SECTION 904 – PRECAST AND PRESTRESSED CONCRETE
904.01 Non-Structural Precast Concrete
904.01.01 Component Materials
Provide materials as specified: Concrete ................................ ................................ ................................ ................................ ...................... 903.03 Self-Consolidating Concrete (SCC) ................................ ................................ ................................ .......... 903.06.02 Mortar................................ ................................ ................................ ................................ ...................... 903.08.01 Curing Materials ................................ ................................ ................................ ................................ .......... 903.10 Reinforcement Steel ................................ ................................ ................................ ................................ .... 905.01 Welded steel wire fabric used for reinforcement need not be galvanized. For Precast Concrete, the minimum cement content specified in Table 903.03.06-3 is not required for Class A or Class B concrete.
904.01.02 Fabrication
Fabricate precast concrete at a plant as specified in 1011.01 and listed on the QPL.
904.01.03 Curing
Cure according to the PCI MNL-116, except for steam curing. Do not strip forms until the piece has attained a stripping strength of 2,000 pounds per square inch. If steam curing, delay the application of steam within the enclosure for 4 hours or until the concrete has attained an initial set as determined according to ASTM C 403. Maintain an ambient temperature between 50 °F and 90 °F during the delay. Ensure that the maximum rate of temperature increase in the enclosure is 40 °F per hour. Monitor the temperature in the enclosure using recording thermometers placed at a minimum of 2 locations. Ensure that the enclosure temperature is maintained between 90 °F and 150 °F until 2 concrete test cylinders, field cured according to AASHTO T 23, have attained the stripping strength.
904.01.04 Removing Forms and Finishing
Ensure that items remain in forms for the duration of the curing operation. Remove forms when concrete has attained the stripping strength. If handling devices are used, remove and fill the holes with concrete or mortar. Provide a Class 1 finish as specified in 504.03.02.H.1. Complete surface finishing operations before placing the piece in storage.
904.01.05 Shipping and Handling
Store, stack, and transport the pieces using methods that do not cause the development of cracks or other damage. Do not ship pieces until the class design strength as specified in Table 903.03.06-3 has been attained.
904.01.06 Quality Control and Acceptance Requirements
Notify the ME, in writing, at least 21 days before start of production. For quality control, keep applicable records according to PCI Division 1, Quality Control, or NPCA requirements, and supply copies of these records to the ME as requested. Ensure that the quality control technician performing all tests is certified as an ACI Field Testing Technician, Grade 1. Submit Quality Control Plan to ME for review and approval. Follow the Department approved Buy America Compliance Plan. Provide documentation of compliance when requested by the ME. Submit certification of compliance as specified in 106.07. If the concrete piece is spalled, honeycombed, chipped, or otherwise defective, the ME or RE will reject the piece.
904.02 Precast Concrete Retaining Walls
904.02.01 Component Materials
Provide materials as specified: Concrete ................................ ................................ ................................ ................................ ...................... 903.03 Self-Consolidating Concrete (SCC) ................................ ................................ ................................ .......... 903.06.02 Mortar ................................ ................................ ................................ ................................ ..................... 903.08.01 Curing Materials ................................ ................................ ................................ ................................ ........... 903.10 Reinforcement Steel ................................ ................................ ................................ ................................ ..... 905.01 Welded steel wire fabric used for reinforcement need not be galvanized. For Precast Concrete, the minimum cement content specified in Table 903.03.06-3 is not required for Class A or Class B concrete.
904.02.02 Fabrication
Use a system listed on the QPL to fabricate prefabricated modular walls or mechanically stabilized earth walls. Fabricate precast concrete at a plant as specified in 1011.01 and listed on the QPL.
904.02.03 Curing
Cure as specified in 904.01.03, except that the required stripping strength is 3,000 pounds per square inch.
904.02.04 Form Removal and Finishing
Remove forms and finish concrete as specified in 904.01.04.
904.02.05 Shipping and Handling
Handle and ship as specified in 904.01.05.
