TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 414 - QUICK -SET SLURRY ................................ ................................ .... 171 SECTION 415 - PAVER PLACED SURFACE TREATMENT ................................ .. 172 SECTION 416 - COLD RECYCLING ................................ ................................ ...... 172 SECTION 417 – ASPHALT PAVEMENT USING RECYCLING TREATMENTS .... 172 SECTION 418 – ASPHALT PAVEMENT JOINT ADHESIVE ................................ . 179 SECTION 419 - FOG SEAL ................................ ................................ ..................... 181 SECTION 420 - POROUS ASPHALT PAVEMENT ................................ ................. 181 SECTION 421 STONE MATRIX ASPHALT (SMA) PAVEMENTS ......................... 181 SECTIONS 422 THRU 489 - (VACANT) ................................ ................................ .. 181 SECTION 490 - COLD MILLING ................................ ................................ ............ 182 SECTIONS 491 THRU 499 (VACANT) ................................ ................................ .... 183 Section 500 ................................ ................................ ................................ ............ 184 PORTLAND CEMENT CONCRETE ................................ ............................... 184 SECTION 501 - PORTLAND CEMENT CONCRETE - GENERAL ......................... 184 SECTION 502 - PORTLAND CEMENT CONCRETE PAVEMENT ........................ 205 SECTION 503 - PORTLAND CEMENT CONCRETE FOUNDATION FOR PAVEMENT ................................ ................................ ................................ ............ 222 SECTION 504 VACANT ................................ ................................ .......................... 224 SECTION 505 – DIAMOND GRINDING ................................ ................................ . 224 SECTIONS 506 THRU 549 (VACANT) ................................ ................................ .... 227 STRUCTURES ................................ ................................ ................................ .....228 SECTION 551 - DEEP FOUNDATION INSTALLATION AND TESTING ............... 228 SECTION 552 - EXTERNALLY STABILIZED CUT STRUCTURES ...................... 256 SECTION 553 - COFFERDAMS AND WATERWAY DIVERSION STRUCTURES 263 SECTION 554 - FILL TYPE RETAINING WALLS ................................ ................. 266 SECTION 555 - STRUCTURAL CONCRETE ................................ ......................... 292 SECTION 556 - REINFORCING STEEL FOR CONCRETE STRUCTURES ........... 307 SECTION 557 - SUPERSTRUCTURE SLABS, SIDEWALKS ON BRIDGES, AND STRUCTURAL APPROACH SLABS ................................ ................................ ....... 312 SECTION 558 - LONGITUDINAL SAWCUT GROOVING OF STRUCTURAL SLAB SURFACE ................................ ................................ ................................ ................ 330 SECTION 559 - PROTECTIVE COATINGS FOR STRUCTURAL CONCRETE ..... 331 SECTION 560 - MASONRY ................................ ................................ ..................... 334 SECTION 561 (VACANT) ................................ ................................ ........................ 342 SECTION 562 - REINFORCED CONCRETE THREE -SIDED STRUCTURES ........ 342 SECTION 563 - PRESTRESSED CONCRETE UNITS (STRUCTURAL) ................. 345 SECTION 564 - STRUCTURAL STEEL ................................ ................................ .. 346 SECTION 565 - BRIDGE BEARINGS ................................ ................................ ...... 349 SECTION 566 - MODULAR EXPANSION JOINT SYSTEMS ................................ . 357 SECTION 567 - BRIDGE JOINT ................................ ................................ ............. 361 SECTION 568 - BRIDGE RAILING ................................ ................................ ......... 370 SECTION 569 - PERMANENT CONCRETE TRAFFIC BARRIER FOR STRUCTURES ................................ ................................ ................................ ......... 373 SECTION 570 - PAINT REMOVAL OPERATIONS ................................ ................ 381 SECTION 571 - DISPOSAL OF PAINT REMOVAL WASTE ................................ .. 393 SECTION 572 - STRUCTURAL STEEL PAINTING: SHOP APPLIED ................... 399 TABLE OF CONTENTS NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 573 - STRUCTURAL STEEL PAINTING: FIELD APPLIED - TOTAL REMOVAL ................................ ................................ ................................ .............. 406 SECTION 574 - STRUCTURAL STEEL PAINTING: OVERCOATING AND LOCALIZED ................................ ................................ ................................ ........... 413 SECTION 575 (VACANT) ................................ ................................ ........................ 421 SECTION 576 - BRIDGE DRAINAGE SYSTEM ................................ ..................... 421 SECTION 577 (VACANT) ................................ ................................ ........................ 424 SECTION 578 - BONDED CONCRETE OVERLAY FOR STRUCTURAL SLABS .. 424 SECTION 579 - STRUCTURAL SLAB RECONSTRUCTION PREPARATION ...... 426 SECTION 580 - REMOVAL OF STRUCTURAL CONCRETE ................................ 430 SECTION 581 - REMOVAL OF BRIDGE OVERLAYS ................................ ........... 431 SECTION 582 - REMOVAL AND REPLACEMENT OF STRUCTURAL CONCRETE ................................ ................................ ................................ ................................ . 432 SECTION 583 - SHOTCRETE ................................ ................................ ................. 436 SECTION 584 - SPECIALIZED OVERLAYS FOR STRUCTURAL SLABS ............ 441 SECTION 585 - STRUCTURAL LIFTING OPERATIONS ................................ ...... 447 SECTION 586 - MISCELLANEOUS STRUCTURAL RECONSTRUCTION ........... 451 SECTION 587 - BRIDGE RAILING RECONSTRUCTION ................................ ..... 455 SECTION 588 - BRIDGE JOINT REHABILITATION ................................ ............ 458 SECTION 589 - REMOVAL OF STRUCTURAL STEEL ................................ ......... 458 SECTION 590 - ADJUSTMENT OF BRIDGE APPURTENANCES ......................... 460 SECTIONS 591 THRU 593 (VACANT) ................................ ................................ .... 461 SECTION 594 - TIMBER AND LUMBER ................................ ................................ 461 SECTION 595 - WATERPROOFING SYSTEMS FOR STRUCTURES .................... 463 SECTION 596 - OPEN STEEL FLOOR ................................ ................................ ... 463 SECTION 597 - TIMBER BRIDGE RAILING AND TRANSITIONS ....................... 464 SECTIONS 598 AND 599 (VACANT) ................................ ................................ ....... 467
201-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Section 200 EARTHWORK SECTION 201 - CLEARING AND GRUBBING
201-1 Description .
201-1.01 General. This work shall consist of clearing, grubbing, removing and disposing of all trees,
brush, stumps, fences, debris, and miscellaneous structures not covered under other contract items within the construction area and such other areas as specified or directed. The Contractor shall clear such additional areas within the limits of the right -of-way and easement lines as specified or directed.
201-1.02 No Burning Requirement. Materials generated by the work, including construction and
demolition debris, shall not be disposed of by burning on or off the site. Off site burning in a permitted solid waste incinerator or in another lawful manner as refuse derived fuel will be per mitted.
201-2 MATERIALS (Not specified)
201-3 Construction Details .
201-3.01 Limits of Work Areas. The Engineer will establish the limits of areas to be cleared and
grubbed, to be cleared but not grubbed, or areas, objects or features that are designated to remain undisturbed. In general, the work areas shall include the road section, stream channels, ditches, temporary approaches to bridges, detours and other areas as shown in the contract documents or directed by the Engineer. The Engineer will designate fences, structures, debris, trees and brush to be cleared where grubbing is not required. Clearing beyond the areas of construction shall be done only where specified or directed.
201-3.02 Clearing and Grubbing. During the life of the contract the Engineer may order the clearing of
any trees within the R.O.W. that the Engineer determines to be hazardous or dead and unsightly. The Contractor shall carefully prune all branches of trees less than 16 feet above any part of the roadway and all branches which have been broken or injured during construction. The work shall be done as specified under §614 -3.01A Equipment and B. Pruning. Whenever trees are felled or trimmed on/or adjacent to highways, all wood shall be immediately removed from the roadway or any area that would present a hazard to traffic. Grubbed stumps shall be moved immediately at least 30 feet from the edge of pavement. No trees, tree trunks, stumps or other debris shall be felled, sidecast or placed outside the limits of the road section. No grubbing will be required beneath the embankment where the finished grade will be 6 feet or more above the original ground surfac e unless otherwise specified in the contract documents. Where trees or existing stumps are cleared and grubbing is not required, the tree trunk or existing stump shall be cut off not more than 6 inches above the original ground surface unless otherwise approved. Exposed stumps not required to be removed , but which are within 30 feet of the edge of the pavement or are in a built -up area , shall be
201-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 chipped out to a depth of not less than 6 inches below the finished grade and the holes backfilled if directed by the Engineer. This work shall be completed within one week after start of work on the tree.
201-3.03 Disposal .
201-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Chipping. Wood may be reduced to chips by the use of an approved chipping machine or stump grinder. Chips shall be 1/2 inch maximum thickness or of other approved thicknesses. Chips resulting therefrom may be disposed of by being stockpiled and used as mulch for planting, by distribution on the ground surface in wooded areas within the right -of-way as approved by the Engineer, or by disposal at a location off the contract site satisfactory to the Engineer.
201-4 Method of Measurement .
201-4.01 Per Acre . Payment for Clearing and Grubbing will be made at the unit price bid per acre
computed to the nearest one tenth acre .
201-4.02 Per Lump Sum. Payment for Clearing and Grubbing will be made on a lump sum basis for
work satisfactorily completed. Monthly payments will be made in proportion to the amount of work done as determined by the Engineer.
201-4.03 Borrow Areas. Borrow pits or other pit areas from which material is secured shall not be
included for measurement of clearing and grubbing.
201-5 Basis of Payment .
