557.01 Description

This work is the furnishing and installing of steel bridge railing.

557.02 Materials

Furnish materials in accordance with the following subsection requirements: Fiber-reinforced Pads for Rail Post Base Plates ...... 711.16 Galvanized Metal .................................................... 711.08 High Tensile Strength Anchor Bolts ......................... 711.06 Steel Beam Guardrail and Wood Blocks.................. 705.01 Structural Steel........................................................ 711.02 Structural Steel Tubing ............................................ 711.03

557.03 Construction Requirements

557.03.1 Fabrication Drawings

Furnish fabrication drawings for steel bridge railing in accordance with Subsection 556.03.2.

557.03.2 Fabrication

Fabricate steel bridge railing in accordance with Section 556.

557.03.3 Erection

Construct steel bridge railing as shown in the contract. Adjust the completed railing to compensate for any unevenness in the structure. Ensure all rail posts are vertical. Do not place railing on a span until centering or falsework is removed. Place rail post base plates on fiber- reinforced pads, sized and positioned to project a minimum ½-inch (13 mm) on all sides of the base plates.

557.03.4 Painting

Clean and paint steel bridge railing specified to be painted in accordance with Section 612.

557.04 Method of Measurement

Steel bridge railing of the type or types specified is measured by the foot (m). Measurement is based on the computed horizontal distance between the centerlines of end base plates.

557.05 Basis of Payment

Payment for the completed and accepted quantities is made under the following: Pay Item Pay Unit Bridge Railing Foot (m) Partial payments of steel bridge railing will be made based on the total quantity as follows:

1.90% when erected.
2.95% when bolted and spot painted.
3.100% when painted in compliance with the contract.

Steel Bridge Railing in other states

Get an email when 557 changes

Montana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Road and Bridge Construction, 2020 (v5.1) Edition. Pages 367–368 of 611. View official source ↗

Ask about this section

Scoped to Montana 2020 Standard Specifications for Road & Bridge Construction, Section 557 — Steel Bridge Railing. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.