Division 600 — Miscellaneous Construction

619Signs and Delineators

MT · 2020 (v5.1) Standard Specifications✓ Full text on BuildSpecBook pages 487–492 Save this section

Ask about Section 619

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

619.01 Description

This work is furnishing, fabricating, erecting, removing, and resetting signs and delineators.

619.02 Materials

Furnish materials in accordance with the Detailed Drawings and the following subsection requirements: Delineators .............................................................. Detailed Drawings Delineator Panel...................................................... Detailed Drawings Flexible Delineators ................................................. 704.03 Signing Material ...................................................... 704.01

619.03 Construction Requirements

619.03.1 Definitions

The following definitions apply to the signing work in the contract.

A.New. Signs designated “New” are to be furnished new and erected on new supports at the specified locations.
B.Reuse Sign Face. Signs designated “Reuse Sign Face” are to be removed from the existing supports and remounted on new supports at the specified locations.
C.Replace. Signs designated “Replace” are to be removed and replaced with the specified new signs, including new supports, at the existing or specified new locations.
D.Replace Sign Face. Signs designated “Replace Sign Face” are to be removed from the supports and replaced with the specified new signs using the existing supports at the same mounting height as the replaced sign, unless otherwise indicated in the plans.
E.Use As Is. Signs designated “Use As Is” are to be left in place.
F.Reset. Signs designated “Reset” are to be removed and reset at the specified locations using the existing sign faces and supports.
G.Remove. Signs designated “Remove” are to be removed, including the sign or sign assembly and sign supports.
H.Type-1 Delineator. Delineators designated as Type-1 will be Design A, B, D, F, G, H, J, GJ, and BJ.
I.Type-2 Delineator. Delineators designated as Type-2 will be Design C. Furnish new materials for signing work in accordance with Table 619-1. 619 – SIGNS AND DELINEATORS 2020 EDITION V5.1 619-2 TABLE 619-1 MATERIALS REQUIRED FOR SIGN WORK Alum. Sheeting/ Sign Face Support (Post) Breakaway Foundation New X X X X Reuse Sign Face X X X Replace X X X X Replace Sign Face X Use As-is Reset X X Remove Note. The materials mentioned above are based on planned operations. Meet the requirements of the contract. If no pay item exists for necessary materials, absorb the costs of these items in other signing components.

619.03.2 Design Calculations and Shop Drawings

The Department will furnish the sign design calculations for the project at the pre- construction conference. The sign design calculations will only be provided for signs not listed within the MUTCD-Standard Highway Signs . Submit Contractor approved (stamped) shop drawings and welding procedures for sign bridges, and overhead cantilever sign structures. After the structural steel shop drawings and welding procedures have been reviewed and checked by the Department, all required corrections will be returned to the Contractor who must make the corrections and re-submit the corrected drawings and welding procedures for final review and approval within 15 business days. All final drawings must be stamped “Approved” by the Department before fabrication begins. Submit shop drawings and welding procedures at one time in a complete package for the Department’s initial and subsequent reviews. Individual parts of the submittals will not be accepted for review.

619.03.3 Fabrication and Erection

Install bolted connections in accordance with Subsections 556.03.8 and 703.04.5 . Fabricate the signs and sign legends before delivery to the project, except for signs too large to transport in one piece to the project. Fabricate all signs using the hole spacing specified in the FHWA Standard Highway Signs book or the Detailed Drawings. The lengths of poles and steel posts shown in the contract are estimated lengths. The Project Manager will furnish the required length of each pole and steel post prior to fabrication. Locate and erect signs as specified or directed. The Project Manager may change sign locations due to field conditions. Erect signs so the sign face is vertical and aligned as specified. Sign supports must not project above the sign faces. When necessary, use full width piano hinges for all folding signs. Ensure that hinges are capable of withstanding normal dead and live loads applied and be securely fastened by bolting or riveting to the sign. The hinge must meet the requirements of Subsection 704.01.9 . 2020 EDITION V5.1 SIGNS AND DELINEATORS – 619 619-3 After the sign is installed and adjustments are made, jam the threads of the mounting bolts, or use vandal resistant nuts for ground-mounted sign faces 25 square feet (2.3 m2) and smaller. The specified foundation depth for timber posts and poles is a minimum depth. Field cut the poles to the correct length or bury the extra length to provide the specified mounting. Backfill foundation holes for timber posts and poles as follows: • Combine and thoroughly mix the material excavated from the foundation with cement using a mix ratio of 10 parts excavated material to 1 part cement. • Do not mix in the hole. Add water to make the soil-cement mixture. • Place the sign post or pole in the hole without the sign attached. • Backfill the hole with the soil-cement mixture in 8-inch (200 mm) maximum lifts. • Compact each lift by hand tamping or using mechanical methods. • Allow the foundation to cure for 7 days before mounting the sign face to the support. Foundation holes for wooden sign supports may be backfilled with CLSM using the specifications for constructing foundations for steel sign posts as follows. Construct foundations for steel sign posts with Class General concrete in accordance with Section 551. Finish foundations flush with the adjacent surfaces. Signs may be post mounted after the concrete has set 72 hours. Weld metal joints and post breaks in accordance with Sections 556 and 624.