201-5.01 Clearing and Grubbing. Payment will be made at the contract price to furnish all materials,
labor and equipment necessary to satisfactorily complete the work as specified. No separate payment will be made for any excavation, backfill or earth cover necessary to complete the wo rk of disposal outside the embankment area nor for the work in handling, storing, rehandling and hauling of disposable material within or outside the right -of-way. Payment will be made under: Item No. Item PayUnit 201.06 Clearing and Grubbing Lump Sum 201.07 Clearing and Grubbing Acre
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 202 - DEMOLITION OF BUILDINGS AND STRUCTURES (Last Revised May , 2022)
202-1 DESCRIPTION. This work shall consist of the demolition, removal and disposal of existing
buildings; and the demolition, removal and disposal of existing bridge structures, removal and disposal of steel supported and concrete superstructure supported structural slabs (with and without shear connectors), in accordance with the contract documents, or as directed by the Engineer.
202-2 MATERIALS. Not specified.
202-3 Construction Details .
202-3.01 General. The Contractor shall conduct all demolition and removal operations in accordance
with the contract documents and local building codes. The Contractor shall repair or replace in kind sidewalks, curbs, roadway and other materials designated to remain in p lace which are damaged as a result of the work at no additional cost to the State. Where a falling hazard of 6 feet or more above a lower level exists to workers, each worker shall be protected from falling by fall arrest systems, or guardrail systems to a height of approximately 42 inches, or by covering openings. All floor or deck ope nings not used as material drops shall be covered over with materials substantial enough to support the weight of any loads which may be imposed upon them. Such materials shall be properly secured to prevent accidental movement. When excavation is required, the Contractor shall provide protection for the public in accordance with §107 -05K. Open Excavations and Trenches . The Contractor shall make provisions to control dust resulting from demolition operations by wetting the work area and debris or other appropriate measures.
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 preparing an adequate Demolition Plan and conducting adequate engineering surveys that safeguard workers and the public. When the Demolition Plan is required to be prepared by a Professional Engineer, the Professional Engineer shall prepare the following, as appropriate. When the Demolition Plan is not required to be prepared by a Professional Engineer, the Contractor shall prepare the following, as ap propriate:
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 c. Description of ground and/or water protection plans and materials for containment associated with collection of paint waste or other falling debris generated from subsequent cutting/demo operations, or reference to other submittals .
202-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Before any structure or building served with or having utility facilities thereon is demolished, all utility services shall be shut off, capped, or otherwise made safe and controlled outside the building or off the structure, before the general demolition work is started. All severed sewer lines or drains emanating from the building or structure shall be capped or otherwise tightly sealed to prevent the entry of foreign materials into the main sewer or drain. All electric circuits in any work area that is or may become wet or humid during the work shall be shut down and locked out. If electrical power is required, temporary circuits may be brought into the work area, provided such circuits are ground fault pro tected.
202-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The Contractor shall remove, or otherwise remediate, asbestos materials or other hazardous materials on each structure or building before demolition work begins. If it is not feasible to remediate hazardous materials from a building due to lack of structur al integrity, or other unsafe conditions, the Contractor shall obtain a regulatory variance as applicable, and perform controlled demolition in accordance with applicable federal and state regulations.
202-3.02 Disposal of Buildings. The Contractor shall demolish buildings designated for disposal and
released to the Contractor 30 days or more before the contract completion date in accordance with the contract documents. The Contractor shall demolish buildings on site without the use of explosives, unless approved by the Deputy Chief Engineer (Construction). Any proposal to allow such building or any portion thereof to remain standing at the site, or to be relocated to another site, will be referred to the Regional Director for approval and shall be accomplished under terms and conditions established by the St ate.
202-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 necessary for the treatment to be effective or to prevent migration of insect, pest, or vermin. Demolition work shall not proceed until the extermination is completed. If extermination is being conducted because it was ordered by the City, County, or NYS Department of Health, the Contractor shall notify that office that the extermination has been completed and shall obtain their written concurrence that the extermination work was satisfactorily completed.
202-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 4. Walls shall be made self -supporting, safe and weatherproof with construction similar to or consistent with the remaining building. Supports and bracing shall be installed in accordance with the contract documents.
202-3.03 Relocation of Buildings. The Contractor shall relocate buildings, to sites designated by the
owner and approved by the Department, in accordance with the contract documents. Sites to which the buildings are to be moved will be furnished without cost to the Contractor.
202-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 D. Restoration Work. The Contractor shall restore exterior portions of the building, including steps, porches, railings, and other appurtenances, to as good and serviceable condition, as existed prior to its relocation, in accordance with local building codes. Any property d amaged or destroyed during the execution of the work shall be repaired or replaced at no additional cost to the State.
202-3.04 Dismantling and Storage of Superstructures. The Contractor shall dismantle and store
existing superstructures in accordance with the contract documents. A superstructure is defined as that part of a structure above, supported by, and including the bearings. The Contractor shall carefully remove concrete, paving material and other materials from the existing superstructures so as to prevent damage to superstructures to be stored. The parts of superstructure designated to be stored shall be protected, and stored on site or at the locations designa ted. All stored members shall be adequately match -marked in order to facilitate reassembly. Any parts of the superstructure designated for storage or to remain which are damaged during the course of the operation or during storage shall be repaired or re placed at no additional cost to the State.
202-3.05 Removal of Superstructures. The Contractor shall demolish and remove existing
superstructures at the site in accordance with the contract documents. A superstructure is defined as that part of a structure above, supported by, and including the bearings. The removal of steel suppo rted structural slabs where the supporting structural steel is to remain shall be performed in accordance with §202 -3.07 Removal of Steel Supported Structural Slabs. The Contractor shall obtain the approval of the Deputy Chief Engineer, Structures (DCES) for any proposal to allow such structure or any portion thereof to remain standing on the site or to be relocated to another site. The Contractor shall designate all areas that could become subject to collapse or that could become unstable as a result of demolition activity as non -access areas, and clearly identify them. The public, workers and equipment with operators shall remain o utside these designated non -access areas at all times during demolition operations or at any time the area is subject to potential superstructure collapse.
202-3.06 Removal of Substructures. The Contractor shall demolish and remove existing substructures
in accordance with the contract documents. A substructure is defined as that part of a structure below the superstructure, such as abutments, piers, and wingwalls. The Contractor shall com ply with the appropriate construction details specified in Section 203 Excavation and Embankment . Excavations shall be dewatered and kept free from water, snow and ice as necessary. If excavation protection is necessary to protect structures or other improvements, or if the alternatives of laying back slopes or benching are not available, the support system shall be as indicated in the contract documents. Sheeting or piling shown in the contract documents which is integral with the substructure and is designated to remain in place shall be cut off at the elevations shown. If indicated in the contract documents, existing sheeting or piling shall be extracte d. The Contractor may, with the permission of the Engineer, extract sheeting or piling not shown to be extracted or designated to remain in place rather than cutting it off at the elevations shown on the plans, at no additional cost to the State. Resulting holes shall be backfilled with suitable material placed in lifts and compacted, and the area regraded.
202-3.07 Removal of Steel Supported Structural Slabs. The Contractor shall remove steel supported
structural slabs in accordance with the contract documents. All concrete and other materials carried by the supporting steel members of the superstructure shall be removed unless the plans specifically indicat e removal under another item or that the material is to remain in place. Prior to beginning removal operations, the Contractor shall mark the location of the existing primary structural steel members on the
202-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 surface of the slab. Prior to beginning any sawcutting of the structural slab in order to facilitate removal, the Contractor shall mark the edges of existing structural steel members in contact with the bottom of the slab on the slab surface, or make othe r adequate provisions approved by the Engineer to prevent damage to the underlying structural steel. The Contractor shall protect existing structural steel while removing steel supported structural slabs. Nicks or gouges in existing structural steel to remain caused by demolition operations shall be reviewed by the DCES and the Contractor shall repair tho se damages in accordance with the Steel Construction Manual (SCM) and the direction of the DCES. All unpainted structural steel surfaces exposed by concrete removal, against which new concrete will be subsequently placed, shall be cleaned sufficiently to ensure proper bond between the steel and concrete.
202-3.08 Removal of Concrete Superstructure Supported Concrete Slabs. Concrete slabs shall be
removed to expose the tops of the prestressed concrete beams and diaphragms while retaining the tie -in bar reinforcement, which is precast into the prestressed concrete beam and diaphragms. All other reinforcement and wire mesh shal l be removed. The concrete slab shall be removed with chipping hammers not exceeding 40 lbs in weight with the bit removed. The Contractor shall exercise care during
202-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 the execution of the work to avoid damaging or loosening material that is to remain. If the Contractor’s operations result in damage to concrete that is to remain, the Contractor shall stop work and make immediate corrections at no additional cost to the S tate. Any damage caused by the Contractor’s operations to material that is to remain shall be repaired or replaced. If the concrete superstructure to remain is cut, or otherwise damaged by Contractor operations, the Contractor shall stop work immediately until a repair procedure is approved by the DCES. The Contractor may request in writing to the DCES, to mill the top of the deck to a maximum depth of 2 inches, or until the top mat of reinforcing is exposed, whichever is less. The request shall include the specifications for the piece of equipment to be utilized.
202-4 Method of Measurement .
202-4.01 General. Vacant.
202-4.02 Disposal of Buildings. The work under disposal of buildings will be measured for payment on
a lump sum basis for a specific building.
202-4.03 Relocation of Buildings. The work under relocation of buildings will be measured for payment
on a lump sum basis for a specific building.
202-4.04 Dismantling and Storage of Superstructures. The work under dismantling and storage of
superstructures will be measured for payment on a lump sum basis for a specific superstructure.
202-4.05 Removal of Superstructures. The work under removal of superstructures will be measured for
payment on a lump sum basis for a specific superstructure.
