16-15 1634 -3 Construction Methods
Install coir fiber baffles on the upstream side of each type of dam in accordance with Section 1640 and as directed by the Engineer .
Article 1610 — 4.
Sediment Control Stone will be measured and paid in accordance with Article 1610- 4. Silt Excavation will be measured and paid in accordance with Article 1630- 3. 1635 -1 DESCRIPTION Construct, maintain and remove devices placed around outside perimeters of pipe structures, to reduce water velocity and trap sediment. The conditions which occur during the construction of the project will determine the quantity of temporary rock pipe inlet sediment traps to be constructed. The quantity of inlet sediment traps may be increased, decreased or eliminated entirely as directed by the Engineer . Such variations in quantity will not be considered as alterations in the details of construction or a