SECTION 502 - PORTLAND CEMENT CONCRETE PAVEMENT (Last Revised May, 2024)
502-1 DESCRIPTION. Construct a Portland Cement Concrete (PCC) pavement and shoulders, if
required, as detailed in the contract documents.
502-2 Materials
Portland Cement Concrete 501 Chemically Curing Adhesives for PCC Pavement Applications 701-14 Highway Joint Sealants (ASTM D6690, Type IV) 705-02 Premolded Resilient Joint Filler 705-07 Preformed Elastic Longitudinal Joint Seal 705-10 Preformed Elastic Transverse Contraction and Expansion Joint Seal 705-12 Lubricant for Preformed Elastic Joint Sealer 705-13 Longitudinal Joint Ties 705-14 Transverse Joint Supports 705-15 Wire Fabric for Concrete Reinforcement 709-02 Epoxy-Coated Bar Reinforcement, Grade 60 709-04 Quilted Covers (for Curing) 711-02 Plastic Coated Fiber Blankets (for Curing) 711-03 Polyethylene Curing Cover (White Opaque) 711-04 Membrane Curing Compound 711-05 Form Insulating Materials for Cold Weather Concreting 711-07
502-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 Water 712-01 If requested, provide the Engineer with any appropriate manufacturer’s details and/or instructions for use of the listed materials before use of the product. In addition to meeting the requirements of §701-14, Chemically Curing Adhesive for PCC Pavement Applications, the material used to anchor longitudinal joint ties, dowels, or other miscellaneous items into hardened concrete must be a pourable, two-component, 100% solid structural epoxy dispensed: • From side-by-side cartridges by manual or pneumatically powered injection guns. • Through a static mixing nozzle that homogeneously mixes the material without any hand mixing.
502-2.01 Performance Engineered Mixes (PEM) Provide a Performance Engineered Mix (PEM) in
accordance with Section 501, Portland Cement Concrete – General. The PEM concrete shall meet the design requirements of Materials Procedure MP502-01 Design and Approval of Performance Engineered Concrete Pavement for 502-PCC Pavements, unless otherwise specified in the contract documents. Obtain approval of the mix design from the Director of the Materials Bureau prior to placing any concrete. Any change to aggregate sources, major proportioning changes, cement type, supplementary cementitious material type or chemical admixture type/brand will require a new mix design. Minor changes in admixture dosages based on environmental conditions will not constitute a new mix design. The Regional Materials Engineer will evaluate changes to determine if a new trial batch is required.
502-2.02 High-Early-Strength (HES) Concrete. Use HES concrete where required in the contract
documents or where the contract documents require the pavement to be open to traffic in 48 hours or less. Design the HES mix to satisfy the opening to traffic time requirements of the project and Table 502-1, High-Early-Strength Concrete Mix Requirements. Submit the HES concrete mix design to the Engineer. Include admixture brands and dosages as well as mixing, transporting, placing, paving, curing, and anticipated strength gain details. Produce and place a 4.0 yd3 (minimum) trial batch at an off-contract location selected by the Contractor and agreed upon by the Engineer. Produce the trial batch using the same materials and processes as those to be used to produce concrete for the contract. Provide the Engineer a 7-day minimum advance notification of trial batch production. Produce and place the trial batch in the presence of the Engineer, the Regional Materials Engineer, and Materials Bureau personnel as per Materials Method MM502-02 Mix Design and Approval Procedure for High Early Strength (HES) Concrete for Portland Cement Concrete (PCC) Pavements. Changes other than minor fluctuations in admixture dosage rates require a new mix design and trial batch. The Engineer will reject the concrete if the specified plastic air content is not achieved. The Engineer may halt paving and order additional trial batches whenever the specified compressive strength requirements are not achieved. TABLE 502-1 HIGH-EARLY-STRENGTH CONCRETE MIX REQUIREMENTS Property Minimum Maximum 28 Day Compressive Strength 3000 psi - Opening Compressive Strength 2500 psi1 - Freeze-Thaw Loss (Test 502-3P, 3% NaCl) - 3.0 % Plastic Air Content 5.0 % 8.0 % Water – Cement Ratio (w/c) - 0.40
502-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 NOTES:
502-2.03 Load Transfer Devices. Refer to 705-14 and 705-15 for load transfer device requirements.