202-4.06 Removal of Substructures. The quantity of removal of substructures to be measured for
payment will be in cubic yards measured to the nearest whole cubic yard, computed from the payment lines.
202-4.07 Removal of Steel Supported Structural Slab. The quantity to be measured for payment will
be in square feet of structural slab removed, measured to the nearest whole square foot. Measurements will not make any deductions for openings.
202-4.08 Removal of Concrete Superstructure Supported Concrete Slab. The quantity to be measured
for payment will be in square feet of structural slab removed, measured to the nearest whole square foot.
202-5 Basis of Payment .
202-5.01 General. Vacant.
202-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 202-5.02 Disposal of Buildings. The lump sum price bid shall include the cost of all labor, materials and equipment necessary to satisfactorily complete the work. Progress payments will be made monthly in proportion to the amount of work completed. Suitable or select material obtained from other than the demolition site and used to fill foundation holes, and surface restoration will be paid for separately. Water used for dust control or compaction will be paid for separately if a contract pay item f or water is included in the contract. Closure of basement petroleum storage tanks will be paid for separately if regulations require the tank to be closed. The cost of asbestos removal, abatement, and disposal will be paid for separately. The cost of extermination shall be included in the lump sum price bid if the contract documents indicate that extermination work is required, otherwise it will be considered extra work.
202-5.03 Relocation of Buildings. The lump sum price bid shall include the cost of all labor, materials,
and equipment necessary to satisfactorily complete the work, including excavation necessary at the old or the new building site and water used for dust control or compaction if a cont ract pay item for water is not included in the original contract bid documents. Extermination shall be included in the lump sum price bid if the original contract bid documents indicate that extermination work is required. Progre ss payments will be made monthly in proportion to the amount of work completed. If a property owner, upon agreement with the Department, removes the building, the Contractor will be paid 20% of the bid price for demolition of the existing foundation, walks and other facilities. Suitable or select material obtained from other than the demolition site and used to fill foundation holes, and surface restoration will be paid for separately. The work of reconnecting and providing services for the relocated building at its new site will be paid for separately.
202-5.04 Dismantling and Storage of Superstructures. The lump sum price bid shall include the cost
of all labor, materials, and equipment necessary to satisfactorily complete the work. Progress payments will be made in proportion to the amount of work completed. The cost of paint waste disposal will be pa id for separately.
202-5.05 Removal of Superstructures. The lump sum price bid shall include the cost of all labor,
materials, and equipment necessary to satisfactorily complete the work. Progress payments will be made in proportion to the amount of work completed. The cost of paint waste disposal will be pa id for separately.
202-5.06 Removal of Substructures. The unit price bid shall include the cost of furnishing all labor,
materials, and equipment necessary to satisfactorily complete the work. Excavation and excavation protection required to access portions of the substructure for removal will be paid for separately. Material obtained from other than the demolition site and used to fill substructure holes and surface restoration will be paid for separately. Water used for dust control or compaction will be paid for separately if a contract pay item for water is includ ed in the contract. The cost of asbestos removal, abatement, and disposal will be paid for separately.
202-5.07 Removal of Steel Supported Structural Slabs. The unit price bid shall include the cost of all
labor, materials and equipment necessary to satisfactorily complete the work, including any sawcutting performed in order to facilitate removal.
202-5.08 Removal of Concrete Superstructure Supported Concrete Slabs. The unit price bid shall
include the cost of all labor, materials and equipment necessary to satisfactorily complete the work, including any sawcutting performed in order to facilitate removal. No additional payment will be made for removals, repairs or re placements made necessary due to the Contractor’s operations.
203-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Payment will be made under: Item No. Item Pay Unit 202.01nnnn Disposal of Buildings Lump Sum 202.03nnnn Relocating Buildings Lump Sum 202.11nnnn Dismantling and Storing Existing Superstructures Lump Sum 202.12nnnn Removing Existing Superstructures Lump Sum 202.19 Removal of Substructures Cubic Yard 202.2201 Removal of Steel Supported Structural Slabs (with shear connectors) – Type A Square Foot 202.2202 Removal of Steel Supported Structural Slabs (with shear connectors) – Type B Square Foot 202.2301 Removal of Steel Supported Structural Slabs (without shear connectors) – Type A Square Foot 202.2302 Removal of Steel Supported Structural Slabs (without shear connectors) – Type B Square Foot 202.24 Removal of Concrete Superstructure Supported Concrete Slabs (with shear connectors) Square Foot 202.25 Removal of Concrete Superstructure Supported Concrete Slabs (without shear connectors) Square Foot NOTE: nnnn denotes serialized pay item for each building or structure. SECTION 203 - EXCAVATION AND EMBANKMENT (Last Revised January 20 20)
203-1 DESCRIPTION. This work shall consist of excavation, disposal, placement and compaction of all
materials that are not provided for under another section of these Specifications, and shall be executed in conformance with payment lines, grades, thicknesses and typical sections specified in the contract documents.
203-1.01 Definitions.
203-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. A line located 2 ft. below the subgrade surface and extended to the intersection with the embankment side slopes, or
203-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 J. Borrow. Borrow is material required for earthwork construction in excess of the quantity of suitable material available from the required grading, cuts and excavations. Borrow may be necessary even though not shown in the contract documents.
203-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 only. The Contractor will be required to reimburse the State with a rebate for the material obtained in these areas. Permission will not be granted to excavate material beyond the design slopes if it is to be used on other than State contract work. The rebate to be obtained from the Contractor for this material is comprised of 1) A royalty based on the actual value of the excavated material, and 2) A credit for the difference in the Contractor's handling costs if these handling costs have been reduce d. The royalty which is to be obtained for the excavated material shall be appropriate for the item for which it is to be utilized and shall be comparable to the current price being paid to purchase similar material in the area. If the Contractor's handling costs associated with obtaining material from within the R.O.W. limits are greater than those for obtaining material from other acceptable sources, these additional handling costs must be borne by the Contractor. The royalty sh all not be reduced to offset any increased handling costs incurred by the Contractor. If the Contractor's handling costs associated with obtaining materials from within the R.O.W. limits are less than those for obtaining material from other acceptable sources, the differences shall be reimbursed to the State as a credit in addition to the r oyalty. The difference in the Contractor's handling cost shall be determined by an analysis based on a comparison of haul lengths, hauling equipment, hauling operation, use of haul roads or public highways, preparation and restoration of the borrow areas, and any other variables involved. Prior to modifying rock cut slopes, the Geotechnical Engineering Bureau must be consulted. If rock cut slopes are flattened sufficiently to eliminate the need for presplitting, an additional rebate will be necessary. All special requirements to be fulfilled by the Contractor, at the Contractor's own expense, shall be clearly stated in the agreement. The foregoing requirement of receiving a rebate from the Contractor for material obtained by modification of slopes shall apply only to locations not designated in the Contract Documents.
203-2 Materials .
203-2.01 General. The requirements for select materials and subgrade area materials are described
below. All processing operations including washing, removal of oversize material, blending, or crushing shall be completed at the source of the material. The procedure for ac ceptance or rejection of these materials shall be in conformance with the procedures contained in the geotechnical control procedure “Procedure for the Control and Quality Assurance of Granular Materials ”.
203-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 graded rock option is used. In that case, refer to §733 -13 Select Granular Subgrade . If concrete is used, any exposed mesh or rebar shall not exceed 1 in. in length. RAP is also permitted.
203-2.02 Unclassified Excavation and Disposal . None Specified.
203-2.03 Embankment In Place . Provide backfill material meeting the requirements of §733 -08
Embankment In Place .
203-2.04 Select Borrow. Provide backfill material meeting the requirements of §733 -09 Select Borrow .
203-2.05 Select Fill. Provide backfill material meeting the requirements of §733 -10 Select Fill .
203-2.06 Select Granular Fill . Provide backfill material meeting the requirements of §733 -11 Select
Granular Fill .
203-2.07 Select Granular Fill Slope Protection . Provide backfill material meeting the requirements of
§733 -12 Select Granular Fill Slope Protection .
203-2.08 Surface Settlement Gauges . Provide materials for the embankment construction control device
surface settlement gauge meeting the requirements of §733 -17 Surface Settlement Gauge .
203-2 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 203-2.09 Settlement Rods . Provide materials for the embankment construction control device settlement rod meeting the requirements of §733 -18 Settlement Rod .
203-2.10 Piezometers . Provide materials for the piezometer installation meeting the requirements of
§732 -11 Open Well Piezometer .
203-2.11 Applying Water . Water used for dust control purposes may be obtained from any source.
203-2.12 Select Granular Subgrade . Provide backfill material meeting the requirements of §733 -13
Select Granular Subgrade .
203-2.13 Select Structural Fill . Provide backfill material meeting the requirements of §733 -14 Select
Structural Fill .
203-2.14 Sand Backfill . Provide backfill material meeting the requirements of §733 -15 Sand Backfill.
203-3 Construction Details .
203-3.01 General. The Contractor shall remove all soil, rock, and other material, and utilize or dispose of
these materials as required by the contract documents. All excavation and embankment work shall be executed to payment lines shown in the contract documents. All graded earth surfaces outside the roadway limits shall be smoothed and trimmed in reasonably close conformity (6± in.) of true grade. After trimming, the area shall be left in a compact and satisfactory condition, free of large stones or other objectio nable materials, as determined by the Engineer. Earthwork construction operations requiring compaction shall not be performed from November 1st thru April 1st except with a Winter Earthwork submittal subject to the provision of this Section and approved by the Regional Director or his designated representative. Winter earthwork operations constitute an additional risk to the Department and Winter Earthwork subm ittals should not be expected to be automatically approved. Winter Earthwork will be subject to the following restrictions: • Transitioning from the normal construction season to the exempt winter earthwork months between November 1st and April 1st, the use of standard earthwork materials may be permitted only under the conditions where the air temperature, ground temperature and material temperature are all above 32° F at the time of placement. Modifications to compaction procedures, including but not limited to the use of thinner lifts, may be required when the temperatures are above 32° F but below 40° F at the time of placemen t. • Between November 1st and April 1st, if the air temperature, ground temperature, or material temperature is at or below 32° F, earthwork may only proceed using material that meets the requirements of §733 -16 Winter Earthwork and/or standard earthwork materi al placement utilizing the modified methods and procedures contained in the approved Winter Earthwork Submittal.
