383 SECTION 766
766.01 Description
This work consists of removing mailbox assemblies, furnishing and installing new support systems, and fastening the removed mailboxes or new mailboxes to the new support systems.
766.02 Equipment
Reserved.
766.03 Materials
Reserved.
766.04 Construction Requirements
766.05 Method of Measurement
The Engineer will measure as specified in Section 109.01, “Measurement of Quantities” and as follows: The Engineer will measure mailbox assemblies on a single support system as one Each. 384 766.06 BASIS OF PAYMENT Pay Item Pay Unit Mailbox – All Types Each Such payment is full compensation for furnishing all materials, equipment, labor, and incidentals to complete the work as specified. Section 770 385 SECTION 770 HIGHWAY LIGHTING
770.01 Description
This work consists of furnishing and installing highway lighting.
770.02 Equipment
Reserved.