619.03.4 Inspection

The completed signs will be inspected on the project before they are installed. Defects including but not limited to cracks, tears, splits, crazing, gouges or curled edges of the background sheeting or legend are cause for rejecting the sign. The installed signs will be inspected at night for nighttime retro-reflectivity and readability. Adjust signs exhibiting specular reflection, as directed.

619.03.5 Sheet Aluminum Overlay

Meet the contract requirements for sheet aluminum overlays. Install the sign legend and other components plumb and level. Match the color, shade, and type of existing reflective sheeting used as a background for partial overlays. Fully cover the existing legend and symbols with partial overlay backgrounds. Match the size of the existing sign with complete overlay backgrounds.

619.03.6 Replace, Reuse Sign Face, and Reset

Use new materials in accordance with Section 704 for that required over and above those materials salvaged from signs to be reset or reused. Install breakaway devices on existing posts when specified. Reset signs in accordance with Subsection 619.03.3. Repair or replace all Contractor sign damage resulting from dismantling, moving, and resetting at Contractor expense. With no exception, remount or reset within one hour all removed warning, regulatory signs, and route markers. Re-install guide signs within 5 hours and only during daylight hours. Re- display warning, regulatory, and guide signs by dusk. Erect the new sign and support before removing the existing sign being replaced. Do not display conflicting signs together. Do not obscure existing signs when placing new signs. Re-erect existing multiple support signs to be removed and reset using the original post spacing. 619 – SIGNS AND DELINEATORS 2020 EDITION V5.1 619-4

619.03.7 Installation Date Tags and Route Markers

Install date tags and route identification tags on all highway signs before final acceptance. Meet the contract requirements for design, color, and installation.

619.03.8 Delineators

Furnish and install new delineators at the locations specified and marked by the Project Manager. Remove delineators conflicting with new construction as specified. Furnish and install snow poles, if required, in accordance with the Detailed Drawings. Removed delineators are the Contractor’s property.

A.Delineator Panel. Affix delineation panels to U-channels at a minimum of 3 locations with attachment points within 3 inches (75 mm) of the top, middle and bottom of each panel. Affix panels so the top of the panel is within 1-inch (25 mm) of the top of the U- Channel.

619.03.9 Flexible Delineators

Install delineators as specified by the manufacturer’s recommendations and at the locations shown in the contract or as directed by the Project Manager.

619.03.10 Acceptance

Signs and traffic guide devices are accepted for payment individually once installed. The Department will assume maintenance responsibility for signs and other traffic guide devices once accepted and installed. Repair or replace signs and devices, at Contractor expense, that are damaged or destroyed by the Contractor’s operations.

619.03.11 Permanent Barricade

Furnish and install permanent barricades as specified and shown in the Detailed Drawings.

619.03.12 Breakaway System

Furnish breakaway devices listed on the QPL and in accordance with Subsection

704.01 4(D). Install in accordance with the manufacturer’s recommendations.

619.03.13 Remove Signs

Remove foundation material left after removing the existing signs to at least 1-foot (305 mm) below ground-line. Backfill and compact the holes left from removal using clean material or crushed base. Do not cut off and leave existing posts in place. Existing signs and supports specified for removal are the Contractor’s property. Dispose of removed sign materials in accordance with local, state, and federal regulations. Disassemble and store signs specified to remain the Department’s property at the designated location.