203-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 In all work incorporated into the final product, the Contractor shall not place material that is frozen, or place fill material on ground that is frozen to any depth regardless of the date.
203-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 portion of the cut immediately adjacent to the design slope is at least 5 ft. lower than the general level of the cut at all times until the lower payment line is reached. The construction of these temporary drainage facilities shall be considered as incidental to the construction of the project and no additional payment will be allowed. Any portion of an embankment or subgrade which has been damaged by the Contractor's equipment during the course of construction, shall be repaired and re -compacted by the Contractor at no additional cost to the State. Where seepage causes instability of slopes, excavation and backfill or other corrective measures shall be performed as ordered by the Engineer and paid for under the appropriate item. Excavation for the installation of slope protection may be necessary at any time and location throughout the duration of the contract and may not necessarily coincide with the Contractor's performance of the general excavation work.
203-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 section shall be provided in conformance with Standard Sheet Earthwork Transition and Benching Details . Where a subgrade area becomes defined by §203 -1.01E. Subgrade Area in a cut section, the materials placed and other details shall be as specified under §203 -3.02C. Proof Rolling in Cut Sections 3. Procedure , unless otherwise required by the contract documents. Prior to subbase course placement, the surface on which the subbase is to be placed shall be thoroughly compacted to the satisfaction of the Engine er.
203-3.02 Unclassified Excavation and Disposal.
203-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 extend for a minimum distance equal to the burden plus 3 ft. beyond the limits of fragmentation blasting within the section.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 blasting vibrations generated. The initial loading shall be computed using a Scaled Distance of 30 ft. The resulting particle velocity measured by the seismograph shall be evaluated by a Department Engineering Geologist. The Geologist's evaluation shall be the basis for adjusting the Scaled Distance. No separate payment shall be made for this work. The cost shall be included in the appropriate excavation item. The above requirements shall in no way relieve the Contractor of liability for any damage incurred as a result of the blasting operations.
203-3.03 Embankment In Place .
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 shall be prepared. Sod and topsoil shall be removed where the final pavement grade is 6 ft. or less above the existing ground surface and in other areas designated in the contract documents or by the Engineer. Prior to embankment construction and subbase c ourse placement, the surface on which the embankment and/or subbase is to be placed shall be thoroughly compacted to the satisfaction of the Engineer. Unsuitable materials other than sod and topsoil shall be removed to the depths shown in the contract docu ments or as directed by the Engineer. Underwater areas shall be filled in accordance with §203 -3.04 Select Borrow or §203 -3.05 Select Fill and paid for under its appropriate item. Where embankments are to be constructed over ground that will not adequately support embankment construction equipment, an initial layer of fill may be allowed to form a working platform. The need, manner of construction, and thickness of such a layer shal l be subject to approval of the Engineer, and the layer will be permitted only where the lack of support is, as determined by the Engineer, not due to deficient ditching, grading or drainage practices or where the embankment could be constructed in the app roved manner by the use of different equipment or procedures. Thicknesses of up to 3 ft. may be permitted for such a layer. Concrete or asphalt slabs may be used at the bottom of such a layer, provided they are placed horizontally. In locations where embankments are to be constructed on hillsides or against existing embankments with slopes steeper than 1 vertical on 3 horizontal, the slopes shall be benched. Required benches shall be constructed as shown on the Standard Sheet Earthwork Transition and Benching Details . Where old pavement is encountered within 2 ft. of the top of the subbase course, it shall be broken up or scarified.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Compaction
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 for soil compaction purposes and equipment which is not in proper working order in all respects shall not be approved or used. The Engineer will also withhold approval of any compactor for which the Contractor cannot furnish manufacturer's specifications c overing data not obvious from a visual inspection of the equipment and necessary to determine its classification. The term, “pass,” for any type of compactor, shall denote one direct vertical application of compactor effort over all elemental areas of a lift surface. Terms in common parlance, such as “coverage,” “trips,” etc., have no significance, equivalence, or app lication under these specifications. TABLE 203 -1 PNEUMATIC -TIRED COMPACTOR CLASSIFICATIONS Pneumatic Compactor Class Tire Requirements Range of Ballasted Wheel Loads (lbs. per Wheel) Tire Size No. Plys Inflation Pressure (psi) A 7.50 x 15 4 35 2,000 – 3,000 B 7.50 x 15 6 60* 2,000 – 4,000 10 90* C 7.50 x 15 14 130* 2,000 – 4,000 D 9.00 x 20 10 75* 4,000 – 6,000 12 90* E 11.00 x 20 12 90* 6,000 – 8,000 18 F 13.00 x 24 18 100* 8,000 – 10,000 * Inflation pressure for not less than the last two passes on each lift. May be reduced during earlier passes and gradually increased to this level.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The minimum effort for all pneumatic compactors shall be 6 passes, at speeds up to 12 ft./sec on no more than the first 2 passes, and all subsequent passes at speeds of 6 ft./sec. or less.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The unsprung drum weight is the static weight of the drum and appurtenances without any reaction transmitted to the drum from the main chassis of the compactor. The dynamic force produced is dependent on the frequency of vibration, and therefore, CFR ratings shall be determined for the actual operating frequency of the compactor. Approval for vibratory compactors shall be confined, however, to equipment operating at not less than 1100 vpm, nor more than 1500 vpm, and those where the actual dynamic force at the actual o perating frequency is at least 2.5 times the unsprung drum weight. Conversion of manufacturer's published ratings, at a given frequency, shall be made with the following equation: 2 1 2)()( VVF = F where: 1F = Dynamic Force at Rated Frequency 2F = Dynamic Force at Operating Frequency 1V = Rated Frequency 2V = Operating Frequency For the lift thickness selected by the Contractor, the minimum CFR rating and minimum effort on such a lift, shall be as shown in Figures 203 -2B&C, respectively. Non -Centrifugal (Vertical force only) types of vibratory compactors shall be approved as above , less 175 lbs./in. before using Figures 203 -2 B&C as a minimum number of passes at a single specified speed. An equivalent effort, relating varying numbers of passes to other speeds is given by the equation: Speed X = (Specified Speed) (Min. Passes at Speed X) (Specified Min. Passes) The Contractor may choose to alter the specified minimum pass requirement, provided that speed is adjusted to the value given by this equation and does not exceed 6 ft./sec.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Where vibratory compactors are used on a project, the Contractor shall furnish for the exclusive use of the Engineer, one vibrating reed tachometer per project, plus one additional tachometer for each group of two vibratory compactors in excess of two per project. Tachometers shall have a frequency range adequate to cover operating frequencies of all vibratory compactors used on the project and shall have scale divisions of 50 vpm or less. Tachometers may be placed on the ground surface near the compactor w hen making readings, or with suitable damping materials interposed, placed directly on the compactor drum frame. The dispensations permitted under this specification for vibratory compactors are contingent upon proper operation of the equipment at all times during compaction operations. In any instance where the Engineer encounters any problems with operators rolling without vibration, for any reason, and immediate and effective corrective action is not taken by the Contractor, the Engineer will halt the work until the problem is resolved. If continuing problems of this nature occur, the Engineer may suspend all provi sions of this subparagraph
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 and consider the vibratory compactors as smooth steel wheel rollers classified according to their gross weight.
203-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 blending in a dry material or manipulation alone, to increase the rate of evaporation. Increased loose lift thickness caused by blending in a dry material, however, may necessitate a change in compaction equipment and/or methods to meet the minimum provisi ons of subparagraph 2. Compaction Equipment of this subsection.
203-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. The general description of the subgrade soils.
203-3.04 Select Borrow. The management of a select borrow source and the acceptability of all select
borrow material shall be in conformance with §203 -3.01F. Borrow . Underwater areas shall be filled with select borrow to 2 ft. above the water surface at the time of placement and in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents. All select borrow placed within the limits of Embankment or the Subgrade Area shall be placed in conformance with §203 -3.03B. Embankments or §203 -3.01G. Subgrade Area respectively, as appropriate, or where used for fill or backfill at structures, culverts and pipes, in conformance with §203 -3.06 Select Granular Fill and §203 -3.17 Select Structural Fill.
203-3.05 Select Fill. Underwater areas shall be filled with select fill to 2 ft. above the water surface at the
time of placement and in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents. All select fill placed within the limits of Embankment or the Subgrade Area shall be placed in conformance with §203 -3.03B. Embankments or §203 -3.01G. Subgrade Area respectively, as appropriate, or where used for fill or backfill at structures, culverts and pipes, in conformance with §203 -3.06 Select Granular Fill and §203 -3.17 Select Structural Fill.
203-3.06 Select Granular Fill . The type of material to be used in bedding, filling and backfill at
culverts, pipes, conduit and direct burial cable shall be in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents. Do not use RAP. Do not use slabs or pieces of either concrete or asphalt.