Material requirements as well as the approval and acceptance procedures will be included in the contract documents when load transfer devices other than epoxy coated steel are specified.
502-3 CONSTRUCTION DETAILS. Hold a pre-pave meeting 7 to 14 days before the planned start of
paving with the Engineer, any PCC paving and saw cutting subcontractors, and concrete suppliers to coordinate all aspects of paving and inspection, including equipment review, construction methods, and time and personnel requirements.
502-3.01 Equipment. Provide the Engineer with an equipment list and specifications a minimum of 14
days prior to the planned start of PCC paving. Bring all equipment needed to place, consolidate, finish, texture, cure, saw cut, seal, and test the PCC pavement to the job site a minimum of 1 full workday before its use to allow examination by the Engineer. Repair or replace any equipment found to be defective before or during its use. Discontinue any operation if unsatisfactory results are being obtained. Use of equipment other than described below is subject to the approval of the Director, Materials Bureau.
502-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
502-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 mix the curing compound. Use nozzles with spray shields to prevent drift. Flush nozzles daily before use. Maintain equipment and supplies, including extra nozzles, to ensure uninterrupted curing compound application. In a multi-lane slip form paving operation, use self-propelled applicators guided by the same reference system as the slip form paver. Otherwise, applicators need not be self-propelled.
502-3.02 Weather Limitations
502-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
502-3.03 Subbase Course. Install a subbase course in accordance with Section 304, Subbase Course,
before placing PCC. If the area is available, extend the prepared subbase course at the same line, grade, and cross slope as the area being paved such that it is at least: • 3 feet beyond the longitudinal edges of a slipform pavement. • 1 foot beyond the outside longitudinal edges of the fixed forms. Additional subbase course that is not included in the finished work will be paid for under Section 304 items included in the contract.
502-3.04 Slipform Paving. Establish a reference system to achieve the specified smoothness level. If
string lines are used, set them by survey and use dual lines whenever possible. Maintain uniform concrete quality and head in front of the paver. Coordinate concrete delivery to maintain continuous forward movement of the paver and avoid excessive delivery truck queues. Keep paver tracks clear of concrete and debris before and during paving. Wet the entire subbase surface without forming puddles or mud immediately before placing concrete. Consolidate the entire concrete placement using internal vibrators attached to the paver. Combine paver forward speed, vibrator frequency, and vibrator depth to consolidate the concrete without segregation, vibrator trails, or contacting the joint assemblies. Discontinue vibration and tamping if the paver stops. Determine edge slump by extending a 2 foot (minimum) long straightedge over the longitudinal pavement edges. Immediately correct edge slumps greater than 1/4 inch that are between concrete placements and greater than 3/8 inch at free edges and HMA shoulders.
502-3.05 Fixed Form Paving.
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 Use hand-held vibrators ahead of the paving equipment to consolidate all concrete not consolidated by machine-mounted internal vibrators. Keep hand-held vibrators perpendicular to the pavement surface. Vibrate between 2 and 4 seconds in each location, overlapping adjacent locations. Do not drag vibrators through the concrete. Do not walk through the consolidated concrete. Mark the midpoint (± ½ inch) of each transverse contraction joint such that the saw cut operator can accurately locate the first-stage saw cut locations.
