612.01 Description
This work is the surface preparation, painting, coating, and finishing requirements of steel components.
612.02 Materials
Furnish material in accordance with Section 710. Provide coatings from a single manufacturer. If multiple products or coats are required and/or allowed submit documentation from the manufacturer(s) that those products are compatible with one another. All structural steel requiring a topcoat of a Triglycidyl Isocyanurate (TGIC) Polyester powder must receive a zinc rich primer coat prior to the application of the topcoat. Use paint materials suitable for the environment in which they will be exposed. Verify all film thicknesses for each coating applied using SSPC-PA 2. The contract or Project Manager will specify the final coat color.
612.02.1 Paint Coating Systems
A.New Structural Systems. Furnish the products necessary for a three-coat system consisting of inorganic zinc primer, a mid-coat of high build epoxy, and a topcoat of urethane. Do not paint weathering steel unless specifically stated.
B.Bridge and Pedestrian Rails. Furnish a system meeting New Structural Steel Requirements or a TGIC powder coat system.
C.Pipe Piling and Casings. Furnish a two-component self-priming epoxy.
D.Cattle Guards. Furnish a paint system composed of a prime coat and aluminum finish coat or aluminum epoxy paint.
E.Existing Structural Steel. If existing steel is to be painted, the contract requirements will specify whether to fully remove the existing paint, or to apply additional paint over an existing coating.
1.Full Removal of Existing Paint. Furnish a system meeting New Structural Steel Requirements. Except use an organic zinc primer.
2.Overcoat. Provide a 3-coat system that can be applied over the existing coating without causing the existing paint to debond.
F.Miscellaneous Items. Furnish one of the following: 2-component aluminum epoxy paint, 2-component self-priming epoxy, zinc phosphate alkyd, leafing aluminum paint, a 3 coat system, or TGIC powder coating.
612.03 Construction Requirements
Paint all new structural steel surfaces, except those noted in Subsection 612.03.4(C)1. Do not paint weathering steel unless specifically stated. Prevent environmental pollution including water and air pollution caused by paint, paint spray, paint chips, dust, or other harmful materials in accordance with all federal, state, and local regulations and requirements.
612.03.1 Submittals
Submit the following for review:
A.Material Products (Paint, Thinners, Caulks, Abrasives, etc.) Submit a written description of the complete coating system, along with the thinners, caulks, abrasives, etc.to be used for the contract for review. 612 – STRUCTURE FINISHES 2020 EDITION V5.1 612-2 Include in the written submittal the manufacturer’s product information including but not limited to paint characteristics, surface preparation, film thickness recommendation, safety data, repair procedures and application recommendations. Bring conflicts between the coating system submittal and the specifications to the Project Manager’s attention for resolution. Submit a proposed sampling and testing plan that will be used to show the proposed overpaint is compatible with the existing paint. Include the number and size of samples to be provided as well as the tests that will be performed to ensure compatibility. Upon approval of the sampling and testing plan, sample the existing paint, test, and provide the test results with certification that the proposed paint system is compatible with the existing paint.
B.Environmental Pollution Controls. Submit a work plan that meets OSHA and EPA regulations covering the following sections. Obtain a qualified environmental professional (e.g., industrial hygienist, environmental scientist, etc.) to assist with the workplan development and documentation submittal detailed in item 6 below. The workplan must describe the work procedures to be utilized for removing lead-based paint including procedures to containerize and dispose of removed paint waste and ways to protect the environment and workers.
1.Containment. Design a containment system in accordance with the Society for Protective Coatings (SSPC) Guide 6, Class Guide for Containing Debris Generated during Paint Removal requirements except that permeable wall materials cannot be used. The containment system may be located on or off the project site. Submit shop drawings and design calculations for containment systems attached to the structure. Include design calculations that address all load conditions on the structure resulting from the containment system including debris. Specify ventilation and negative pressure equipment capacity, layout, and related calculations. The structural design of containment systems attached to the structure must be stamped by a professional engineer registered and licensed to conduct engineering in the State of Montana.
2.Removal Procedures. Describe the procedures utilized to remove lead-based paint in locations indicated elsewhere in the contract or as directed.
3.Worker Protection. Meet the OSHA lead standards of Title 29, CFR 1926.62. and any state and local regulations required for the workers protection. Describe medical surveillance, exposure monitoring, respiratory protection, personal hygiene, employee training, employee access to records, hazards communication and a compliance program to reduce lead exposure to within the permissible exposure limits. Exposure monitoring must meet the National Institute of Occupational Safety and Health Method 7028.