203-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Fill or backfill material at culverts and pipes shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required. When placing fill or backfill around culverts and pipes, layers shall be deposited to progressively bury the pipe or culvert to equal depths on both sides. The limits to which this su bsection will apply shall be in accorda nce with the Standard Sheets or as modified in the contract documents. Fill or backfill for conduit or cable placed in a trench shall be carefully placed in a horizontal layer to a depth of 6 in. over the top of the conduit or cable. This layer of material shall not be compacted, however, the remaining portion of the trench s hall be backfilled in accordance with the preceding paragraph. Where cables or conduits are placed and backfilled by a machine in one operation, the above requirements for backfilling do not apply. Where sheeting has been used for the excavation, and incremental removal of sheeting is not specified in the contract documents, sheeting shall be pulled when the trench has been backfilled to the maximum unsupported trench depth allowed by 29 CFR 1926.
203-3.07 Select Granular Fill Slope Protection . The Contractor shall perform the excavation in
accordance with the requirements for “Unclassified Excavation and Disposal” as described elsewhere in these specifications. The Contractor shall then spread material conforming to the requirements given in §733-12 Select Granular Slope Protection , in one layer to its full thickness by a method approved by the Engineer. The work shall be performed where shown in the contract documents or where directed by the Engineer in accordance with the Standard Sheets, and details shown on the contract documents. Compaction of the slope protection is not required. Slope Protection shall be either of two types, as described below:
203-3.08 Surface Settlement Gauges . Surface settlement gauges shall be constructed, installed, and
maintained where shown in the contract documents and in accordance with the details contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ” covering construction, installation, maintenance, and abandonment of these devices. Where surface settlement gauges are called for, it will be the Contractor's option to install pipe gauges or manometer gauges, unless a definite type is specified in the contract documents. Surface settlement gauges will be accepted for conformance with th e specification requirements on the basis of an inspection of the installation by the Departmental Geotechnical Engineer.
203-3.09 Settlement Rods . Settlement rods shall be constructed, installed, and maintained where shown
in the contract documents and in accordance with the details contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ” covering construction, installation, maintenance, and abandonment of these devices. Settlement rods will be accepted for conformance with the specification requirements on the basis of an inspection of the installation by the Departmental Geotechnical Engineer.
203-3.10 Piezometers . Piezometers shall be constructed, installed, and maintained at the locations shown
in the contract documents and in accordance with the detailed drawings included in the contract documents.
203-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 203-3.11 Applying Water . None Specified.
203-3.12 Select Granular Subgrade . The type of material to be used in fill or backfill of undercuts shall
be in conformance with the details shown in the contract documents or as ordered by the Engineer. Fill or backfill material shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required.
203-3.13 Select Structural Fill . The type of material to be used in bedding, filling and backfill at
structures shall be in conformance with the details shown on the appropriate Standard Sheet or as noted in the contract documents or as ordered by the Engineer. Do not use RAP. Do not us e slabs or pieces of either concrete or asphalt. Fill or backfill material at structures shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required. When filling behind abutments and similar structures, all material shall be placed and compacted in front of the walls prior to placing fill behind the walls to a higher elevation. Th e limits to which this subsection will apply shall be in accordance with the Standard Sheets or as modified in the contract documents. Where sheeting has been used for the excavation, and incremental removal of sheeting is not specified in the contract documents, sheeting shall be pulled when the trench has been backfilled to the maximum unsupported trench depth allowed by 29 CFR 1926.
203-3.14 Sand Backfill . The type of material to be used in bedding and filling shall be in conformance
with the details shown in the contract documents or as ordered by the Engineer. Bedding or fill material shall be deposited in horizontal layers not exceeding 6 in. in thickness prior to compaction. Compaction of each layer shall be as specified under §203 -3.03C. Compaction . A minimum of 95% of Standard Proctor Maximum Density will be required.
203-4 Method of Measurement . T..
203-4.01 General. Quantities for all items of work with payment units in cubic yards will be computed
from payment lines shown in the contract documents. Work performed beyond any designated payment line, including any offset required for the construction of presplit rock slopes in lifts, will not be included in the computation of quantities for the item involved. For any item paid for in its final position, no additional quantity will be measured for payment to make up losses due to foundation settlement, compaction, erosion or any other cause. Cross -sectioning, for the purpose of determining quantities for payment, will be employed only where payment lines are not shown in the contract documents or Standard Sheets, and cannot be reasonably established by the Engineer. Quantities for benching will be computed for payment from the details and instructions shown on the Standard Sheet Earthwork Transition and Benching Details . The excavation of unsuitable materials designated as topsoil under Section 713 Topsoil , will be included in the quantity measured for the appropriate unclassified excavation item, without distinction. . Where the item, “Embankment in Place,” is designated for the project by the proposal, all borrow of ordinary suitable materials shall be incidental to the work of that item.
203-4.02 Unclassified Excavation and Disposal. Unclassified excavation and disposal will be measured
in cubic yards, measured to the nearest whole cubic yard, computed in the original position for all excavation within right -of-way limits. No deduction shall be made for any pipes, culverts, structure s, or other obstructions, unless these are measured for payment under another contract item. Excavation for
203-4 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 borrow of suitable materials for embankment construction, shall not be included in the computation for this work.
203-4.03 Embankment in Place. Embankment in place will be measured in cubic yards, measured to the
nearest whole cubic yard, computed in the final compacted position. Any additional quantity of material required to compensate for embankment settlement shall not be included in the measurement of this item. The quantities of embankment will exclude the total volume of pipes, culve rts, other roadway items, and granular backfill within the payment lines for such granular backfill.
203-4.04 Select Borrow. Select borrow will be measured in cubic yards, measured to the nearest whole
cubic yard, computed in the original position.
203-4.05 Select Fill. Select fill will be measured in cubic yards, measured to the nearest whole cubic
yard, computed in the final compacted position.
203-4.06 Select Granular Fill . Select granular fill will be measured in cubic yards, measured to the
nearest whole cubic yard, computed in the final compacted position. A deduction shall be made for pipes (based on nominal diameters) and other payment items when the combined cross -sectional area exceeds 1 ft2 unless otherwise shown in the contract documents. No deduction will be made for the cross -sectional area of an existing facility.
203-4.07 Select Granular Fill Slope Protection . Select granular fill slope protection will be measured
in cubic yards, measured to the nearest whole cubic yard, computed in the final position.
203-4.08 Surface Settlement Gauges . Surface settlement gauges will be measured by the number of
devices satisfactorily installed.
203-4.09 Settlement Rods . Settlement rods will be measured by the number of devices satisfactorily
installed.
203-4.10 Piezometers . Piezometers will be measured by the number of devices satisfactorily installed.
203-4.11 Applying Water . The unit of measurement of water will be one pressure distributor per
calendar day, denoted hereafter as one p.d.d., for dust control. Where the Contractor works in more than one separate and distinct shift per calendar day, each shift shall be considered as one p.d.d. A single shift plus overtime work, however, shall be considered as one p.d.d. The quantity thus determined shall be applied directly as the quantity to be paid for where the distributors used have a capacity of 3,000 gal. or less. Provided that the Engineer determines that the total operating distributor capacity (number and sizes of all distributors) employed is reasonably commensurate with the needs for water application, additional payment will be allowed for distributors exceedi ng 3,000 gal. in capacity as follows: Distributor Capacity Pressure Distributor per Calendar Day Adjustment 3,000 gal. < distributor capacity < 5,000 gal. p.d.d.'s will be multiplied by 1.5 5,000 gal. ≤ distributor capacity p.d.d.’s will be multiplied by 2.0 No additional quantity shall be measured for payment for compaction purposes.
203-4 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 203-4.12 Select Granular Subgrade . Select granular subgrade will be measured in cubic yards, measured to the nearest whole cubic yard, computed in the final compacted position.
203-4.13 Select Structural Fill . Select structural fill will be measured in cubic yards, measured to the
nearest whole cubic yard, in the final compacted position. A deduction shall be made for pipes (based on nominal diameters) and other payment items when the combined cross -sectional a rea exceeds 1 ft2 unless otherwise shown in the contract documents. No deduction will be made for the cross -sectional area of an existing facility.
203-4.14 Sand Backfill . Sand backfill will be measured in cubic yards, measured to the nearest whole
cubic yard, in the final compacted position. A deduction shall be made for pipes (based on nominal diameters) and other payment items when the combined cross -sectional area exceed s 1 ft2 unless otherwise shown in the contract documents. No deduction will be made for the cross -sectional area of an existing facility.
203-5 Basis of Payment . T
203-5.01 General -All Items. The unit price bid shall include the cost of furnishing all labor, materials,
and equipment as necessary to complete the work, except where specific costs are designated or included in another pay item of work. Incidental costs, such as acquisition of bo rrow pits or material outside of the right -of-way, rock drilling and blasting, compaction and special test requirements, stockpiling and re - handling of materials, precautionary measures to protect private property and utilities, to form and trim graded surfaces, proof rolling, re -proof rolling, corrective work disclosed by proof rolling and any delays caused by this corrective work, shall be included in the unit price of the pay item where such costs are incurred. The exception is that corrective work ordered in cut sections based on an evaluation of proof rolling will be paid for under the appropriate excavation and backfill items. Quantities for any additional items of work or substitution of material in accordance with the approved Winter Earthwork submittal shall be furnished at no cost to the State.
203-5.02 Unclassified Excavation and Disposal. The provisions of § 203-5.01 General -All Items apply
including the following: The unit price bid shall cover all costs of required excavation within the right of way limits, and all costs of disposal if the excavated materials are not used under another pay item.
203-5.03 Embankment In Place. The provisions of § 203-5.01 General -All Items apply.
203-5.04 Select Borrow. The provisions of § 203-5.01 General -All Items apply.
203-5.05 Select Fill. The provisions of § 203-5.01 General -All Items apply.
203-5.06 Select Granular Fill . The provisions of § 203-5.01 General -All Items apply.
203-5.07 Select Granular Fill Slope Protection . The provisions of § 203-5.01 General -All Items apply.