502-3.06 Joint Construction. The Engineer will inspect the longitudinal joint ties and transverse joint
supports for compliance to the relevant Materials Details before any joint hardware placement is allowed. Construct joints in accordance with the Standard Sheets and approved Materials Details. Do not stand on joint hardware. Base final joint layout on construction staging and the actual location of utilities, drainage structures, intersections, tapers, and other irregular areas. Submit a proposed joint layout to the Engineer at least 10 calendar days prior to PCC paving. Obtain the Engineer’s approval of the joint layout before paving. Inserting dowels and/or longitudinal joint ties into plastic concrete will be considered. Submit a plan to verify dowel and tie locations, depth, and alignment to the Engineer for consideration. Do not insert dowels or ties until the plan is approved by the Engineer. Make first-stage saw cuts 1/8 inch wide. Make second-stage saw cuts, clean, and seal joints in accordance with §502-3.12, Sealing Joints.
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 • Longitudinal axes of the dowels are aligned parallel with the pavement centerline and pavement surface such that the maximum misalignment of one dowel end relative to the other is ¼ inch. • Midpoint of the longitudinal axis of each dowel is at the center of the joint (±1 inch). • Longitudinal axes of the two end dowels are 4 to 12 inches from the longitudinal joints. • Longitudinal axes of the dowels are spaced 12 inches apart. Mark the location of each contraction joint on the subbase before placing concrete such that the assembly is properly positioned. Also mark the longitudinal midpoints of the dowels such that the saw cut operator can accurately locate first-stage saw cuts. In a slipform paving operation, mark the joint support midpoint on the subbase immediately adjacent to the pavement. In a fixed form paving operation, mark the joint support midpoint on the form or such that the saw cut operator can easily locate the joint midpoint. Do not cut the shipping wires. Make first-stage saw cuts as soon as the concrete has hardened sufficiently to permit sawing without causing raveling wider than 1/8 inch. Replace blades if raveling persists. Center first stage saw cuts within 1 inch of the longitudinal midpoints of the dowels. Complete first-stage saw cuts before any uncontrolled cracking occurs. Be prepared to make first-stage saw cuts 24 hours a day to prevent uncontrolled cracking. Provide lighting required to make first-stage saw cuts at night at no additional cost to the State. Sweep or wash first-stage saw cut debris from the pavement before it rains, or before opening the pavement to any traffic, such that debris does not enter the joint.
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 placed concrete. Immediately remove plastic concrete in front of the bulkhead and from the exposed joint support. The transverse joint assembly may be omitted and a solid bulkhead may be used. In this case, drill and anchor dowels, if required, into the transverse joint face.
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 It is highly desirable to align longitudinal joints with the permanent pavement markings. Tied longitudinal joints located in the wheel paths of the completed pavement will require ties placed 24” on center.
502-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 in the 502 Standard Sheets. Reinforce the slab that contains the structure. Select reinforcement size and spacing such that: As ≥ 0.0018(s)(t) where: As = Area of a steel bar (in2) s = Spacing of steel bars (in). Minimum 3” clearance between bars. t = Slab thickness (in) Use mat reinforcement with steel in both directions. Use top and bottom double mat reinforcement for slabs thicker than 10”. Refer to the Standard Sheet for mat reinforcement placement locations. When using telescoping manholes, remove temporary support bolts from the telescoping manhole casting as soon as the concrete hardens.
502-3.07 Paving Adjacent to Existing Concrete. Wherever paving equipment operates on existing PCC
pavement that is to remain, install bolt-on track covers or rubber tired, flangeless wheels. Remove all debris on the existing PCC pavement in the equipment track. Immediately remove any concrete that spills onto the existing concrete. When paving from (or to) a transverse construction joint or intersecting pavement, use hand-held vibrators to thoroughly consolidate any concrete inaccessible to the paving equipment vibrators. Hand finish these areas with the minimum effort required to produce an acceptable surface. Do not dump the grout box head into the pavement concrete when approaching a construction joint.
