The Contractor shall use methods and Equipment capable of performing the Work specified in the Contract. The Contractor shall ensure the Equipment does not damage the Roadway, adjacent property, or other Highways. When methods and Equipment are specified in the Contract, the Contractor shall request permission from the Engineer, in writing, to use alternate methods and Equipment. The Contractor shall describe the proposed methods and Equipment and the reasons for the change . The Contractor shall perform the Work in accordance with the original basis of payment and Contract Time. When methods and Equipment are not specified in the Contract, the Contractor may use any methods and Equipment that complete the Work in accordance with the Contract requirements. The Contractor shall discontinue performing the Work using alternate methods or Equipment, if the Work does not meet the Contract requirements. The Contractor shall remove and replace or repair unacceptable Work at no additional cost to the Department.
Get an email when 1805 changes
Minnesota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.