighting circuit for at least 1 h.
4.That voltage at the ends of each lighting circuit and at inter points is within allowable limits. A maximum of 10% voltage 730 drop will be allowed for each complete circuit.
b.Testing and Inspecting Luminaires The lighting system from the service point through the last luminaire shall be subjected to 14 days of normal operatio n prior to final acceptance. This testing procedure may be conducted separately on each circuit or on the entire system. Normal operation is defined as the luminaires being on during the darkness hours and off during the daylight hours as controlled by the service point photocells and relay switches. Malfunctioning equipment shal l be replaced or repaired before final 740 inspection. The pattern of light and correl ated color temperatur e delivered to the pavement by roadway, high mast, and underpass luminaires will be inspected at night. At this inspection, the proper tools, equipment, and personnel shall be available to make all adjustments. These items shall sp ecifically include a bucket truck capable of 807.16 944 reaching all luminaires in the system, safety equipment, and a level to determine the proper luminaire position. Within 30 calendar days after completion of the work, as-built drawings shall be submitted in electronic format to the Engineer. The lighting as-built drawings shall indicate the as-built location of light poles, high mast towers, service points, conduit 750 runs, and lighting handholes.

807.17 Pay Item and Installation Summary Sheets

Prior to final inspection, two sets each of installation summary and pay item summary, each marked Final Record, shall be furnished for the light pole as installed. The installation summary shall show the effective mounting height, mast arm length, foundation elevation, pay item, type of base, and catalog number or drawing for each light pole furnished. The pay item summary shall indicate the pay item, quantity, effective mounting height, mast arm length, and type of base for each type of light pole furnished. 760

807.18 Method of Measurement

Luminaire, light pole with mast luminaire arm, high mast tower, identification number, connector kit, multiple compression fitting, insulating link, foundation, handhole, service point, and cable marker will be measured by the number of units installed. Pole circuit conductor and circuit conductor in conduit will be measured by the linear foot. Pole circuit conductor will be measured from the base of the light pole to the terminal block of the luminaire. Pole line extension will be measured in a straight line between each pole. Conductor in bridge conduit will be measured by the linear foot from end to end of conduit or from the end of conduit to the last bridge light pole foundation entry. An allowance of 5 lft will be made for each fo undation entry. An allowance of 2 lft will be made for each junction box. Removal of existing light structure, which shall include the pole, mast arm, and foundation, will be measured by the number of units removed. Cable-duct and conductor in underground duct or conduit will be measured by the linear foot as follows: 780

a.From the face of the concre te foundation to the center of the handhole or face of the next conc rete foundation. An allowance of 5 lft will be made for each entry at foundations. An allowance of 2 lft will be made at handholes for connection purposes.
b.From light pole bases or handholes to switch boxes at underpasses. An allowance of 4 lft will be made at the switch box for electrical connections. 790 807.17 945 (c) From end to end of the conduit when the cable is in conduit under a roadway surface or shoulder. No measurement will be made for cable-duct in conduit where it is part of a service point, sign installation, or underpass lighting system.