502-3.08 Plastic Thickness Determination. Provide the Engineer with a round, rigid, nonaluminum
probe, having a 1/8-inch diameter. The Engineer will determine the plastic concrete thickness by inserting the probe and measuring the insertion depth. The Engineer will check thickness at least every 150 feet of paving and at least 2 feet from the placement edge. Keep several probes at the project. The minimum measured plastic thickness must be equal to (-1/4 inch) or greater than the thickness required in the contract documents. Areas not meeting minimum thickness will be treated in accordance with §502-3.14, Damaged or Defective Concrete. If 2 consecutive measurements do not meet minimum thickness, stop paving and reestablish the paving operation to achieve acceptable thickness. No additional payment will be made for concrete placed in excess of:
502-3 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 • ¼ inch of the designed pavement thickness when placing an overlay on an existing pavement. • ½ inch of the designed pavement thickness when placing directly on subbase.
502-3.09 Finishing. Provide an ACI certified concrete flatwork finisher to supervise finishing. Provide
proof of ACI flatwork certification to the Engineer. Mechanically finish the pavement after consolidation and strike off. Use machine mounted finishers such as full-width finishing pans, transverse oscillating screeds, longitudinal floats, pan floats or separate pieces of equipment such as tube floats. Correct bumps with a 16-foot straight edge or bump cutter specifically made for finishing concrete. After mechanical finishing, hand finish the pavement to correct and seal minor imperfections. Hand finish with magnesium floats, lutes, and/or trowels. Use work bridges to hand finish concrete inaccessible from the pavement edge. Keep hand finishing to a minimum. Do not use excess mortar or discarded concrete to fill low areas. Do not add water to the concrete surface to close imperfections. Do not trowel bleed water into the surface. Stop paving or reformulate the concrete mix if surface imperfections that require additional water to close routinely occur. Ensure the saw cut operator can locate joint sealant locations between separate, adjacent placements. This may be accomplished with a small radius (1/4 inch) edger along the edge of the second placement.
502-3.10 Texturing. Immediately after finishing and prior to applying the curing compound, texture the
concrete surface using one of the following procedures in accordance with the contract documents. Apply longitudinal tining if no texturing method is designated in the contract documents. Additional requirements, such as Mean Texture Depth measured by a sand patch test or a profiler may be performed to check texturing adequacy. For a closed drainage system, provide an 8 - 12-inch blank in the texture along the pavement edges to enhance drainage to catch basins.
502-3.11 Curing. Apply curing compound no later than 5 minutes after texturing. The Engineer may stop
paving if curing lags beyond the time limits noted. Cure concrete until it is eligible to open to construction traffic as per Table 502-3, Pavement Opening Requirements, based on the Contractor-submitted mix design and the trial batch evaluation.
502-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 faces in the calculations. Apply the curing compound in 2 direction passes with no longer than 15 minutes between passes. Immediately reapply curing compound to any damaged coating areas. During curing equipment breakdown, cure the pavement in accordance with §502-3.11B, Curing Covers. Do not apply curing compound in the rain. If rain damages the curing compound before it sets, reapply curing compound after the pavement surface dries.
502-3.12 Sealing Joints. Seal joints in accordance with the Standard Sheets.
First-stage saw cuts may be temporarily left unfilled if a placement is only subjected to occasional construction traffic, such as pickup trucks or cars. In this case, ensure debris does not enter the joints. Temporarily fill unsealed first-stage cuts with jute or backer rod if a placement is: • Subjected to consistent construction traffic. • Used as a haul road for subsequent concrete placements. • Temporarily opened to general traffic while final sealing has been delayed. Before cleaning, remove any temporary fillers and repair damaged joints in accordance with §502- 3.14, Defective or Damaged Concrete, including chipped joints resulting from debris accumulation in an unfilled or unsealed joint.