4.Storage and Testing. Store all generated waste which includes but is not limited to spent abrasives, paint scraps, and wastewater material in properly labeled metal containers approved for hazardous waste transport while waiting test results. Generated waste material must be stored on the project limits. Test waste material for proper waste classification. If tests indicate material is hazardous waste, obtain EPA Hazardous Waste Generator ID Number for MDT. An EPS Hazardous Waste Generator ID Number will be needed for each bridge location.
5.Disposal. Dispose of all generated waste that includes but is not limited to spent abrasives, paint scrapings and wastewater in accordance with applicable regulations, that may include RCRA regulations (40 CFR Parts 266-299) will be collected, stored, 2020 EDITION V5.1 STRUCTURE FINISHES – 612 612-3 and disposed of. Comply with all storage and transportation requirements. Include inspection of storage area to verify no material escaped storage and entered environment. This includes both hazardous and non-hazardous waste.
6.Documentation. Provide documentation regarding waste disposal information, waste manifests, information that demonstrates no lead or other toxic materials were released into the environment from the work area, containment system integrity, storage area and that all work was conducted in accordance with the workplan.
7.Staging and Scaffolding. Submit for approval planned use of an existing structure for attachments of scaffolding or staging.
612.03.2 Containment System Requirements by Method of Preparation.
Prevent paint chips and abrasive blasting media from falling into rivers, streams, wetlands, wetland buffers, or other bodies of water and when specified, from falling onto the ground. Should spills or releases of paint chips occur, clean up immediately and report to Project Manager.
A.Washing. When pressure washing newly installed steel coated only with inorganic zinc primer, the surfaces may be washed without any containment or collection of the water if approved by the Project Manager. Prevent spray and runoff water from entering traveled areas such as roadways, walkways, railroads, etc.
1.When pressure washing paint containing toxic metals or inorganic zinc/vinyl systems, the containment must meet SSPC Class 2W. All wash water and debris must be collected and disposed of in accordance with the applicable regulations. Prevent paint chips from falling onto the ground.
2.When pressure washing all other systems (systems other than inorganic zinc, other than inorganic zinc/vinyl, or systems that contain toxic metals), collect all dislodged paint chips, but the water need not be captured. When dislodged paint chips are collected on suspended containment screens, the maximum mesh opening is 17 mils. When working over ground, chips may be collected from the ground in lieu of utilizing containment screens, provided all chips are collected before the end of the shift. Dispose of collected paint chips and debris per applicable regulations.
B.Power Tool and Hand Tool Cleaning. SSPC Level 1 visible emissions criteria apply when any paint is disturbed by dry methods such power tool cleaning.
1.If paint system contains toxic metals, provide containment for open power tool cleaning meeting SSPC Class 2P. Store and dispose of collected paint chips and debris in accordance with the applicable regulations.
2.If paint system does not contain toxic metals, provide containment for open power tool cleaning meeting SSPC Class 3P. Store and dispose of collected paint chips and debris in accordance with the applicable regulations.
3.For roadway joints and other small areas approved by the Project Manager, High Efficiency Particulate Air (HEPA) filter vacuum shrouded power tools may be used in lieu of containment in areas of paint containing toxic or nontoxic metals. Vacuum- shrouded power tools may eliminate the need for containment if it can be demonstrated that all paint chips and debris are collected by the vacuum.
C.Total Paint Removal by Abrasive Blast Cleaning. Prevent paint chips and abrasive blasting media from falling onto the ground. SSPC Level 1 Visible Emissions apply when any paint is disturbed by dry methods such as abrasive blast cleaning.
1.When removing coatings by abrasive blast cleaning (regardless of the presence of toxic metals), meet SSPC Class 2A containment. Dispose of collected paint chips 612 – STRUCTURE FINISHES 2020 EDITION V5.1 612-4 and debris per the applicable regulations. Meet ambient air and worker exposure requirements established by the EPA and OSHA. Maintain containment systems while work is in progress. Do not deviate from the approved working drawings. Deny public access to all rigging, scaffolding, containment systems, and work sites at all times.