904.02.06 Quality Control and Acceptance Requirements
Notify the ME in writing at least 21 days before start of production. For quality control, keep applicable records according to PCI Division 1, Quality Control, or NPCA requirements, and supply copies of these records to the ME as requested. Ensure that the quality control technician performing all tests is certified as an ACI Field Testing Technician, Grade 1. Submit Quality Control Plan to ME for review and approval. Follow the Department approved Buy America Compliance Plan. Provide documentation of compliance when requested by the ME. During production, the ME will inspect the quality of materials and the process of manufacture. The ME will accept the concrete as specified in 903.03.05 and will inspect the finished pieces before shipping for dimensional tolerances and damage. The ME will reject units for any of the following:
904.03 Structural Precast Concrete
904.03.01 Component Materials
Provide materials as specified: Concrete ................................ ................................ ................................ ................................ ....................... 903.03 Self-Consolidating Concrete (SCC) ................................ ................................ ................................ .......... 903.06.02 Mortar ................................ ................................ ................................ ................................ ..................... 903.08.01 Curing Materials ................................ ................................ ................................ ................................ ........... 903.10 Reinforcement Steel ................................ ................................ ................................ ................................ ...... 905.01 Bolts and Bolting Materials ................................ ................................ ................................ ........................... 908.01 Epoxy Waterproofing ................................ ................................ ................................ ............................... 912.02.02 For Precast Concrete, the minimum cement content specified in Table 903.03.06-3 is not required for Class A or Class B concrete.
904.03.02 Fabrication
Fabricate precast concrete at a plant as specified in 1011.01 and listed on the QPL. Provide an office for the ME as specified in 1011.03.
904.03.03 Curing
Cure as specified in 904.01.03, except that the required stripping strength is 4,000 pounds per square inch.
904.03.04 Removing Forms and Finishing
Ensure that units remain in their steel forms for the duration of the curing operation. Upon removal of the forms, provide a Class 1 finish as specified in 504.03.02.H.1 to the entire precast concrete culvert unit, including exterior, interior, and lap surfaces. For culverts, af ter approval of the Class 1 finish, apply 1 coat of an epoxy waterproofing on the exterior of the roof slab. Apply this coating in the precaster’s plant not earlier than 72 hours after fabrication, and after the concrete compressive strength has reached 4,000 pounds per square inch. Ensure that the concrete surfaces of the precast units are dry during application of the epoxy waterproofing. Apply the epoxy waterproofing according to the product manufacturer’s recommendations.
904.03.05 Shipping and Handling
Handle and ship as specified in 904.01.05.
904.03.06 Quality Control and Acceptance Requirements
Notify the ME in writing at least 21 days before start of production. For quality control, keep applicable records according to PCI Division 1, Quality Control, or NPCA requireme nts, and supply copies of these records to the ME as requested. Ensure that the quality control technician performing all tests is certified as an ACI Field Testing Technician, Grade 1. Submit Quality Control Plan to ME for review and approval. Follow the Department approved Buy America Compliance Plan. Provide documentation of compliance when requested by the ME. During production, the ME will inspect the quality of materials and the process of manufacture. The ME will accept the concrete as specified in 903.03.05 and will inspect the finished pieces prior to shipping for dimensional tolerances and damage. If the concrete piece is spalled, honeycombed, chipped, or otherwise defective, the ME may reject the piece or approve repairs. If the ME does not inspect the precast concrete item, submit certifications of compliance as specified in 106.07.
904.04 Prestressed Concrete
904.04.01 Component Materials
Provide materials as specified: Concrete ................................ ................................ ................................ ................................ ..................... 903.03 Mortar................................ ................................ ................................ ................................ ...................... 903.08.01 Curing Materials ................................ ................................ ................................ ................................ .......... 903.10 Reinforcement Steel ................................ ................................ ................................ ................................ ..... 905.01 Prestressing Reinforcement ................................ ................................ ................................ .......................... 905.02 Bolts and Bolting Materials ................................ ................................ ................................ .......................... 908.01 Epoxy Waterproofing ................................ ................................ ................................ ............................... 912.02.02 Epoxy Bonding Compound ................................ ................................ ................................ .......................... 919.07 In the construction of prestressed concrete I-beams or prestressed concrete slab and box beams, when the use of galvanized reinforcement steel is planned for the deck construction, galvanize all reinforcement steel that will provide composite action. For prestressed concrete piles in a marine environment, use grit impregnated epoxy -coated prestressing steel st rands as specified in 905.02. When storing, cover the strands with an opaque polyethylene sheeting or other suitable protective material to protect the reinforcement from exposure to sunlight, sal t spray, and weather. For stacked bundles, drape the protective covering around the perimeter of the stack. Adequately secure the covering; however, allow air circulation to prevent condensation under the covering. Do not store epoxy-coated prestressing steel within 1,000 feet of ocean or tidal water for more than 2 months.
904.04.02 Fabrication
Fabricate prestressed concrete at a plant as specified in 1011.02 and listed on the QPL. Provide an office for the ME as specified in 1011.03.
