SECTION 605 – FENCE
605.01 Description
This Section describes the requirements for constructing fence and gates, removing and resetting fence, and repairing chain-link fence, including replacing damaged fabric.
605.02 Materials
605.02.01 Materials
Provide materials as specified: Concrete ................................ ................................ ................................ ................................ ...................... 903.03 Mortar................................ ................................ ................................ ................................ ...................... 903.08.01 Chain-Link Fence ................................ ................................ ................................ ................................ ..... 913.02.01
605.02.02 Equipment
Provide equipment as specified: Vibrator ................................ ................................ ................................ ................................ ...................... 1005.04 Concrete Batching Plant ................................ ................................ ................................ .............................. 1010.01 Concrete Trucks ................................ ................................ ................................ ................................ .......... 1010.02
605.03 Construction
605.03.01 Chain-Link Fence
Before constructing or placing fence, clear the site as specified in 201.03.01. Remove rock protruding above the ground surface in the fence line. Where aluminum-coated fence or PVC-coated fence is not designated, the Contractor may use either kind. Set terminal posts at the beginning and end of each continuous length of fence, at abrupt changes in vertical and horizontal alignment, and on each side of gate locations. Install posts to be set in concrete in dug or drilled holes. Place concrete as specified in 504.03.02.D and allow concrete to cure for at least 72 hours before stretching fence fabric. If a concrete foundation is not required, the Contractor may drive posts to the required depth if ground conditions permit. When solid rock is encountered, install posts not required to be set in concrete by drilling the rock to the required depth and securing with mortar.
605.03.02 Gates
Install gates necessary for construction operations at selected locatio ns. Set gates according to the manufacturer’s recommendations. Provide gates equipped with locks and 2 sets of keys. Provide the keys to the RE. Keep gates padlocked, except when in use during working hours.
605.03.03 Repairing Chain-Link Fence
Provide and erect new fabric where required. Provide new fence fabric of the same type as existing fence. If the same fence fabric cannot be provided, obtain RE approval of equivalent. Straighten top rails and posts, or replace as necessary, as determined by the RE. Replace all tension wire and mend all vertical cuts. Follow the construction requirements for new fence as specified in 605.03.01. Dispose of unusable materials as specified in 201.03.01.H.
605.03.04 Temporary Chain-Link Fence
Before beginning construction operations, erect temporary chain -link fence required to enclose construc tion areas. Construct temporary fence as specified in 605.03.01. The Contractor may reuse material as approved by the RE.