2.When cleaning structures over water, provide a skimming boom for emergency backup consisting of a float with a skirt or other approved system is to be employed immediately to collect floating debris. Clean the skimming boom at least once a day. Upon completion of the project, clean the skimming materials or if cleaning is not possible or practical, dispose as hazardous or nonhazardous waste as applicable.
D.Competent Person. Provide a competent person on site, full time when abrasive blasting or paint containing toxic metals is being disturbed. This person must perform all quality control related functions involving the oversight of worker and environmental protection , containment performance, and waste handling. Provide documentation of qualifications , including experience and records of training. This person must hold a current SSPC C3 Competent Person Certificate or current C5 refresher certificate.
612.03.3 Surface Preparation
Prepare a test area to define the level of surface preparation needed. This area is to be approved by the Project Manager. If the paint manufacturer recommends a higher degree of surface preparation, use the manufacturer’s recommendations. Hand-clean the steel bridge bearing components containing PTFE, stainless steel, and neoprene pads to prevent surface damage. Remove fins, tears, slivers and burred or sharp edges by grinding and re-clean the area as specified before coating. Remove blast residue from steel surfaces with clean brushes, compressed air (free of oils), or commercial grade vacuum equipped with a brush-type cleaning tool, or by double blowing. Guard angles, pier nose angles, deck expansion joints and other small structural steel elements may be prepared for painting defined by SSPC-SP 2, SSPC-SP 3, or SSPC-SP 10 as approved. After cleaning, keep steel dry and dust free and prime within 24 hours after cleaning. If the surface becomes contaminated or corrosion redevelops, the surface must be recleaned to meet specifications prior to the application of the primer coat.
A.New Structural Steel. Brush-off blast clean to SSPC-SP 7 requirements all new steel that is not to be painted. Solvent wash to SSPC-SP 1 requirements, then blast to SSPC- SP 10 (near white) all new steel that is to be painted with the 3-coat system. The surface profile for all new steel being painted is to be between 1.5 and 3.5 mils, or as specified by the paint manufacturer.
B.Steel Pipe Piling and Casings. Solvent wash to SSPC-SP 1, then commercial blast to SSPC-SP 6 all portions of steel pipe piling and casing that are to be painted.
C.Existing Structural Steel (no paint present). Clean all zone painting/spot repair surfaces in accordance with SSPC-SP 2 (hand tool cleaning) or SSPC-SP 3 (power tool cleaning) after solvent cleaning per SSPC-SP 1. Brush-off blast cleaning to an SSPC-SP 7 can be used in lieu of hand and power tool cleaning if approved by the Project Manager. Where the entire structure is to be cleaned, clean in accordance with SSPC-SP 10 near white blast.
D.Existing Structural Steel (overcoat existing paint). Clean areas of loose paint as described in Subsection 612.03.3(C ) . Feather the edges of old paint permitted to remain. Roughen and de-gloss the surface and remove portions of paint on previously painted surfaces that are chalky, powdered, cracked, or otherwise unacceptable. Remove runs 2020 EDITION V5.1 STRUCTURE FINISHES – 612 612-5 and sags in the existing paint on the outside facing surfaces of fascia beams over highways. Ensure a smooth appearance after application of the new coating.
E.Existing Structural Steel (full paint removal). Clean all surfaces in accordance with SSPC-SP 1 and SSPC-SP 10 Near White Blast.
F.Surface Cleanliness and Profile. Clean and establish a surface profile on the steel as if it were new structural steel.
G.Galvanized Surfaces. Prepare all surfaces in accordance with the coating manufacturer’s requirements. Submit the coating manufacturer recommendations prior to start of work.
H.Surface Condition Prior to Painting. Remove residual dust, dirt, and grease from the surface as the final procedure prior to painting and between coats whenever the coating is contaminated. Cleaning includes the removal of all dust, puddles, grease, oil, exhaust from trucks, debris, concrete spatter, and other foreign matter on the surfaces being painted. Remove debris on surfaces adjacent to those being painted. Concrete spatter stains that discolor the primer need not be removed provided the material is not dislodged when wiping the surface with a cloth. Cleaning involves vacuuming, solvent cleaning, hand/power tool cleaning, and pressure washing as appropriate. Should an area of previously cleaned steel become soiled, contaminated, or rusted, reclean the area prior to painting at no additional cost to the Department.
