16-16 change in the character of the work.
1635 -2 MATERIALS Refer to Division 10. Item Section Sediment Control Stone, Standard Size No. 5 or 57 1005 Stone for Erosion Control, Class A or Class B 1042 1635 -3 CONSTRUCTION METHODS
Article 1610 — 4.
Sediment Control Stone will be measured and paid in accordance with Article 1610- 4. Silt Excavation will be measured and paid in accordance with Article 1630- 3. 1636 -1 DESCRIPTION Construct and maintain culverted temporary stream crossings. Temporary stream crossings are not shown in the plan sheets and shall be determined as directed by the Engineer . The quantity of stream crossings to be installed will be affected by the actual c onditions that occur during the construction of the project. The quantity of stream crossings may be increased, decreased or eliminated entirely as directed by the Engineer . Such variations in quantity will not be considered as alterations in the details of construction or a change in the character of the work. 1636 -2 MATERIALS Refer to Division 10. Item Section Sediment Control Stone, Standard Size No. 5 or 57 1005 Stone for Erosion Control, Class B 1042 Geotextile for Drainage, Type 2 1056
Get an email when 1636 changes
North Carolina revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.