807.19 Basis of Payment

Luminaire will be paid for at the contract unit price per each for the type specified. Service point will be paid for at the contr act unit price per each for the type specified. Light pole will be paid for at the contract unit price per each for the estimated mounting height, length of mast arm, and base type specified. High mast tower will be paid for 800 at the contract unit price for the specified mounting height. Lighting foundation, concrete, with grounding will be paid for at the contract unit price per each for the size specified. If class X material is encount ered during lighting foundation excavation, payment will be made for such excavation in accordance with 206. Partial payment for lighting foundation in the amount of 80% will be made if all such work is complete except for finish grading and sodding. The remaining percentage of payment will be made upon completion of the finish grading and sodding. 810 Connector kit will be paid for at the contract unit price per each for fused or unfused, as specified. Multiple compression fitting and insulation link will be paid for at the contract unit price per each for wate rproofed or non-waterproofed, as specified. Cable-duct marker, high mast tower winch driv e, and handhole, lighting will be paid for at the contract unit price per each. Sign, underpass, and roadway lighting location identification will be paid for at the contract unit price per each. Circuit installation will be paid for at the contract unit price per each for the type, structure number, and number of luminaires specified. Light structure, remove and portable tower lighting drive system will be paid for at the contract unit price per each. 820 Wire will be paid for at the contract unit price per linear foot for the designation, copper gauge, housing, and number of conductors specified. Pole circuit cable, Type THWN, stranded will be paid for at the contract unit price per linear foot for the copper gauge and number of conductors specified. Conduit, steel, galvanized, 2 in. diameter will be paid for at the contract unit price per linear foot. Payment will be made under: Pay Item Pay Unit Symbol Cable, Pole Circuit, THWN, No. _____ Copper, Stranded, _____ _____/ C ............................................... LFT Cable-Duct Marker .................................................................... EACH Circuit Installation, Str. No. ___, ____ Luminaires ................... EACH no. Conduit, Steel, Galvanized, 2 in. ............................................... LFT 807.19 946 Connector Kit, Fused ................................................................. EACH Connector Kit, Unfused ............................................................. EACH Handhole, Lighting .................................................................... EACH High Mast Tower, ____ ft E.M.H. ............................................ EACH 840 High Mast Tower Winch Drive ................................................. EACH Insulation Link, Non-Waterproofed .......................................... EACH Insulation Link, Waterproofed .................................................. EACH Light Pole, ___ ft E.M.H.,___ ft Mast Arm, ___ Base .............. EACH Light Structure, Remove ........................................................... EACH Lighting Foundation, ____ Concrete, with Grounding .............. EACH type Luminaire, High Mast ............................................................... EACH Luminaire, High Lumen Roadway ............................................ EACH Luminaire, Low Lumen Roadway ............................................. EACH 850 Luminaire, Sign ......................................................................... EACH Luminaire, Underpass................................................................ EACH Multiple Compression Fitting, Non-Waterproofed ................... EACH Multiple Compression Fitting, Waterproofed ............................ EACH Portable Tower Lighting Drive System ..................................... EACH Service Point, _____ .................................................................. EACH type Sign, Underpass, and Roadway Lighting Location Identification ....................................................... EACH Wire, ____, No. _____ Copper, in ____, ____ ___ /C .............. LFT 860 designation gauge housing The cost of circuit breakers; breaker en closures; conduit; flexible conduit; conduit fittings; grounding; weatherhead; aerial cable termination; and incidentals required from the last luminaire to the point of attachment by the utility, the bottom of the riser at the structure base, or the connector kits in the base of the sign supports shall be included in the cost of circuit installation. If not listed in the Schedule of Pay Items, the cost of connector kit, fused or unfused, multiple compression fitting and insulation link, waterproofed or non- 870 waterproofed, shall be included in the cost of the other items. The cost of aerial distribution service, drops to sign structures branching off from the pole line extension, weatherheads and risers required to connect the line extension to the underground electrical distribution circuit, all anchorage guy wires, hardware, aerial cable, electrical connections, timber pol es, and incidentals required to complete the pole line extension shall be included in the cost of cable, pole circuit. The cost of the mast arm, J-support hook for pole circuit, handhole with cover, shoe base, transformer base or frangible coupling if required, installation of the pole 880 on the foundation with the pole circuit shall be included in the cost of light pole. 807.19 947 The cost of the pole; lowering system including winch assembly, power cable, and support cable; concrete pad; luminaire ring; anchor bolts and nuts; lightning rod assembly; grounding system; and all incident al materials necessary to complete the installation shall be included in the cost of high mast tower. The cost of excavation, concrete, sleeves for cable-duct, non-metal pipe, reinforcing bars, backfill, finish grading, and sodding shall be included in the cost of lighting foundation. The cost of wood poles, multiple rela y switches, service cabinet, photocells, 890 photocell receptacles, weatherhead, conduit, and other miscellaneous items shall be included in the cost of the service point. The cost of lamps, LED arrays, plasma emitters, drivers, optical systems, weatherproof housings, surge protection devices, electrical connections, and installation of the luminaire on the pole shall be included in the cost of luminaire. The cost of snap-on coverings in light pole bases and waterproof coverings in underground handholes shall be included in the cost of multiple compression fitting. The cost of maintaining highway illumination during the life of the contract and the preparation and transmittal of as-built drawings shall be included in the cost of other pay items.

Source: Indiana Standard Specifications, 2024 Edition. Pages 965971 of 1,248.