I.Prior to Application of Paint. The quality control (QC) personnel will inspect the surfaces and verify that they have been prepared according to the Contract. Upon QC acceptance, obtain approval from the Project Manager that the surfaces to be painted during that day have been cleaned as specified. All hooks, cables, beam clamps, outriggers etc. must be moved during cleaning operations to allow the underlying surfaces to be cleaned according to the contract documents.
612.03.4 Painting
Protect pedestrian, vehicular, and other traffic upon or under the structure, the superstructure and substructure against damage or disfigurement by splatters, splashes, smirches, or over- spray of paint material. Clean all surfaces with paint damage at the contractor’s expense.
A.General. Allow each coat of paint to dry before applying succeeding coats. Follow the manufacturer’s recommendations for recoat times. The Project Manager may stop painting operations at any time if current or impending weather conditions could cause unsatisfactory coating performance. Always provide the Project Manager and Inspectors with ready and safe OSHA approved access to all areas of the structure that require inspection. The Project Manager will suspend work for unsafe or inadequate access to work. Ensure all fabrication inspections are complete prior to painting. Thin paint only as recommended by the manufacturer. Submit as required thinning procedures set forth by the manufacturer in advance for approval by the Project Manager.
B.Paint Representative. Furnish the services of a painting technical representative from the paint manufacturer at the beginning of paint application to notify the Project Manager that surface preparation is adequate and to provide technical assistance to the Contractor in application methods that may be unique to the product used. Keep this technical representative on-call as required during operations. 612 – STRUCTURE FINISHES 2020 EDITION V5.1 612-6 Do not apply paint until surface preparation has been approved by the Project Manager. Do not apply additional or subsequent coats of paint without the Project Manager’s approval.
C.Application. Apply paint in accordance with Subsection 612.02 Apply paint by brush or spray following the paint manufacturer’s recommendations to produce a uniform coat to the metal or previous paint coat. If using brush painting, thoroughly coat surface irregularities and brush out and smooth to produce an even paint film thickness. Use spray pressure tanks with an agitator to thoroughly stir the paint. If surfaces are inaccessible or have limited access to paint brushes, paint with sprayers or daubers made for that purpose. Limited Access is defined as a location where the physical characteristics or configuration of the structure restricts the use of a surface preparation or paint application tool at that location. A location is not considered Limited Access if additional time will allow for the proper cleaning or painting of the area, or if commercially available tools are available to clean or paint the area (e.g., angle nozzles, or short nozzles in place of traditional long nozzles for blast cleaning). Keep newly painted surfaces protected from environmental conditions that could damage the applied coating until the paint has dried or weather permits removal of cover as required by the coating manufacturer.
1.Shop Paint. Apply a shop coat to all metal surfaces unless otherwise specified. Do not paint surfaces in contact with other metal surfaces or concrete, except as noted in Subsection 612.03.6(A) . This includes faying surfaces and contact surfaces of nuts, bolts, and washers for bolted connections. Apply shop coat immediately after fabrication, shop inspection, and shop cleaning are complete, and the work is accepted. Do not load materials for shipment until paint is dried per the coating manufacturer’s recommendations. Do not apply field coats in the fabrication shop except by written approval of the Project Manager. Use erection marks for field identification of members on painted surface. Use paint for marking that is compatible with the shop coat and the first field coat. Cover erection marks, fabricator’s name, and other identification with subsequent coats.
2.Spot Painting. Field clean masonry and sole plates, bottom of expansion devices and all parts of steel inaccessible for painting after erection as noted above. Spot coat and apply all field coats before erection. Paint on site and allow drying thoroughly before assembling. Handle painted material carefully to prevent damage. Repair and repaint damaged surfaces at no cost to the State. Apply the spot coat after erection and field cleaning is approved by the Project Manager, to the edges of plates, rolled shapes and to the heads of bolts and nuts and areas where the shop coat has been damaged. Where the shop coat is damaged, the Project Manager may require a substantially complete reconditioning or replacement of the shop coat. This painting is considered spot painting and is done at no cost to the Department. Reseal small cracks and cavities not sealed by the first field coat with a zinc paste before the second field coat is applied. Submit documentation from the paint manufacturer that indicates the zinc paste proposed for use is approved by the manufacturer to the Project Manager. 2020 EDITION V5.1 STRUCTURE FINISHES – 612 612-7
3.Stripe Coat Requirements. Stripe coat the primer and second (Intermediate) coat. Striping of the primer coat is permitted after the full application of the primer coat is completed and recoat times are met. Tint both stripe coats in accordance with the manufacturer’s recommendation. Apply the stripe coat for both the primer and second coat using a brush, dauber, or roller to all edges, corners, lattice, angles, rivets, bolts, nuts, washers, welds, sharp and or thin edges. Do not thin paint without written approval.
