1610STONE FOR EROSION CONTROL

NC · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 754–754 Save this section

Ask about Section 1610

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

1609 -4 MEASUREMENT AND PAYMENT Silt Excavation will be measured and paid for in accordance with Article 1630- 3. Geotextile for Soil Stabilization will be measured and paid for in accordance with Article 270- 4. Stabilization of the excavated material will be paid for as Temporary Seeding as provided in Such price and payment shall be considered full compensation for all work covered by this section including all materials, construction, maintenanc e and removal of the clean water diversions . STONE FOR EROSION CONTROL -1 DESCRIPTION Furnish, stockpile if directed by the Engineer , place and maintain an approved stone for construction of erosion control devices at ditches, diversions, swales, pipe inlets, pipe outlets, drainage turnouts and at other locations designated in the plans or as directed by the Engineer . The work includes , but is not limited to , furnishing, weighing, stockpiling, re -handling, placing and maintaining stone; and disposal of any stone not incorporated into the project when necessary. -2 MATERIALS Refer to Division 10. Item Section Sediment Control Stone 1005 Stone for Erosion Control 1042 Use the class or standard size of stone specified in the contract. -3 CONSTRUCTION METHODS Place stone, in locations and to the thickness, widths and lengths as shown in the plans or as directed by the Engineer . Construct erosion control devices in accordance with the plans neatly and uniformly with an even surface and meeting the plans. -4 MEASUREMENT AND PAYMENT Stone For Erosion Control, Class __ will be measured and paid in tons of each class of stone incorporated into the work, or has been delivered to and stockpiled on the project as directed by the Engineer . Stone placed in the stockpile will not be measured a second time. Measure stone by w eighing in trucks on certified platform scales or other certified weighing devices. Sediment Control Stone will be measured and paid in tons of stone incorporated into the work, or has been delivered to and stockpiled on the project as directed by the Engi neer. Stone placed in the stockpile will not be measured a second time. Measure stone by weighing in trucks on certified platform scales or other certified weighing devices. Payment will be made under: Pay Item Pay Unit Stone For Erosion Control, Class __ Ton Sediment Control Stone Ton

Get an email when 1610 changes

North Carolina revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: North Carolina Standard Specifications for Roads and Structures, 2024 Edition. Pages 754–754 of 857. View official source ↗

Ask about this section

Scoped to North Carolina 2024 Standard Specifications for Roads and Structures, Section 1610 — STONE FOR EROSION CONTROL. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.