General Provisions (00100-00999)

500BITUMINOUS PAVEMENT

NE · 2017 Standard SpecificationsBook pages 333336View official source ↗

- 299 - DIVISION 500 -- BITUMINOUS PAVEMENT 501 -- GENERAL REQU IREMENTS ......................................................... 303

501.01 General ................................................................................. 303

501.02 Equipment .............................................................................. 304

502 – ASPHALTIC CONCRETE PAVEMENT SMOOTHNESS ................ 306

502.01 General ................................................................................. 306

502.02 Equipment .............................................................................. 306

502.03 Certification and Independent Assurance Testing ............. 306

502.04 Profile Test Procedures ..................................................... 308

502.05 Evaluation ............................................................................ 310

502.06 Pavement Surface Correction ............................................ 311

502.07 Traffic Count ....................................................................... 312

502.08 Method of Measurement ...................................................... 312

502.09 Basis of Payment .................................................................. 312

503 -- ASPHALTIC CONCRETE .............................................................. 314

503.01 Description ........................................................................... 314

503.02 Material Requirements ........................................................ 314

503.03 Equipment .............................................................................. 314

503.04 Construction Methods ......................................................... 318

503.05 Method of Measurement ...................................................... 324

503.06 Basis of Payment .................................................................. 325

504 -- TACK CO AT ................................................................................... 327

504.01 Description ........................................................................... 327

504.02 Material Requirements ........................................................ 327

504.03 Construction Methods ......................................................... 327

504.04 Method of Measurement ...................................................... 328

504.05 Basis of Payment .................................................................. 328

505 -- ASPHALTIC CO NCRETE CURB ................................................... 330

505.01 Description ........................................................................... 330

505.02 Material Requirements ........................................................ 330

505.03 Construction Methods ......................................................... 330

505.04 Method of Measurement ...................................................... 330

505.05 Basis of Payment .................................................................. 330

506 -- ASPHALTIC CONCRETE ISLAND NOSES AND MEDIANS ........ 331

506.01 Description ........................................................................... 331

506.02 Material Requirements ........................................................ 331

506.03 Construction Methods ......................................................... 331

506.04 Method of Measurement ...................................................... 331

506.05 Basis of Payment .................................................................. 331

507 -- ASPHALTIC CONCRETE FOR STATE MAINTENANCE PATCHING .................................................................................................................. 332