D.Paint Storage and Mixing. Store paints and thinners in well -ventilated areas that are not subject to excessive heat, open flames, electrical discharge, and direct rays of the sun. Adhere to the manufacturer’s recommendations. Store materials in heated areas when necessary. Use materials on a rotating stock basis, and leave containers closed until used. Do not use paints that cannot be stirred to normal consistency. Store paint in tightly covered containers at an ambient temperature of at least 45 °F. Maintain containers in a clean condition, free of foreign materials and residue. Remove and discard thin skins formed in the container. Do not use material that is livered, gelled, thick skinned, or otherwise questionable. Mix paints per manufacturer’s instructions and as approved. Do not thin the paint unless authorized by the paint manufacturer and approved. The Inspector must be present whenever the paint is thinned. Do not use materials that are beyond their pot life or shelf life. For multiple component paints, only complete kits can be mixed and used. Partial kit mixing is prohibited. Remove waste chemical solutions, oily rags, and other waste daily. Take precautionary measures to ensure protection of workers and work areas from fire hazards and health hazards resulting from handling, mixing, and applying materials. Minimum dry film thicknesses (DFT) are shown in Table 612-1, unless in conflict with the manufacturer recommendations. Verify the film thickness for each coat applied per SSPC-PA 2 prior to the application of subsequent coatings. TABLE 612-1 MINIMUM DRY FILM THICKNESS Paint System Minimum Dry Film Thickness Three coat system Primer: 3 mils (above peaks of surface profile) Second coat: 4 mils Finish coat: 2 mils Epoxy paint for pipe piles and casings First 2 coats with total DFT of 12 mils Final coat: 3 mils Epoxy mastics for misc. structural steel 3 mils per coat for new steel or existing coatings 5 mils per coat for lightly rusted surfaces. Two-component epoxies 4 mils per coat 6 mils over light rust Calcium sulfonate alkyd 5 mils per coat Zinc phosphate alkyd 3 mils for primer coat 1 mil for finished coat Aluminum epoxy paint: 5 mils per coat
612.03.5 Weather Conditions
Apply paint using manufacturer’s recommendations for temperature (air, substrate, and paint material), dew point, and relative humidity or as follows, whichever is more restrictive. 612 – STRUCTURE FINISHES 2020 EDITION V5.1 612-8 Do not apply paint when ambient temperature is at or expected to drop below 40 °F (4 °C) within 2 hours. Do not apply paint when rain, snow or condensation is expected within 2 hours after application at the location where paint is applied. Do not apply paint when the temperature and humidity cause condensation on the surface to be painted. Do not apply paint to metal with surface temperatures over 110 °F (43 °C) or when the surface temperature causes the paint to blister or produce a porous paint film. Neither weather conditions nor Department acceptance of paint materials negate the Contractor’s responsibility for satisfactory application of paint. If the painting is unsatisfactory, remove paint, thoroughly clean the surfaces, and repaint at no cost to the Department. The painting is unsatisfactory if: • Rusting occurs. • The paint coat lifts. • Blisters. • Wrinkles. • Pinholes. • The paint has excessive runs or sags. • The paint shows evidence of application under unfavorable conditions. • The workmanship is poor. • Inadequate thickness of paint. • Impure or unauthorized paint has been used; or • For other reasons determined by the Project Manager.
612.03.6 Steel Components
A.Metal Bridge Rail. Apply all coats to the following contact areas before erection: • rail to post contact surface. • expansion sleeves; and • rail post base plates. Apply required field coats to the rest of the rail after erection, fit-up and final adjustment of the rail to line and grade.
B.Steel Pipe Piles and Casings. Paint piles and casings as described in Subsections
559.03.8 and 612.03.4.
C.Existing Structural Steel. Apply the specified primer coat after cleaning the surface as required by contract prior to the other field coats to all exposed edges of plates and rolled shapes; the heads of rivets, bolts, and nuts; and all surfaces where bare metal is exposed.