502-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 the exposed faces. Ensure the joint is completely dry before sealing. Do not allow any traffic on the pavement between cleaning and sealing. Reclean the joint if it rains between cleaning and sealing or if any traffic is on the placement between cleaning and sealing. Provide the Engineer a copy of the sealant Manufacturer's written recommendations for heating and application at least 1 work day before sealing. Follow those recommendations. Unless stated otherwise, the recommended pouring temperature is 40°F below the manufacturer's designated safe heating temperature, with an allowable variation of 40°F. Prior to sealing, discharge sealant from the applicator wand into a vessel and measure the sealant temperature. The temperature must be equal to or above the Manufacturer’s recommended minimum pouring temperature and equal to or below the Manufacturer’s recommended safe heating temperature. Do not use sealant heated above the safe heating temperature. Sealant may be reheated or heated in excess of 6 hours if allowed by the Manufacturer’s heating and application recommendations. In these cases, recharge the melter with fresh sealant amounting to at least 20% of the sealant volume remaining in the melter. Seal joints immediately after cleaning. Seal the joint from the bottom of the cut to within 1/2 inch of the pavement surface. Seal when the: • Air and surface temperatures are 40°F or warmer. • Air temperature is above the dew point. • Pavement surface and all joint surfaces are dry. Open to traffic after the sealant has cured to prevent tracking. Do not blot with fine aggregate.
502-3 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 An alternate method for checking stretch and compression, where applicable, may be performed by premarking or precutting the sealer to length prior to installation. If the measurement of any of these 5 sealers exhibits stretching in excess of 5% or compression in excess of 2%, modify the installation method to meet the requirements or discontinue installation. Once sealing operations begin, remove 1 joint per 100 in the presence of the Engineer to check stretch and compression. If the sealer is found to be stretched in excess of 5% or compressed in excess of 2%, remove the sealer material from successive joints in both directions until sealers are found that meet the stretch and compression requirements. Replace all joints sealers found with excess stretch or compression. Replace joint sealers removed and found to meet the stretch and compression requirements.
502-3.13 Pavement Protection. Protect the pavement and appurtenances from traffic and construction
operations. Protect the work and provide for traffic as indicated in the contract documents.
502-3.14 Damaged or Defective Concrete. The Engineer will identify all areas of damaged and
defective concrete. The Contractor shall submit a repair plan for the damaged or defective concrete to the Engineer for approval. Repair or replace all damaged or defective concrete in accordance with the approved repair plan. Damage and defects include, but are not limited to, cracking, spalling, poor consolidation, out of specification materials, or imperfections caused by inadequate pavement protection, traffic, and/or construction practices. Slipformed concrete with inadequate plastic thickness as described in §502-3.08, Plastic Thickness Determination, will be rejected in 150 foot segment lengths.
502-3.15 Hardened Surface Tolerance. After the concrete has hardened sufficiently, test each travel
lane, including ramps, with straight edges laid both longitudinally and transversely. Do not measure transverse deviations across longitudinal joints. The Engineer will mark longitudinal deviations in the pavement surface exceeding 1/4 inch in 15 feet and transverse deviations exceeding 1/4 inch in 10 feet. Diamond grind these deviations in accordance with §505-3.02, Bump Grinding, such that they do not exceed these parameters when retested. Shoulders and other areas not routinely exposed to traffic must meet 1/4 inch in 10 feet both longitudinally and transversely.
502-3.16 Opening to Traffic Open concrete pavements to construction traffic or general traffic based on
the requirements of Table 502-4, Pavement Opening Requirements, and if the joints have been addressed in accordance with §502-3.12, Sealing or Filling Joints using one of the following.
502-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
502-4 METHOD OF MEASUREMENT. The Engineer will measure the following quantities for items
incorporated into the finished pavement:
502-4.01 PCC Pavement, Unreinforced. The work will be measured for payment as the number of
cubic yards of unreinforced PCC pavement placed to the nearest cubic yard. Deductions will be made for catch basins, manholes, or other similar pavement obstructions requiring either mesh reinforced or heavily reinforced placements.
502-4.02 PCC Pavement, Mesh or Heavily Reinforced. The work will be measured for payment as the
number of cubic yards of reinforced concrete placed. No deductions will be made for drainage and utility structures or other similar pavement obstructions within the placement.
502-4.03 Transverse Joints. The work will be measured for payment as the number of feet of transverse
joints constructed that contain load transfer devices.
502-4.04 Longitudinal Joints. The work will be measured for payment as the number of feet of
longitudinal joints satisfactorily constructed that contain longitudinal joint ties.