619.03.14 Linear Delineation Systems

A.Concrete Barrier Rail. Install 2 panels per section of concrete barrier rail. Equally space the panels on the barrier rail. Prepare the concrete barrier to ensure proper fastening prior to installation. Install linear delineation in accordance with the manufacturer installation procedures and requirements. Mount maximum distance of 2 inches (50 mm) from the top edge of the standard concrete median barrier. Mount the panels at the same height above the roadway on both standard and tall barrier rail.
B.W- Beam Guardrail. Prepare the metal guardrail to ensure proper fastening prior to installation and install delineation panels per manufacturers recommendations. Mount the panels on the inside middle groove on the W-Beam and install: 2020 EDITION V5.1 SIGNS AND DELINEATORS – 619 619-5
1.4 panels evenly spaced over every 25-foot piece of rail.
2.2 panels evenly spaced over every 12.5-foot piece of rail.
3.Do not mount panels on optional terminal sections.

619.04 Method of Measurement

619.04.1 Aluminum Signs

Aluminum sheet and aluminum sheet increment are measured by the square foot (m2) of sign face.

619.04.2 Metal Posts

Metal posts are measured by the pound (kg). The pay weight is calculated by multiplying the nominal weight per foot (m) by the installed length of each post as noted in the Detailed Drawings. When ap plicable, the weight of the anchor sleeve will be added to the post weight. If there is no breakaway system bid item, include with the post weight the weight of the base plates, fuse plate, and stub post or anchor sleeve including the embedment length.

619.04.3 Treated Timber Poles and Posts

Treated timber poles and posts are measured by the foot (m) in even 2-foot (610 mm) increments. When the measurement falls between increments, the measured length for payment is the next higher 2-foot (610 mm) increment.

619.04.4 Delineators

Delineators of each type specified are measured by the unit and include the reflector, mounting hardware, post, and snow pole, if applicable, complete in place. Removal of existing delineators is not measured for payment.

619.04.5 Flexible Delineators

Flexible delineators of each type specified are measured by the unit.

619.04.6 Reset Signs

The reset of guide, warning, regulatory, and route marker signs is measured by the unit for each sign removed and reset in a new location. Sign groups of 2 or more signs mounted on a single support or multiple supports are measured as a single sign. When signs designated as “Reset” require new supports to achieve the proper mounting height, include the costs of the supports in the cost of reset signs. When there is not a bid item in the contract for reset sign, this work is incidental to other items of the contract.

619.04.7 Remove Signs

The removal of guide, warning, regulatory, and route marker signs is measured by the unit for each sign removed including supports. Sign groups of 2 or more signs mounted on a single support or multiple supports are measured as a single sign.

619.04.8 Replace Signs

New materials for signs designated “Replace” are measured in accordance with Subsections

619.04 1, 619.04.2, and 619.04.3.

Removal of existing signs designated “Replace” are measured in accordance with Subsection 619.04.7. 619 – SIGNS AND DELINEATORS 2020 EDITION V5.1 619-6 New materials for signs designated “Replace Sign Face” are measured in accordance with Subsection 619.04.1.

619.04.9 Reuse Sign Face

New material for supports for signs designated “Reuse Sign Face” is measured in accordance with Subsections 619.04.2 and 619.04.3. Removal of existing signs designated “Reuse” is measured in accordance with Subsection

619.04 7.

619.04.10 Sheet Aluminum Overlay

Sheet aluminum for signs designated “Sheet Aluminum Overlay” is measured by the square foot (m2) of sign face complete in place.

619.04.11 Breakaway System

A.Square Tubular Steel Post. Breakaway systems are measured per each and include the breakaway device and all associated hardware required to attach the breakaway device.
B.Structural and Tubular Steel Posts. Breakaway systems are measured per each and include the breakaway device, fuse plate, and all associated hardware required to attach the breakaway device. Include the cost of the concrete anchors to attach the breakaway to the foundation in the cost of the breakaway.

619.04.12 Permanent Barricade

Permanent barricade, as shown in the Detailed Drawings , is measured by the foot (m) of the barricade width and includes all materials for the barricade.

619.04.13 Linear Delineation Systems

Linear delineation is measured per each panel installed and accepted.

619.05 Basis of Payment

Payment for the completed and accepted work is made under the following: Pay Item Pay Unit Aluminum Signs Square Foot (m2) Breakaway System Each Delineation – Linear Barrier Each Delineation – Linear W-Beam Each Delineator (Type) Each Metal Sign Post Pound (kg) Permanent Barricade Foot (m) Remove Signs Each Reset Signs Each Sheet Aluminum Overlay Square Foot (m2) Timber Sign Post Foot (m)

Signs and Delineators in other states

Get an email when 619 changes

Montana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Road and Bridge Construction, 2020 (v5.1) Edition. Pages 487–492 of 611. View official source ↗