504.03.02 E. Consolidate concrete with internal vibrators. The fabricator may use external vibration to
supplement internal vibration. Only place concrete in the presence of, or as directed by, the ME. For prestressed concrete box beams, place voids in the forms after the ME has inspected the concrete poured to encase the strands in the bottom portion of the beam.
904.04.03 Curing
Cure as specified in 904.01.03, except that the required str ipping strength is 4 ,000 pounds per square inch for Class P, 4,500 pounds per square inch for Class P-1, and 5,000 pounds per square inch for Class P-2 concrete. In addition, when the ambient air temperature is above 100 °F, initiate a water cure or other approved method as soon as the concrete is able to receive the water without physical damage to its surface. The fabricator may discontinue this cure upon introduction of steam, provided that a relative humidity of 100 percent is maintained.
904.04.04 Removing Forms and Finishing
Do not remove side forms until the strength of 2 cylinders, similarly cured as the member, achieves at least 2,500 pounds per square inch. Do not move the member from the bottom forms before detensioning. Upon the removal of forms, the ME may reject any member that has 1 prestressing strand exposed for a length in excess of 24 diameters, or 2 or more strands visually exposed. In addition, the ME may reject any unit that is honeycombed to such an extent that chipping away from honeycombed concrete results in the conditions described for exposed strands. If the ME determines that the defective areas can be repaired, submit a repair procedure to the ME for approval. Perform approved patching before detensioning. Provide a Class 1 finish, as spec ified in 504.03.02.H.1, on formed surfaces of the concrete members. For surfaces of concrete exposed to view in the finished structure, perform additional finishing by rubbing mortar on the surface using burlap. Ensure that the rubbing produces a smooth surface of uniform color and texture. Transversely score the top surface of members using a stiff wire brush. After the removal of hold -down devices from the bottom of the beams, coat the resulting holes with an epoxy bonding compound, and plug the holes with mortar while the epoxy bonding compound is still tacky. If the epoxy bonding compound dries out before the placement of the mortar, sandblast the area and reapply the bonding compound. Patch vent holes for box beams upon removal from forms after the internal void drains are opened. Treat portions of prestressed concrete beams as shown on the Plans with an epoxy waterproofing. Do not apply the epoxy waterproofing to the top surface of a beam. Use an epoxy waterproofing that closely mat ches the color of the concrete. Do not apply the epoxy waterproofing sooner than 72 hours after detensioning. Ensure that the concrete surface is dry and clean of oil, grease, and dirt before applying the coating. Apply the epoxy waterproofing by brush only, unless otherwise approved by the ME. Ensure that the epoxy waterproofing is applied uniformly and provides adequate coverage.
904.04.05 Shipping and Handling
The fabricator may handle members immediately after completion of detensioning. Before placing members in storage, ensure that surface finishing operations are completed and the member is approved by the ME. Do not remove a girder from the bed unless the differential between girder and air temperature is less than 80 °F. Before box and slab beams are moved to storage, inspect nonmetallic draining devices and open to provide for passage of water. Notify the ME at least 2 days before shipping. Do not ship until the class design strength as spe cified in Table 903.03.06-3 has been attained and a minimum of 72 hours have elapsed following detensioning. Determine shipping strength by testing a complete set of cylinders that represent the lot of concrete and were cured with the item. Transport girders in an upright position. Ensure that the points of support and directions of the reactions with respect to the girder are approximately the same during transportation and storage as in its final erection position. Request the Department’s approval for transportation or storage of girders in any other position.
904.04.06 Quality Control, Quality Assurance, and Acceptance Requirements
Notify the ME in writing at least 21 days before start of production. For quality control, keep applicable records in conformance with PCI Division 1, Quality Control, or NPCA requirements, and supply copies of these records to the ME as requested. Ensure that the quality control technician performing all tests is certified as an ACI Field Testing Technician, Grade 1. Submit Quality Control Plan to ME for review and approval. Follow the Department approved Buy America Compliance Plan. Provide documentation of compliance when requested by the ME. During production, the ME will inspect the quality of materials and the process of manufacture. The ME will accept the concrete as specified in 903.03.05 and will inspect the finished pieces prior to shipping for dimensional tolerances and damage. If concrete is placed on the same bed at different times in the day, the ME will split the day’s production into separate lots. If the concrete member is spalled, honeycombed, chipped, or otherwise defective, the ME may reject the piece or approve repairs. If the ME does not inspect the precast concrete item, submit certifications of compliance as specified in 106.07.