507.01 Description ........................................................................... 332

507.02 Method of Measurement ...................................................... 332

507.03 Basis of Payment .................................................................. 332

508 -- JOINT SEALING - ASPH ALT TO CONCRE TE ............................. 333

508.01 Description ........................................................................... 333

508.02 Material Requirements ........................................................ 333

508.03 Construction Methods ......................................................... 336

508.04 Method of Measurement ...................................................... 337

508.05 Basis of Payment .................................................................. 337

509 -- BITUMINOUS SAND BASE CO URSE ........................................... 339

509.01 Description ........................................................................... 339

- 300 - 509.02 -- MATERIAL REQUIREMENTS ........................................................ 339

509.03 Equipment .............................................................................. 339

509.04 Construction Methods ......................................................... 340

509.05 Method of Measurement ...................................................... 345

509.06 Basis of Payment .................................................................. 346

510 -- COLD MI LLING .............................................................................. 347

510.01 Description ........................................................................... 347

510.02 Material Requirements ........................................................ 347

510.03 Equipment .............................................................................. 347

510.04 Construction Methods ......................................................... 348

510.05 Method of Measurement ...................................................... 349

510.06 Basis of Payment .................................................................. 350

511 – SALVAGING AND STOCKPILING BITUMINOUS MATERIAL ...... 352

511.01 Description ........................................................................... 352

511.02 Material Requirements ........................................................ 352

511.03 Equipment .............................................................................. 352

511.04 Construction Methods ......................................................... 352

511.05 Method of Measurement ...................................................... 352

511.06 Basis of Payment .................................................................. 352

512 -- BITUMINOUS S URFACE COURS E ............................................... 353

512.01 Description ........................................................................... 353

512.02 Material Requirements ........................................................ 353

512.03 Construction Methods ......................................................... 353

512.04 Method of Measurement ...................................................... 353

512.05 Basis of Payment .................................................................. 353

513 -- FOG SE AL ...................................................................................... 354

513.01 Description ........................................................................... 354

513.02 Material Requirements ........................................................ 354

513.03 Construction Methods ......................................................... 354

513.04 Method of Measurement ...................................................... 355

514 -- MICROSURF ACING ....................................................................... 357

514.01 Description ........................................................................... 357

514.02 Material Requirements ........................................................ 357

514.03 Equipment .............................................................................. 358

514.04 Calibration Methods ............................................................ 359

514.05 Construction Methods ......................................................... 361

514.06 Method of Measurement ...................................................... 363

514.07 Basis of Payment .................................................................. 364

515 -- ARMOR COAT OR CHIP SEAL ..................................................... 366

515.01 Description ........................................................................... 366

515.02 Material Requirements ........................................................ 366

515.03 Construction Methods ......................................................... 367

515.04 Method of Measurement ...................................................... 369

515.05 Basis of Payment .................................................................. 369

516 -- BITUMINOUS PAVEM ENT PATCHING ......................................... 372

516.01 Description ........................................................................... 372

516.02 Material Requirements ........................................................ 372

516.03 Equipment .............................................................................. 372

516.04 Construction Methods ......................................................... 372

516.05 Method of Measurement ...................................................... 373

516.06 Basis of Payment .................................................................. 374

517 -- PRIME CO AT ................................................................................. 375

517.01 Description ........................................................................... 375

- 301 - 517.02 -- MATERIAL REQUIREMENTS ........................................................ 375

517.03 Construction Methods ......................................................... 375

517.04 Method of Measurement ...................................................... 375

517.05 Basis of Payment .................................................................. 375

518 -- FABRIC REIN FORCEMENT .......................................................... 377

518.01 Description ........................................................................... 377

518.02 Material Requirements ........................................................ 377

518.03 Construction Methods ......................................................... 377

518.04 Method of Measurement ...................................................... 377

518.05 Basis of Payment .................................................................. 379

519 -- CRACK SEALING BITUMI NOUS SURFAC ING ............................ 379

519.01 Description ........................................................................... 379

519.02 Material Requirements ........................................................ 379

519.03 Construction Methods ......................................................... 384

519.04 Method of Measurement ...................................................... 384

519.05 Basis of Payment .................................................................. 385

520 -- BITUMINOUS PATCHING OF CONCRETE PA VEMENT .............. 387

520.01 Description ........................................................................... 387

520.02 Material Requirements ........................................................ 387

520.03 Construction Methods ......................................................... 388

520.04 Method of Measurement ...................................................... 389

520.05 Basis of Payment .................................................................. 390

- 302 - - 303 - SECTION 501 -- GENERAL REQUIREMENTS

501.01 General

1.This Section describes materi als, procedures and equipment that are common to items of work described in Division 500. The requirements in Section 501 are applicable to all work, unless otherwise indicated.
2.Materials:
a.Asphaltic Materials include:
1.Performance Graded Binder (PG Binder) (2) Emulsion (3) Cutbacks (4) Other liquid asphalt based materials b. Asphaltic Surfacing Materials include: (1) Coats (i.e.: Tack Coats, Armor Coats, etc.)
2.Seals (i.e.: Fog Seal, Scrub Seal, Chip Seal, etc.)
3.Layers using Asphaltic materials (i.e.: Asphaltic Concrete, etc.)
c.All asphalt materials which are outside the specified property ranges shall be paid for at the contract unit price multiplied by the product of the pay factors determined by the pay factor tables in their respective Sections.
3.Bituminous Surfacing includes t he application of coats, seals or layers that utilize Asphaltic Mate rials, excluding bituminous foundation course. Bituminous surfacing work shall be performed in accordance with the contract.
4.Before placing the bituminous su rfacing, the Contractor shall clean the surface to be treated with mechanical brooms or hand tools as necessary to remove all vegetation, loose surface materials, dirt, mud, old crack sealant, unstable bituminous or other deleterious materials. Any surfacing materials not securely bonded to the surface shall be removed. Material cleaned from the surface shall be swept to the sides or windrowed as required and removed from the projec t by the Contractor at no additional cost.
5.Stockpiles and plant sites shall be maintained according to the Contractor’s Storm Water Poll ution Prevention Plan (SWPPP).
6.The Contractor shall prot ect all structures and roadway appurtenances like signs, guardrails, and curbs. If any items are damaged by the Contractor or because of the C ontractor's negligence, then they shall be repaired or replaced in kind at no additional cost to the Department.
7.Bituminous surfacing operations shall not be allowed between sunset and sunrise without permission of the Engineer or unless otherwise specified in the contract.
8.The Contractor shall apply asphaltic materials within the temperature ranges specified in the cont ract, or within written manufacturer recommended temperatures so that uniform mixing and spreading is attained.
Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 333336 of 1,048.