1620TEMPORARY SEEDING

NC · 2024 Standard SpecificationsBook pages 756756View official source ↗

Pay Item Pay Unit Temporary Mulching Acre TEMPORARY SEEDING -1 DESCRIPTION Seed and mulch selected areas in advance of the permanent seeding and mulching operations to minimize erosion of graded areas during construction operations. The work includes preparing seedbeds; furnishing, placing and covering fertilizer and seed; furnishing and placing mulch; and other operations necessary for seeding the required areas. Perform temporary seeding promptly at the locations and under any of the following conditions when directed by the Engineer :

(A)When it is impossible or impractical to bring an area to the final line, grade and finish so

that permanent seeding and mulching operations can be performed without subsequent serious disturbance by additional grading;

(B)When erosion occurs or is considered to be potentially substantial on areas of graded

roadbed where construction operations are temporarily suspended or where the grading of the road bed has been completed substantially in advance of the paving construction;

(C)During seasons of the year when permanent seeding and mulching is prohibited by the

contract;

(D)When an immediate cover would be desirable to minimize erosion, siltation or pollution

on any area. The actual conditions that occur during the construction of the project will determine the quantity of seed or fertilizer to be used. The quantity of seed or fertilizer may be increased, decreased or eliminated entirely as directed by the Engineer . Such variations in quantity will not be considered as alterations in the details of construction or a change in the character of the work. -2 MATERIALS Refer to Division 10. Item Section Fertilizer 1060 -2 Mulch for erosion control 1060 -5 Seed 1060 -4 See the contract for analysis of fertilizer and the kinds of seed. -3 CONSTRUCTION METHODS

(A)Seedbed Preparation

Scarify areas to be seeded to a depth of not less than 5 inches unless directed by the Engineer otherwise. The soil conditions and topography will determine the required depth of the seedbed. Prepare the surface to be seeded with adequate furrows, ridges, terraces, trenches or other irregularities in which seeding materials can lodge with reasonable assurance that the materials will not be easily displaced by wind, rain or surface runoff.

(B)Applying and Covering Fertilizer and Seed

The analysis of fertilizer, the kinds of seed and the rates of application of fertilizer and seed shall be as stated in the contract. Apply no fertilizer or seed when the Engineer determines that conditions are unfavorable

Source: North Carolina Standard Specifications for Roads and Structures, 2024 Edition. Pages 756756 of 857.