1606SPECIAL SEDIMENT CONTROL FENCE

NC · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 752–752 Save this section

Ask about Section 1606

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

16-2 1605 -5 Measurement and Payment

Temporary Silt Fence will be measured and paid in linear fe et, accepted in place, along the ground line of the fence. Temporary Silt Fence that requires removal and replacement due to general deterioration or ineffective geotextile will be paid at contract unit prices. Repairs to the fence due to carelessness or neglect on the part of the Contractor will be at no cost to the Department. Silt Excavation will be measured and paid in accordance with Article 1630- 3. Seeding and Mulching will be measured and paid in accordance with Article 1660- 8.

Article 104 — 5, pertaining to revised contract prices , will not apply to Temporary Silt Fence .

No revision in the contract unit price will be allowed because of any overrun or underrun. Payment will be made under: Pay Item Pay Unit Temporary Silt Fence Linear Foot 1606 -1 DESCRIPTION Furnish materials, construct, maintain and remove special sediment control fence. Place special sediment control fence as sho wn in the plan s or as directed by the Engineer . 1606 -2 MATERIALS Refer to Division 10. Item Section Sediment Control Stone, Standard Size No. 5 or 57 1005

A.Posts Provide s teel posts in accordance with Subarticle 1605- 2(A).
B.1/4" Hardware Cloth Provide hardware cloth with 1/4 inch openings constructed from 24 gauge wire.
C.Attachment Device Provide plastic ties, wire fasteners or other approved attachment device. 1606 -3 CONSTRUCTION METHODS Install hardware cloth and sediment control stone in accordance with Roadway Standard Drawing s. Attach hardware cloth to post with acceptable methods. Maintain the special sediment control fence until the project is accepted by the Engineer or until the fence is removed . R emove and dispose of silt accumulations at the fence in accordance with Sect ion 1630 and as directed by the Engineer . 1606 -4 MEASUREMENT AND PAYMENT Silt Excavation will be measured and paid in accordance with Article 1630- 3. 1/4" Hardware Cloth will be measured and paid in accordance with Article 1632 -5. Sediment Control Stone will be measured and paid in accordance with Article 1610 -4.

Get an email when 1606 changes

North Carolina revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: North Carolina Standard Specifications for Roads and Structures, 2024 Edition. Pages 752–752 of 857. View official source ↗

Ask about this section

Scoped to North Carolina 2024 Standard Specifications for Roads and Structures, Section 1606 — SPECIAL SEDIMENT CONTROL FENCE. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.