B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Division 11 — Erosion & Environment

1105TEMPORARY TRAFFIC CONTROL DEVICES

NC · 2024 Standard SpecificationsBook pages 663663View official source ↗

Department’s Work Zone Education Verification App (WZ -EVA) prior to the qualified work zone installer or flagger performing any traffic control duties on the project. For more information about WZ -EVA, see the Work Zone Safety Training webpage. 1101 -15 VEHICULAR ACCESS Maintain continuous and safe vehicular access, including but not limited to, all residences, businesses, schools, police and fire stations, hydrants, other emergency services, hospitals and mailboxes. Conduct operations so as to limit the inconvenience to property owners. 1101 -16 PEDESTRIAN ACCESS Maintain pedestrian access at all times as shown in the TMP . When existing continuous pedestrian facilities are disrupted, closed or relocated, provide temporary facilities that are detectable and include accessibility features consistent with the features present in the existing pedestrian facility. Temporary pedestrian facilities constructed for maintaining pedestrian access during construction shall be made of concrete, asphalt or other suitable material as approved by the Engineer. If establishing or maintaining a temporary pedestrian facility is not feasible, alternate methods for providing pedestrian accommodations may be used, such as a pedestrian transport service or a dedicated traffic con trol employee to assist and direct pedestrians around the work area for short duration disruptions. The work zone supervisor is responsible for the implementation of the TMP, and installation and maintenance of the ADA compliant pedestrian traffic control devices. The work zone shall be inspected weekly or as directed by the Engineer . Do not have any abrupt changes in grade or terrain that could cause a tripping hazard or could be a barrier to wheelchair use. Provide ADA compliant channelizing devices that are detectable to pedestrians who have visual disabilities. Do not sever or move pedestrian facilities for non -construction activities such as parking for vehicles and equipment. Separate pedestrian movements from both work zone activity and vehicula r traffic. TEMPORARY T RAFFIC CONTROL DEVICES -1 DESCRIPTION Furnish, install, maintain, relocate and remove temporary traffic control devices . All temporary traffic control devices furnished by the Contractor shall remain the property of the Contractor, unless otherwise specified in the contract. -2 MATERIALS Refer to Division 10. Prov ide temporary traffic control devices that are listed on the NCDOT Approved Product List. -3 CONSTRUCTION METHODS Ensure all temporary traffic control devices are inspected and approved before using them on the project. Install temporary traffic control devices before construction operations begin and during the proper phase of construction. Maintain and relocate temporary traffic control devices during the time they are in use. Keep these devices in place as long as they are needed and immediately remove thereafter. When operations are performed in stages, install only those devices that apply to the present conditions.

Source: North Carolina Standard Specifications for Roads and Structures, 2024 Edition. Pages 663663 of 857.