In-Depth Review 2022 Section 216 155 SECTION 216
216.01 Description
This work consists of using water for dust control and to obtain proper moisture content and compaction.
216.02 Equipment
Equipment Section Water Trucks 152.01 B
216.03 Materials
Reserved.
216.04 Construction Requirements
Apply water in sufficient quantity to secure and maintain proper moisture content or dust control.
216.05 Method of Measurement
The Engineer will measure water: - In calibrated tanks; - By weighing and converting to gallons at the rate of 8.33 pounds per gallon; or - By an approved metering device placed in the supply line. Before using a water metering device, furnish a certified statement that the device conforms to AWWA requirements. The statement must show that the device has been calibrated within the past year. Should subsequent measurements prove unreliable, furnish another certified device producing satisfactory measurements.
216.06 Basis of Payment
Pay Item Pay Unit Water M Gal An “M Gal” is equivalent to 1,000 gallons. Such payment is full compensation for furnishing all materials, equipment, labor, and incidentals to complete the work as specified . In-Depth Review 2022 Section 220 156 SECTION 220 STOCKPILE SITE
220.01 Description
This work consists of preparing or restoring a stockpile site for materials other than topsoil.
220.02 Equipment
Reserved.
220.03 Material
Use granular material with less than 30 percent passing the No. 200 sieve.
220.04 Construction Requirements
A.Prepare Stockpile Site. Strip all existing topsoil from stockpile area, up to a maximum of 1 foot. Shape and compact the site so water drains away from the stockpiled material. Place and compact 6 inches of granular material on the stockpile site.
B.Erosion Control.
1.General. Install erosion control items as specified in the appropriate section of the specifications.
2.Department Designated Stockpile Site. If the Department designates a stockpile site, include the erosion control measures in the SWPPP submitted to the Engineer as specified in Section 107.02 C, “Storm Water Permits” .
3.Contractor Obtained Stockpile Site. If using a Contractor obtained stockpile site, obtain the applicable permits as specified in Section 107.02, “Permits, Licenses, and Taxes” . These permits will be separate from the permits obtained for Department designated areas. Before work begins on the site, furnish the names of the legal owners and the names of other parties having a legal interest in the borrow areas. Submit a copy of the site agreement. After the site has been restored to satisfactory condition, obtain a release and receipt of paym ent from the legal owners, and furnish copies to the Engineer.
C.Restore Stockpile Site.
1.Department Designated Stockpile Site. Restore the stockpile site upon completion of the project. Dispose of the unused or waste material and granular material at locations acceptable to the Engineer.
Source: North Dakota Standard Specifications for Road and Bridge Construction, 2022 Edition. Pages 190–190 of 550.