502-4.05 Sealing Transverse Joints. The work will be measured for payment as the number of feet of
transverse joints sealed, excluding preformed sealers turned down at the pavement edges.
502-4.06 Sealing Longitudinal Joints. The work will be measured for payment as the number of feet of
longitudinal joints satisfactorily sealed.
502-5 Basis of Payment
502-5.01 PCC Pavement, Unreinforced. Include the cost of all labor, material, and equipment necessary
to perform the work, including first-stage saw cuts, in the unit price bid for PCC Pavement, Unreinforced. No payment will be made for areas that do not meet minimum plastic thickness requirements. No additional payment will be made for concrete placed in excess of the tolerances described in §502-3.08, Plastic Thickness Determination.
502-5.02 PCC Pavement, Mesh or Heavily Reinforced. Include the cost of all labor, material, and
equipment necessary to satisfactorily perform the work, including first-stage saw cuts, in the unit price bid for PCC Pavement, Mesh or Heavily Reinforced. No payment will be made for areas that do not meet minimum plastic thickness requirements. No additional payment will be made for concrete placed in excess of the tolerances described in §502-3.08, Plastic Thickness Determination.
502-5.03 Transverse Joints. Include the cost of all labor, material, and equipment necessary to perform
the work in the unit price bid for Transverse Joints.
502-5 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
502-5.04 Longitudinal Joints. Include the cost of all labor, material, and equipment necessary to perform
the work in the unit price bid for Longitudinal Joints. No additional payment will be provided for the additional number of longitudinal joint ties associated with constructing longitudinal joints in wheelpaths.
502-5.05 Sealing Transverse Joints. Include the cost of all labor, material, and equipment necessary to
perform the work, including second stage saw-cuts, in the unit price bid for Sealing Transverse Joints.
502-5.06 Sealing Longitudinal Joints. Include the cost of all labor, material, and equipment necessary to
perform the work, including second stage saw-cuts, in the unit price bid for Sealing Longitudinal Joints.
502-5.07 Quality Units for PEM Concrete Pavement Payment of Quality Adjustments for Performance
Engineered Mixtures will be made based on the number of Quality Units calculated in accordance with §501-5, Determination of Quality Adjustment. No Quality Units will be calculated for High Early Strength mixes. Payment will be made under: Item No. Item Pay Unit 502.0RCF PCC Pavement Cubic Yard R- Pavement Reinf. C- Concrete Class F- Friction Type 0 - Unreinforced 2 - Performance 1-Type 1 1-Mesh Reinforced 4-HES 2-Type 2 2-Heavily Reinforced 3-Type 3 9- Type 9 502.910L Transverse Joints Linear Foot 502.911L Longitudinal Joints Linear Foot L- Load Transfer 0- Epoxy Coated 1- ASTM A934 Epoxy Coated 2- Stainless Steel 3- Other 502.9201 Sealing Transverse Joints-Preformed Elastic Joint Sealer Linear Foot 502.9210 Sealing Transverse Joints- Highway Joint Sealant Linear Foot 502.9301 Sealing Longitudinal Joints -Preformed Elastic Joint Sealer Linear Foot 502.9310 Sealing Longitudinal Joints-Highway Joint Sealant Linear Foot 502.99 Performance Concrete Quality Adjustment - PCC Pavement Quality Unit
Portland Cement Concrete Pavement in other states
- Indiana 502 · PORTLAND CEMENT CONCRETE PAVEMENT, PCCP
- Missouri 502 · Portland Cement Concrete Base and Pavement
- Alabama 450 · PORTLAND CEMENT CONCRETE PAVEMENT
- Arkansas 501 · PORTLAND CEMENT CONCRETE PAVEMENT
- Colorado 412 · PORTLAND CEMENT CONCRETE PAVEMENT
- Delaware 501 · PORTLAND CEMENT CONCRETE PAVEMENT
- Georgia 430 · Portland Cement Concrete Pavement
Get an email when 502 changes
New York revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.