16-16 change in the character of the work.
1635 -2 MATERIALS Refer to Division 10. Item Section Sediment Control Stone, Standard Size No. 5 or 57 1005 Stone for Erosion Control, Class A or Class B 1042 1635 -3 CONSTRUCTION METHODS
Article 1610 — 4.
Sediment Control Stone will be measured and paid in accordance with Article 1610- 4. Silt Excavation will be measured and paid in accordance with Article 1630- 3. 1636 -1 DESCRIPTION Construct and maintain culverted temporary stream crossings. Temporary stream crossings are not shown in the plan sheets and shall be determined as directed by the Engineer . The quantity of stream crossings to be installed will be affected by the actual c onditions that occur during the construction of the project. The quantity of stream crossings may be increased, decreased or eliminated entirely as directed by the Engineer . Such variations in quantity will not be considered as alterations in the details of construction or a change in the character of the work. 1636 -2 MATERIALS Refer to Division 10. Item Section Sediment Control Stone, Standard Size No. 5 or 57 1005 Stone for Erosion Control, Class B 1042 Geotextile for Drainage, Type 2 1056