409.1 Description. This work shall consist of placing bituminous material followed by placing cover aggregate
material.
409.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as
follows: Item Section Aggregate for Seal Coatsa 1003 aThe grade of aggregate will be specified in the contract
409.2.1 Seal coat aggregate shall be tested for gradation and deleterious material by the contractor for every
2,500 tons of production, and shall be tested for gradation and deleterious material by the engineer for every 10,000 tons of production.
409.2.2 All limestone and dolomite shall be either pre-coated as specified herein or fog sealed in accordance
with Sec 413.
409.2.3 Emulsified asphalt or polymer modified emulsions shall be in accordance with Sec 1015, with the
following exceptions: Asphalt Emulsion Requirements Tests on Asphalt Bindera Test Method MinimumMaximum Penetration @ 77°F ASTM D 5 60 150 Elastic Recovery @ 50°F, %AASHTO T 30165 --- aThese tests shall be done on the asphalt residue for emulsions and cutbacks.
409.2.4 Pre-coating binder shall be in accordance with Sec 1015 for PG binder or emulsions.
409.3 Job Mix Formula. The contractor shall submit the mix design to the laboratory for approval no less than
two weeks prior to placing the seal coat.
409.3.1 The mix design shall contain the following information:
409.3.1 1 The target binder application rates for each aggregate grade, as found in Sec 1003, shall be:
Grade A1 A2 B1 B2 C Target Binder Application Rate, gal/sya0.380.280.380.280.38 aCorrections to the rate listed may be included in the plans
409.3.2 A surface condition, aggregate properties and traffic volume correction may be provided in the plans.
This assessment will contain an allowable variance from the binder application rate. The aggregate application rates shall not vary from the mix design by more than ± 5 pounds per square yard.
409.4 Equipment. Equipment shall be capable to perform the following:
409.5 Construction Requirements.
409.5.1 Weather Limitations. Bituminous material shall not be placed on any wet surface. Seal coat shall only
be placed when the ambient temperature and the temperature of the pavement on which it is to be placed is above 60 F. Temperatures shall be obtained in accordance with MoDOT Test Method TM 20.
409.5.1 1 Forecasted Weather. No seal coat shall be placed when the forecast from the National Weather
Service predicts ambient temperatures falling below 40 F within 24 hours of construction.
409.5.2 Surface Preparation. The surface shall be thoroughly cleaned or swept to remove all dirt, packed soil,
or any other foreign material prior to spraying the bituminous material.
409.5.3 Application of Bituminous Material.
409.5.3 1 Bituminous material shall be uniformly applied within the temperature range recommended by the
manufacturer. Any bituminous material applied on adjacent Portland cement or asphaltic concrete pavements, curbs, bridges or any areas not specified to be sealed shall be removed by the contractor, at the contractor’s expense.
409.5.3 2 When pre-coating is required, the cover aggregate shall be pre-coated at a minimum rate of 0.5 percent
residual asphalt by weight of aggregate.
409.5.4 Compaction. All aggregate shall be uniformly seated over the entire area being sealed in a manner
which minimizes aggregate loss and prevents crushing of aggregate.
409.5.5 Dust Control. The contractor may be required to control dust should airborne dust become a concern,
or as directed by the engineer.
409.5.6 Loose Aggregate. Loose aggregate shall be removed from curbs, gutters, sidewalks, driveways, and
other areas designated by the engineer.
409.6 Traffic Control.
409.6.1 During application of the seal coat, the contractor shall control traffic through the work zone by means
of pilot vehicles traveling at a maximum speed of 35 miles per hour. The contractor shall designate a responsible person for receiving and resolving damage claims made by the public. This person shall be available by telephone during the contractor's normal business hours Monday through Friday.
409.6.2 The contractor shall provide contact information signs with their company name and phone number on a
variable width by 24 inch tall sign with black lettering on an orange background. The first line shall state “CONTRACTOR” in uppercase 4 inch C highway font, the second line shall contain the contractor name in upper/lower case 4 inch B highway font and the third line shall contain the contractor’s phone number in 4 inch C highway font. Signs shall be posted near the beginning and end of the project limits as approved by the engineer.
409.7 Basis of Acceptance. Acceptance shall be made no less than 14 days from completion of the route. Seal
coat will be evaluated for acceptance by the engineer based on the following criteria:
409.8 Method of Measurement.
409.8.1 Final measurement for aggregate in the completed seal coat will not be made except for authorized
changes during construction, or where appreciable errors are found in the contract quantity.
409.8.2 Where required, measurement of seal coat, complete in place, will be made to the nearest square yard
for aggregate.
409.8.3 Final measurement for binder will be made to the nearest gallon in accordance with Sec 1015. Any
revision or correction will be computed and added to or deducted from the contract quantity.
409.9 Basis of Payment. The accepted quantities of seal coat aggregate and binder, in place, will be paid for at
the contract unit price. No separate payment will be made for pre-coating aggregate, fog sealing, dust control, or for providing and installing contract information signs. If the binder application rate includes a correction factor, it is included in the plan quantities.