16-2 1605 -5 Measurement and Payment
Temporary Silt Fence will be measured and paid in linear fe et, accepted in place, along the ground line of the fence. Temporary Silt Fence that requires removal and replacement due to general deterioration or ineffective geotextile will be paid at contract unit prices. Repairs to the fence due to carelessness or neglect on the part of the Contractor will be at no cost to the Department. Silt Excavation will be measured and paid in accordance with Article 1630- 3. Seeding and Mulching will be measured and paid in accordance with Article 1660- 8.
Article 104 — 5, pertaining to revised contract prices , will not apply to Temporary Silt Fence .
No revision in the contract unit price will be allowed because of any overrun or underrun. Payment will be made under: Pay Item Pay Unit Temporary Silt Fence Linear Foot 1606 -1 DESCRIPTION Furnish materials, construct, maintain and remove special sediment control fence. Place special sediment control fence as sho wn in the plan s or as directed by the Engineer . 1606 -2 MATERIALS Refer to Division 10. Item Section Sediment Control Stone, Standard Size No. 5 or 57 1005