SECTION 606 – SIDEWALKS, DRIVEWAYS, AND ISLANDS
606.01 Description
This Section describes the requirements for constructing HMA sidewalks, driveways, and islands, and concrete sidewalks, driveways, and islands.
606.02 Materials
606.02.01 Materials
Provide materials as specified: Dense-Graded Aggregate ................................ ................................ ................................ .............................. 901.10 Hot Mix Asphalt (9.5M64) ................................ ................................ ................................ ............................ 902.02 Concrete ................................ ................................ ................................ ................................ ....................... 903.03 Curing Materials ................................ ................................ ................................ ................................ ........... 903.10 Reinforcement Steel ................................ ................................ ................................ ................................ ...... 905.01 Welded Wire Reinforcement ................................ ................................ ................................ .................... 905.01.03 Preformed Joint Filler ................................ ................................ ................................ ................................ ... 914.01 Hot-Poured Joint Sealer, Type 2 ................................ ................................ ................................ .................... 914.02 Sleeves ................................ ................................ ................................ ................................ ......................... 919.10 Detectable Warning Surface ................................ ................................ ................................ .......................... 919.14 For driveways, the Contractor may use Class E concrete, as specified in 903.04, in order to open the driveway to traffic in 3 days.
606.02.02 Equipment
Provide equipment as specified: HMA Compactor ................................ ................................ ................................ ................................ ........ 1003.05 Vibratory Drum Compactor ................................ ................................ ................................ ......................... 1003.06 Bituminous Material Distributor ................................ ................................ ................................ .................. 1003.07 Sealer Application System ................................ ................................ ................................ ........................... 1003.08 Vibrator ................................ ................................ ................................ ................................ ...................... 1005.04 Straightedge ................................ ................................ ................................ ................................ ................ 1008.02 Pavement Saw ................................ ................................ ................................ ................................ ............. 1008.04 Hot-Air Lance ................................ ................................ ................................ ................................ ............. 1008.06 HMA Plant................................ ................................ ................................ ................................ .................. 1009.01 HMA Trucks ................................ ................................ ................................ ................................ ............... 1009.02 Concrete Batching Plant ................................ ................................ ................................ .............................. 1010.01 Concrete Trucks ................................ ................................ ................................ ................................ .......... 1010.02
606.03 Construction
606.03.01 HMA Sidewalks, Driveways, and Islands
Excavate as specified in 202.03.03. Obtain RE approval before finishing excavation. If the RE determines that the bottom of the excavation is unstable, undercut, backfill, and compact as directed by the RE. Place sleeves for signs and delineator posts at locations shown on the Plans. Ensure that sleeves are flush with the finished surface. Fill the sleeves with sand. Immediately before HMA placement, seal the top 1/2 inch with hot-poured joint sealer. Reseal the sleeves when sign or delineator posts are installed. For sidewalks and islands, construct the base course using DGA as specified in 302.03.01. Construct the HMA course as specified in 401.03.03. Compact using at least 1/2 ton rollers. For driveways, if directed by the RE, construct a base course using DGA as specified in 302.03.01 to the thickness directed by the RE. Construct the HMA course as specified in 401.03.03. Compact using at least 1/2 ton rollers.
606.03.02 Concrete Sidewalks, Driveways, and Islands
606.03.03 Detectable Warning Surfaces
Clean and dry the designated area where the detectable warning surface will be installed. Install detectable warning surfaces according to the manufacturer’s recommendations. If the detectable warning surface is not integrally colored, app ly the detectable warning surface coating according to the manufacturer’s recommendation. Evenly broadcast 60 grit over the final wet coat at a rate of 0.07 pounds per square yard for skid resistance.
606.04 Measurement and Payment
The Department will measure and make payment for Items as follows: Item Pay Unit HOT MIX ASPHALT SIDEWALK, ___" THICK SQUARE YARD CONCRETE SIDEWALK, ___" THICK SQUARE YARD CONCRETE SIDEWALK, REINFORCED, ___" THICK SQUARE YARD HOT MIX ASPHALT DRIVEWAY, ___" THICK SQUARE YARD HOT MIX ASPHALT DRIVEWAY, VARIABLE THICKNESS SQUARE YARD CONCRETE DRIVEWAY, ___" THICK SQUARE YARD CONCRETE DRIVEWAY, REINFORCED, ___" THICK SQUARE YARD HOT MIX ASPHALT ISLAND, ___" THICK SQUARE YARD CONCRETE ISLAND, ___" THICK SQUARE YARD DETECTABLE WARNING SURFACE SQUARE YARD When the RE directs undercutting of unstable material in the excavation area, the Department will make payment, as specified in 104.03.03, for the additional excavation. The Department will also make payment, as specified in 104.03.03, for the additional bedding if there is not an excess of excavation available.