203-5.08 Surface Settlement Gauges . The provisions of § 203-5.01 General -All Items apply including
the following: The unit price bid shall cover all costs of providing, installing and maintaining each device, including excavation, trenching and backfill during the course of the work. No payment will be made under any other item of the contract for any work associated with these items. When each installation is completed, 75% of the item unit price will be paid. The remaining 25% will be paid when each device has been properly maintained and is abandoned according to the procedures
203-5 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ”. Unless otherwise specified in the proposal, the unit price shall also include the costs of removal.
203-5.09 Settlement Rods . The provisions of § 203-5.01 General -All Items apply including the
following: The unit price bid shall cover all costs of providing, installing and maintaining each device, including excavation, trenching and backfill during the course of the work. No payment will be made under any other item of the contract for any work associated with these items. When each installation is completed, 75% of the item unit price will be paid. The remaining 25% will be paid when each device has been properly maintained and is abandoned according to the procedures contained in the geotechnical control procedure “ Settlement Gauges and Settlement Rods ”. Unless otherwise specified in the proposal, the unit price shall also include the costs of removal.
203-5.10 Piezometers . The provisions of § 203-5.01 General -All Items apply including the following:
The unit price bid shall cover all costs of providing, installing and maintaining each device, including excavation, trenching and backfill during the course of the work. No payment will be made under any other item of the contract for any work associated with these items. When each installation is completed and the device placed in satisfactory operation, 75% of the unit price will be paid. The remaining 25% will be paid when all earthmoving and slope work is completed in the vicinity of each installation. Any installation rendered inoperative due to damage by construction equipment after partial or full payment, shall be immediately repaired or the full amount of such payment shall be deducted from other monies due the Contractor under the contract.
203-5.11 Applying Water . The unit price bid per one operating pressure distributor per calendar day for
applying water shall include the costs of furnishing all labor, material and equipment necessary for dust control.
203-5.12 Select Granular Subgrade . The provisions of § 203-5.01 General -All Items apply.
203-5.13 Select Structural Fill . The provisions of § 203-5.01 General -All Items apply.
203-5.14 Sand Backfill . The provisions of § 203-5.01 General -All Items apply.
Payment will be made under: Item No. Item Pay Unit 203.02 Unclassified Excavation and Disposal Cubic Yards 203.03 Embankment In Place Cubic Yards 203.05 Select Borrow Cubic Yards 203.06 Select Fill Cubic Yards 203.07 Select Granular Fill Cubic Yards 203.0801 Select Granular Fill, Slope Protection - Type A Cubic Yards 203.0802 Select Granular Fill, Slope Protection - Type B Cubic Yards 203.10 Surface Settlement Gauges Each 203.12 Settlement Rods Each 203.13 Piezometers Each 203.1601 Applying Water P.D.D. 203.20 Select Granular Subgrade Cubic Yards 203.21 Select Structural Fill Cubic Yards 203.25 Sand Backfill Cubic Yards
204-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 204 - FLOWABLE FILL
204-1 DESCRIPTION. The work shall consist of mixing and placing flowable fill at the locations
shown in the contract documents.
204-1.01 Controlled Low Strength Material. Controlled Low Strength Material (CLSM) is an
acceptable alternative to compacted soil backfill in confined spaces. CLSM consists of cement, water and, at the Contractor’s option, fly ash, aggregate or chemical admixtures in any proportions such that the f inal product meets the strength and flow consistency requirements included in the specification. The mix is proportioned to be self leveling and does not require compaction. It is much lower in strength than concrete, making future excavation possible.
204-1.02 Lightweight Concrete Fill. Lightweight Concrete Fill is an engineered geotechnical material
with a unique strength / density relationship which can be used to reduce loads on soft foundation soils, buried structures, or against retaining walls. Lightweight Concrete Fill consists of a Portland cement matrix containing uniformly distributed, non -interconnected air voids introduced by a foaming agent. The flowability and cementitious properties provide a product that is self leveling and does not require compaction.
204-2 Materials .
204-2.01 Controlled Low Strength Material. Provide backfill material meeting the requirements for
CLSM as stated in §733 -01 Flowable Fill .
204-2.02 Lightweight Concrete Fill. Provide backfill material meeting the requirements for
Lightweight Concrete Fill as stated in §733 -01 Flowable Fill .
204-3 Construction Details .
204-3.01 Controlled Low Strength Material.
204-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 If the CLSM is to be placed via pumps, the placement sequence shall be such that the equipment is able to access the entire volume to be filled without separating the mixture. Keep CLSM encapsulated with soil or protected by other means so as to prevent erosion and environmental degradation.
204-3.02 Lightweight Concrete Fill.
204-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 materials to accurate proportions, either by volume or by weight, so that when the materials are incorporated in the mix, a thorough and uniform mix will result. Locate equipment such that the mixed product is capable of being pumped into place properly.
204-4 Method of Measurement .
204-4.01 Controlled Low Strength Material. CLSM will be measured for payment in cubic yards
measured to the nearest 0.1 cubic yard computed from the payment lines shown on the contract documents. A deduction will be made for pipes (based on nominal diameters) and other features when the combined cross -sectional area exceeds 1 ft2. No additional quantity shall be measured for payment to make up losses due to foundation settlement, compaction, erosion or any other cause.
204-4 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Cross sectioning, for the purpose of determining quantities for payment, will be employed only where payment lines are not shown on the contract documents or Standard Sheets, and cannot be reasonably established by the Engineer.
204-4.02 Lightweight Concrete Fill. Lightweight Concrete Fill will be measured for payment in cubic
yards measured to the nearest 0.1 cubic yard computed from the payment lines shown on the contract documents.
204-5 Basis of Payment
204-5.01 Controlled Low Strength Material. The unit price bid shall include the costs of all labor,
material, and equipment necessary to satisfactorily complete the work.
204-5.02 Lightweight Concrete Fill. The unit bid price shall include the cost of all labor, materials, and
equipment necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 204.01 Controlled Low Strength Material (CLSM) Cubic Yard 204.02 Controlled Low Strength Material (CLSM) (No Fly Ash) Cubic Yard 204.03 Lightweight Concrete Fill (Type A) Cubic Yard 204.04 Lightweight Concrete Fill (Type B) Cubic Yard SECTION 205 - CONTAMINATED SOIL (Last Revised January 2019)
205-1 Description .
205-1.01 General. Soil contamination may include:
205-1.02 Segregation and Storage. This work shall consist of segregating contaminated soil from non -
contaminated soil during excavation, and the temporary storage and management of contaminated soil (pending sampling, analysis and ultimate disposition) in accordance with an accepted Cont aminated Material Handling Plan.
205-1 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-1.03 Field Organic Vapor Monitoring. This work shall consist of screening soil for contamination during excavation using field vapor monitoring equipment and observations. This work shall be performed by an independent firm hired by the Contractor and completed in accordance with an accepted Field Organic Vapor Monitoring Plan.
205-1.04 Sampling and Analysis. This work shall consist of collecting soil samples and arranging for
samples to be analyzed at a laboratory in accordance with an accepted Sampling Plan. The laboratory shall be accredited for the specified parameters by the New York State Department o f Health (NYSDOH) under the Environmental Laboratory Approval Program (ELAP). The results of the laboratory analysis will determine or confirm the final regulatory classification of the soil for appropriate handling, transpo rtation, treatment and disposal methods and requirements.
205-1.05 Transportation and Disposal. This work shall consist of transporting and disposing of
contaminated soil, and completing any other related activities, in accordance with an accepted Disposal Plan. For shipping and disposal purposes, the regulatory classification of the soil (as eithe r contaminated non-hazardous industrial waste or RCRA regulated hazardous waste) will be based on investigations conducted prior to award or based on the results of laboratory analysis included in this section.
205-1.06 Reuse of Contaminated Soil. This work shall consist of the reuse of contaminated soil within
the contract limits as embankment, fill or other appropriate on -site use. Contaminated soil areas and reuse locations, if provided , are indicated in the contract documents or shall be determined and approved by the Department. The reuse of contaminated soil may be deemed appropriate based upon the following a) an investigation conducted prior to the contract award and/or sampling and analysis conducted during project construction and the q ualification of the soil placement as a generic beneficial use determination (BUD) or b) as a site specific BUD obtained from the NYSDEC. The material must be considered suitable material as per Section 203.
205-2 Materials .
205-2.01 General. As per the Contaminated Material Handling Plan, (Section 205 -1.02).
205-2.02 Segregation and Storage. None Specified.
205-2.03 Field Organic Vapor Monitoring. Field organic vapor monitoring shall be conducted using a
photoionization detector (PID) with a 10.2eV or higher ultraviolet lamp. The PID shall have a minimum detection range of 0.1 ppm to 2,000 ppm and shall be calibrated with isobutylene or other appr opriate calibration gas. A flame ionization detector (FID) may be used in lieu of a PID if a written request and justification is submitted by the Contractor and approved by the Department. The FID shall have a minimum detection range of 1.0 ppm to 50,000 ppm and shall be calibrat ed with appropriate calibration gas.
205-2.04 Sampling and Analysis. None Specified.
205-2.05 Transportation and Disposal. None Specified.
205-2.06 Reuse of Contaminated Soil. None Specified.
205-3 Construction Details .
205-3.01 General. Work activities shall be performed in accordance with the contract documents and with
applicable Contaminated Material Handling Plan, Field Organic Vapor Monitoring Plan, Sampling Plan
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 and/or Disposal Plan. The Contractor shall initiate any measures necessary to protect the safety and health of workers and the general public based on the potential hazards associated with the contaminated soil.
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 g. Describe how potential air quality impacts such creation of dust particulates and vapors will be minimized to protect air quality within, adjacent to or downwind from the project.