612.03.7 Inspection Equipment, Quality Assurance and Lighting.
Inspection Equipment. Have available the minimum following equipment for the QC/QA observations of the cleaning and painting operations. Maintain, calibrate, and verify the equipment in a condition that is satisfactory to the Project Manager.
1.The latest editions of SSPC-Vis 1 (Abrasive Blasting), SSPC-Vis 3 (Hand & Power Tool), or SSPC-Vis 4 (Water Jetting), as applicable to the project, or other approved visual standards.
2.SSPC Manual Volumes 1 and 2 (Latest Editions).
3.Spring Micrometer with Coarse and Extra Coarse Surface Profile Replica Tape.
4.Electric Psychrometer and one Sling Psychrometer, °F.
8.High/Low (Recordable) Thermometer for Paint Storage Area.
9.Wet Film Thickness Gauge.
10.Digital Magnetic Dry Film Coating Thickness Gauge capable of transferring data to a computer (SSPC-PA 2, Type 2).
11.Plastic Calibration Shims for Digital Magnetic Dry Film Thickness Gauge.
12.Inspector’s Mirror.
13.Wind Meter.
14.Clean, White, Lint-Free, Absorbent Rags.
15.Light Meter for measuring light intensity during surface preparation, painting, and inspection work.
16.Dull Putty Knife as defined by SSPC-SP 2 and/or SP 3 under 2. Definitions, 2.3 Dull Putty Knife.
17.Blotter Paper.
18.Dry Film Thickness calibration plates traceable to the National Institute of Standards and Technology.
19.Measuring tape and stick/pole to measure platform under clearance. The stick/pole must be collapsible and have a minimum measuring height for the required clearance established by MDT.
20.Provide lighting, including power sources, to supply adequate illumination to all surfaces being prepared, painted, or inspected, including the underside and inside of the containment system, when containment is employed. Meet SSPC-Technology Guide No. 12 for lighting. Adjust the floodlighting to avoid glare to marine and vehicular traffic.
612.03.8 Quality Control (QC) Plan, Inspection Procedures, and Recording Systems
QC Inspectors. A Contractor provided QC inspector must be on site full time during cleaning and painting operations. Provide documentation that personnel performing quality control related functions are experienced and qualified to perform the work and have completed AMPP CIP level 1 certification or equal. Submit a Quality Control Plan for providing daily job quality control per SSPC-QP1 for surface preparation and painting operations. Inc the following in the Quality Control Plan:
1.Records of standards and specifications for coating inspection work and their utilization.
2.System for filing inspection reports.
3.Demonstration that inspection equipment and calibration standards and procedures for calibrating the inspection equipment are available.
4.Procedures to stop nonconforming work.
5.Procedures for verifying proper coating application.
6.Procedures to ensure that each major operation is inspected, and the inspection results documented. Contractor QC inspections must include:
a.Effectiveness of protective coverings to control project debris, paint spatters, overspray, drips, paint spills, etc., while painting over roadways, waterways, machinery areas, and areas in the vicinity of abutments and private properties.
b.Ambient conditions.
c.Compressed air cleanliness and, if required, acceptability for breathing. 612 – STRUCTURE FINISHES 2020 EDITION V5.1 612-10
e.Coating application (specified materials, mixing, thinning, and wet film thickness).
f.Dry film thickness per coat.
g.Recoat times and cleanliness between coats.
h.Coating continuity and coverage (free from runs, sags, overspray, dry spray, pinholes, shadow-through, skips, etc.). Maintain copies of the Contractor’s daily job quality control records on the project and available when requested. Submit records from on-site audits and inspections from SSPC, OSHA and EPA as requested by the Project Manager.
612.03.9 Minimum Contracting Requirements for Field Painting
1.Certified as a SSPC-QP1. Standard Procedure for Evaluating Qualifications of Painting Contractors: Field Application to Complex Structures is required for workers removing or applying paint.
2.Certified as a SSPC-QP2, Category A. Standard Procedure for Evaluating Qualifications of Painting Contractors to Remove Hazardous Paint is required for workers removing by abrasive blasting cleaning. All certificates are to be effective prior to Award of Contract and remain in effect for the duration of the Contract.
612.04 Method of Measurement
Structure finish is not measured separately but is incidental to the items being finished.
612.05 Basis of Payment
Structure finish is not paid for separately but is included in the cost of the item finished and includes all materials and resources necessary to complete the work.