383 SECTION 766
766.01 Description
This work consists of removing mailbox assemblies, furnishing and installing new support systems, and fastening the removed mailboxes or new mailboxes to the new support systems.
766.02 Equipment
Reserved.
766.03 Materials
Reserved.
766.04 Construction Requirements
A.General. The mailbox owner will furnish a postal service approved mailbox. Install the furnished mailbox on the new support system.
B.Temporary Relocation. If construction activities require the removal of the support system and delayed installation of the new support system, reset the existing support system at a location approved by the Engineer and postal service. If construction activities require the removal of the support system and delayed installation of the new support system, relocate mailboxes to a location approved by the Engineer and postal service. If existing mailboxes meet NCHRP 350 or MASH requirements, they may be reset temporarily during construction. If the existing support does not meet NCHRP 350 or MASH, place temporarily located mailboxes on supports that meet MASH requirements. If there is no support that meets MASH requirements, perform one of the following actions: − Place them outside the clear zone; − Place them on a 4 × 4 inch wood post; or − Reset them using assemblies shown in the plans. After construction has progressed to allow permanent installation, install the mailbox assemblies and mailboxes at the specified locations.
766.05 Method of Measurement
The Engineer will measure as specified in Section 109.01, “Measurement of Quantities” and as follows: The Engineer will measure mailbox assemblies on a single support system as one Each. 384 766.06 BASIS OF PAYMENT Pay Item Pay Unit Mailbox – All Types Each Such payment is full compensation for furnishing all materials, equipment, labor, and incidentals to complete the work as specified. Section 770 385 SECTION 770 HIGHWAY LIGHTING
770.01 Description
This work consists of furnishing and installing highway lighting.
770.02 Equipment
Reserved.
770.03 Materials
A.General. Item Section Concrete, Class AE -3 802 Rapid -Hardening Cementitious Materials 806.01 Galvanizing 854 Highway Lighting 895
B.Work Drawings. Submit work drawings a maximum of 50 days after the date of award of contract. With the work drawings, provide the dimensions, type of material, and the functional characteristics of the equipment to be installed. Submit work drawings for the following items:
1.Conductors;
2.Pull Box;
3.Feed Point Equipment including:
a.Circuit breakers (enclosed in a load center -type panel board);
b.Enclosed relay (normally open);
c.Cabinet; and
d.Photoelectric cell.
4.Light Standard including:
a.Luminaire;
b.Fuseholder; and
c.All necessary calculations and drawings used in the design of the light standard.
5.Sign Lighting Fixture including:
a.Loadcenter;
b.Luminaire; and
c.Ballast.
6.High Mast Lighting Assembly including: a. Pole;
b.Lowering Device;
c.Head Frame Assembly;
d.Luminaire Ring Assembly;
e.Winch and Hoisting Assembly including all cables;
f.Portable Power Unit;
Source: North Dakota Standard Specifications for Road and Bridge Construction, 2022 Edition. Pages 418–419 of 550.