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 b. Name, address, telephone number, and ELAP certification number of the proposed NYSDOH ELAP accredited laboratory;
205-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (2) Name, address, experience and qualifications of each individual who will collect soil samples. Each individual shall be thoroughly trained in sampling protocols, handling and chain of custody procedures, and laboratory requirements.
205-3.02 Segregation and Storage. The Contractor shall have an accepted CMHP prior to commencing
work within potentially contaminated soil areas. Contaminated soil areas are identified in the contract documents. Soil determined to be contaminated (by PID/FID screening or observation) sha ll be segregated from non -contaminated soil and stored pending sampling, analysis and disposal. If feasible, soil with significantly higher PID/FID head space readings and soil exhibiting unusual visual or odor characteristics shall be segregated from othe r contaminated soil. The Contractor shall notify the Engineer immediately if soil is discovered that appears to contain unknown contaminants or soil that varies significantly from the type of contamination identified in the contract documents. The Departme nt will determine the preliminary regulatory classification of the suspect soil and will determine how the soil is to be managed. The Contractor shall not store contaminated soil for more than 40 calendar days, with this time limit beginning on the first day soil is placed in a stockpile, truck -bed or roll -off container. If the Engineer approves additional storage time for soil deter mined to be contaminated non -hazardous industrial waste, the Contractor shall also request approval from NYSDEC for any storage greater than 60 calendar days. If the Engineer approves additional storage time for soil determined to be RCRA regulated hazard ous waste, the Contractor shall also obtain approval from NYSDEC for any storage greater than 90 calendar days. Contaminated soil may be placed in stockpiles, trucks or roll -off containers as follows:
205-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 d. Stockpile locations shall be within the right -of-way and accepted by the Engineer prior to use.
205-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-3.03 Field Organic Vapor Monitoring. The Contractor shall hire an independent firm to perform field organic vapor monitoring in accordance with the accepted FOVMP. The individual conducting the monitoring, hereafter referred to as the Field Monitor, shall be experienced and thoroughly train ed in sampling protocols, organic vapor monitoring procedures, and equipment calibration procedures. The Field Monitor shall screen potentially contaminated soil during excavation using field vapor monitoring equipment (PID/FID) and visual observations. Ba sed on the screening results, the Field Monitor shall direct the Contractor on the proper segregation of the material. Field organic vapor monitoring shall be conducted when working in the contaminated soil areas identified in the contract documents, or whenever unusual or suspicious soil conditions based on visual or odor evidence are encountered during excavation. The Co ntractor or Field Monitor shall notify the Engineer immediately if soil is discovered that appears to contain unknown contaminants or soil that varies significantly from the type of contamination identified in the contract documents. (For health and safety reasons, personnel shall not evaluate odor by placing soil directly to the nose or by inhaling vapors from grab or bag samples). The Field Monitor shall calibrate the PID/FID on a daily basis prior to starting field work and shall determine a background measurement. Excavated soil shall be tested with the PID/FID at intervals that will ensure the soil is being properly assessed for contamination. The PID/FID will be used to take head space readings from bag samples with the soil temperature at least 50OF. The Field Monitor shall maintain detailed and legible field notes indicating work locations, nature of work being performed, PID/FID head space readings, time of readings, pertinent measurements, visual and odor observations, quantities of both contaminated and non -contaminated soils excavated at each location, storage/stockpile locations, work hours, weather conditions, and any un usual conditions encountered. The Contractor shall provide the Engineer with a copy of all field notes within 5 work days from their recording. The segregation threshold established below (25ppm) is based on gasoline being the predominant contaminant. If a different contaminant(s) is present or suspected, a different segregation threshold may need to be established. Alternative segregation thresho lds may be designated in the contract documents. PID/FIDs detect and measure gas concentrations (specifically volatile organic compounds); they do not quantify or identify the contaminants in the soil. Therefore, PID/FID readings can not determine specific contaminant concentrations within the soil. Segregate soil as follows:
205-3.04 Sampling and Analysis. The Contractor shall have an accepted Sampling Plan prior to
commencing work within potentially contaminated areas. Sampling shall be conducted by individuals thoroughly trained in sampling protocols, handling and chain of custody procedures, and laborat ory requirements. Accepted sampling practices shall be used to obtain representative composite sample(s) and/or grab sample(s) as required for the specific analyses to be completed. Representative samples shall be collected from stored soil as soon as pos sible after excavation. Soil shall be taken from a depth greater than one foot within the stockpile. Each composite sample shall include a minimum of four sample
205-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 points. Grab samples shall be collected in a manner so as to best characterize the extent of contamination of the soil in question and best characterize the extent of contamination of the pile. If any soil areas are present with field indications of cont amination discretely different than the other areas (i.e., significantly elevated PID/FID readings, staining, etc.), the area may require a separate sample and the Engineer shall be alerted to approve additional sample and analysis. Analyses shall be com pleted at a NYSDOH ELAP accredited laboratory that is certified to perform the required tests. Analyses shall be completed within 10 work days of sample collection. The Contractor shall provide the Engineer with a copy of all reports within 2 work days of their receipt from the laboratory. Soil shall not be added to any stockpile, truck or roll -off container after its contents have been sampled. If soil is added after sampling, or sampled soil is otherwise tampered with, the Contractor shall re-sample the soil at no additional cost to the St ate. Conduct specified analyses as follows:
205-3.05 Transportation and Disposal. The Contractor shall have an accepted Disposal Plan prior to
the transportation and disposal of contaminated soil. Contaminated soil shall not be transported until all sampling and analysis, as required by the Department or by the Disposal facility, hav e been performed and laboratory reports have been provided and accepted by the Department.
205-3.06 Reuse of Contaminated Soil. The Contractor shall place contaminated soil as embankment, fill
or other appropriate on -site use as determined and approved by the Department, and in accordance with the contract documents. Only appropriate soils placed in appropriate locations as incl uded in the contract documents shall be reused.
205-4 Method of Measurement.
205-4.01 General. (Vacant)
205-4 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-4.02 Segregation and Storage. The work under segregation and storage will be measured for payment on a lump sum basis.
205-4.03 Field Organic Vapor Monitoring. The quantity for payment will be in hours of field organic
vapor monitoring performed, measured to the nearest one -half hour.
205-4.04 Sampling and Analysis. The quantity to be measured for payment will be the number of soil
samples analyzed as included in the contract documents.
205-4.05 Transportation and Disposal. The quantity to be measured for payment will be in tons of
contaminated soil transported to a disposal/treatment facility, measured to the nearest 0.1 ton. If measurement of the contaminated soil by weight is not feasible, a conversion factor of 1.4 ton s per cubic yard will be used to determine the quantity for payment.
205-4.06 Reuse of Contaminated Soil. The quantity to be measured for payment will be in cubic yards
of contaminated soil stockpiled for reuse, computed to the nearest whole cubic yard.
205-5 BASIS OF PAYMENT. The price bid shall include the cost of all labor, materials and equipment
necessary to complete the work. Excavation will be paid for separately. Payment will be made under: Item No. Item Pay Unit 205.02nn Segregation and Storage of Contaminated Soil Lump Sum 205.03 Field Organic Vapor Monitoring of Contaminated Soil Hour 205.0401 Petroleum Contamination Parameter Analysis Each 205.0402 Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic Each 205.0403 Laboratory Analysis for Ignitability Each 205.0404 Laboratory Analysis for ph Each 205.0405 Laboratory Analysis for Polychlorinated Biphenyls (PCB's) Each 205.0406 Laboratory Analysis for Total Petroleum Hydrocarbons – Gasoline Range Organics Each 205.0407 Laboratory Analysis for Total Petroleum Hydrocarbons – Diesel Range Organics Each 205.0501nn Disposal of Contaminated Hazardous Waste Soil Ton 205.0502nn Disposal of Contaminated Non -Hazardous Waste Soil Ton 205.06nn Reuse of Contaminated Soil Cubic Yard Note: nn denotes serialized pay item for each discrete contaminated area of property as indicated on the plans. The serialized items allow for different plans and different disposal procedures for discretely different areas and nature of the contamination. SECTION 206 - TRENCH, CULVERT AND STRUCTURE EXCAVATION
206-1 Description .
206-1.01 General. This work shall consist of the excavation and disposal of excavated material required
for trenches, culverts, structures, conduit and direct burial cable not otherwise provided for in other sections of these specifications. All such excavation shall be unc lassified excavation as defined in §203 - 1.01. The work shall be conducted in accordance with 29 CFR 1926 Subpart P.
206-1.02 Structure Excavation. The work specified under this item shall include the excavation for all
bridge foundations, walls and other major structures.
206-1 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 206-1.03 Trench and Culvert Excavation. The work specified under this item shall include the excavation of all materials and disposal of excavated material required for trenches, culverts, pipes, manholes, drainage structures and other minor structures, conduit and direct burial cable.
206-1.04 Conduit Excavation and Backfill including Surface Restoration. The work specified under
this item shall include the excavation, necessary backfill and surface restoration required for conduits and direct burial cables.
206-1.05 Test Pits. The work specified under this item shall include the excavation and backfill of test
pits at locations shown in the contract documents, or as directed by the Engineer. Excavation and backfill methods, limits and equipment used shall be approved by the Engi neer. This work will not relieve the contractor of the responsibility to locate underground facilities as required under 16 NYCRR 753.
206-2 MATERIALS. (Not Specified).
206-3 Construction Details .
206-3.01 General. The appropriate construction details specified for “Excavation and Embankment” in
§203 -3.01 through §203 -3.14 shall apply to the work specified in this section. The excavation shall be dewatered and kept free from water, snow and ice when necessary. Special care shall be taken not to disturb the bottom of the excavation, and not to remove the material at final grade until just before the structure is placed. The provisions of §203 -3.01D Suitable Materials and/or §203 -3.01E Unsuitable Materials shall apply to all material excavated under this section. The Contractor shall carry out all excavation operations in a safe and prudent manner so that the workers, the public, and adjacent public and private property will be protected from unreasonable hazard in accordance with §107 -05K. Open Excavations and Trenches. Slopes may not be steeper than allowed by 29 CFR 1926 Subpart P. When excavation is required for the installation of conduit or direct burial cable, the Contractor shall notify the Engineer upon completion of the excavation. No conduit or cable shall be placed in the excavation until the Engineer has approved the depth and cross -section. When the Contractor, in placing conduits, direct burial cable or utilities, excavates into the pavement, subgrade, subbase, or shoulder courses, such courses must be replaced in kind, character and condition, to maintain a uniform road section, except when the Contract Documents specify that other materials shall be used.
206-3.02 Structure Excavation. The Contractor’s competent person shall verify field conditions,
including excavation depth, groundwater, and soil conditions with the Engineer in accordance with 29 CFR 1926 Subpart P prior to performing structure excavation for all bridge foundations, wa lls and other major structures.
206-3.03 Trench and Culvert Excavation. The Contractor’s competent person shall verify field
conditions, including excavation depth, groundwater, and soil conditions with the Engineer in accordance with 29 CFR 1926 Subpart P prior to performing trench and culvert excavation. For utility lines, exclusive of conduit and cable lines, of less than 12 inches in diameter, the excavation width shall be the actual bottom width necessary to properly perform the installation work required, or 3 feet, whichever is less.
206-3.04 Conduit Excavation and Backfill including Surface Restoration. When the Contractor is
required to excavate through portland cement concrete, asphalt concrete, composite pavement, or
206-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 sidewalk, a saw cut shall be made along neat lines and to the depth as shown in the contract documents or as directed by the Engineer. Any damage to existing pavement, sidewalk, curb or other facilities caused by the Contractor’s operations under this item shall be repaired by the Contractor at no additional cost to the State.
206-3.05 Test Pits. The Contractor shall excavate and backfill test pits in order to determine existing
underground utility type, size and/or condition where new utility connections to existing facilities are proposed. The Contractor shall excavate and backfill test pits in a manner approved by the Engineer that prevents damage to wrappin gs, coatings or other protective coverings, such as by hand digging, vacuum excavation or similar non -destructive locating equipment. The limits of the excavation shall be those sufficient to determine existing utility type, size and/or condition.
206-4 Method of Measurement .
206-4.01 General. The quantity of excavation will be in cubic yards, to the nearest whole cubic yard,
computed from payment lines shown on the plans or the appropriate standard sheets. Work performed beyond any designated payment line will not be included in the computation of quantities for the item involved.
206-4.02 Structure Excavation. Vacant.
206-4.03 Trench and Culvert Excavation. Unless otherwise shown or indicated on the contract plans,
payment lines for excavation of pipe and culvert lines, and minor structures will be determined as follows:
206-4.04 Conduit Excavation and Backfill including Surface Restoration. The quantity of conduit
and/or cable excavation and backfill including surface restoration for payment will be the number of
206-4 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 linear feet measured along the center of the conduit and/or cable placed, in accordance with the methods stated below. Wherever a pair or group of conduits and/or cables are physically connected together, they will be considered as a single conduit and/or cable.
206-4.05 Test Pits. The quantity to be measured for payment will be the number of test holes excavated
and backfilled in accordance with the contract documents.
206-5 Basis of Payment .
206-5.01 General. The cost for necessary guarding to protect the public from open trenches, and that
required for the protection to ensure the safety of the workers, and for any necessary excavation support shall be included in other items. No extra payment will be made for the cost of any materials excavated or placed outside the payment lines shown on the plans or as described in this specification. No extra payment will be made for excavation protection or support systems not shown in the contract plans, unless use of such systems is directed by the Engineer. With exception of the Conduit Excavation and Backfill including Surface Restoration item, the work of replacing pavement, subcourses and shoulder courses will be paid for and performed under the provisions of their respective items and subsections.
206-5.02 Structure Excavation. The unit price bid for this work shall include the cost of labor, materials
and equipment required to satisfactorily complete the work including the costs of excavation, disposal of excavated material, presplitting rock excavations where required, and keep ing the site dewatered and free from earth, water, ice and snow where necessary. Payment for Sheeting, Cofferdams or Temporary Water Diversion Structures required by the contract documents will be made in accordance with the appropriate item. Where cofferdams are specified for structure excavation, the work required to keep the site free from earth, water, ice and snow shall be included in the item for cofferdams when necessary.
206-5.03 Trench and Culvert Excavation. The unit price bid for this work shall include the cost of
labor, materials and equipment required to satisfactorily complete the work, including the costs of excavation, disposal of excavated material, presplitting rock excavations where required, and kee ping the site dewatered and free from earth, water, ice and snow when necessary.
206-5.04 Conduit Excavation and Backfill including Surface Restoration. The unit price bid for this
work shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily excavate and backfill the trench, including sawcutting, and to restore and replace any pavement, shoulder, and sidewalk cou rses, subcourses, curbs, drives, lawns and other top surfaces as required to complete the work.
206-5 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 206-5.05 Test Pits. The unit price bid for this work shall include the cost of furnishing all labor, materials and equipment necessary to satisfactorily excavate and backfill the test pit and replace any pavement, shoulder and sidewalk courses, subcourses, curbs, drives, lawn s and other top surfaces required to complete the work. Payment will be made under: Item No. Item Pay Unit 206.01 Structure Excavation Cubic Yard 206.0201 Trench and Culvert Excavation Cubic Yard 206.03 Conduit Excavation and Backfill including Surface Restoration Foot 206.05 Test Pit Excavation Each SECTION 207 - GEOSYNTHETICS
207-1 Description .
207-1.01 Geotextiles. The work shall consist of furnishing and installing approved Geotextile of the
Class and Type indicated, at the locations, and in the manner shown on the plans or as directed by the Engineer, in writing, prior to performing the work.
207-1.02 Geomembranes. The work shall consist of furnishing and installing approved Geomembrane ,
includ ing the preparation of the surface upon which the Geomembrane is placed, at the locations and in the manner shown on the plans or as directed by the Engineer, in writing, prior to performing the work.
207-1.03 Prefabricated Composite Drains for Structures. The work shall consist of furnishing and
installing an approved Prefabricated Composite Structural Drain (PCSD) or Prefabricated Composite Integral Abutment Drain (PCIAD) as specified at the location (s) shown on the contract documents or as directed by the Engineer, in writing, prior to performing the work. Prior to installation, the Contractor shall furnish the Engineer with copies of the manufacturer’s literature with details and installation requirements for the PCSD or PCIAD. If not included in the manufacturer’s literature, a letter identifying the geote xtile wrap shall also be provided to the Engineer.
207-2 MATERIALS. Materials shall meet the requirements specified in the following subsections of
Section 700 – Materials. Geotextiles §737 -01 Geotextile Bedding §737 -01 A. Geotextile Separation §737 -01 B. Geotextile Drainage §737 -01 C. Geotextile Slope Protection §737 -01 D. Geotextile Stabilization §737 -01 E. Turbidity Curtain §737 -01 F. Silt Fence §737 -01 G. Geomembranes §737 -02 Prefabricated Composite Structural Drains §737 -04 Prefabricated Composite Integral Abutment Drains §737 -05 Materials shall be subject to the Department’s Quality Assurance (QA) program outlined in Section 737.
207-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Adhesives used for joining geotextiles shall be fast -tacking, not be detrimental to the performance, lifespan or function of the geotextile, and c reate a bond strong enough to meet AASHTO M288 requirements for seam efficiency.
207-3 Construction Details .
207-3.01 Geotextiles .
207-3.02 Geomembranes. The Geomembrane shall be protected during transport and storage. The
surface upon which the Geomembrane is to be placed shall be within reasonable conformity to the proposed grade. Traffic or construction equipment will not be permitted directly on the Geo membrane. Care shall be exercised by workers when walking or working on the Geomembrane. Seams shall be sealed as per the manufacturer's recommendations and to the satisfaction of the Engineer. The edges of the Geomembrane shall be secured in the manner shown on the contract plans or as directed by the Engineer.
207-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Geomembrane which becomes torn or damaged shall be replaced or patched as ordered by the Engineer. The patch shall extend 3 ft. beyond the perimeter of the tear or damage and the seams shall be approved by the Engineer.
207-3.03 Prefabricated Composite Drains for Structures. The Contractor shall install the drain in
conformance with the manufacturer’s installation procedures. The drain shall be installed so that the backfill, when placed, will be in contact with the geotextile and forms a continuous drainage layer without interruption within the drain’s plane. In installations where concrete is to be poured against the prefabricated composite drain, only drains with impermeable cores will be allowed. At all locations, a positive outlet for the water in the drain shall be provided. This may involve making a hole in the core at the weep hole locations for approved drains with an impermeable core. Do not puncture the geotextile. Any damaged geotextile shall be repaired. Adhesive shall be applied to the wall surface, and not directly to the drain. During all periods of shipment and storage, the drain shall be wrapped and protected from direct exposure to sunlight, mud, dirt and debris. Care shall be exercised while backfilling to prevent damage to the drain. Repairs or replacements of drain damaged by construction operations shall be performed, as directed by the Engineer, at no cost to the State.
207-4 Method of Measurement .
207-4.01 Geotextiles .
207-4.02 Geomembranes. The quantity of Geomembrane will be the number of square yards c omputed
from the payment lines indicated in the contract documents. Measurement will not be made for Geomembranes used for repairs, seams, or overlaps.
207-4.03 Prefabricated Composite Drains for Structures. The quantity of PCSD or PCIAD will be
measured in square yards installed computed from the payment lines indicated in the contract documents.
207-5 Basis of Payment .
207-5.01 Geotextiles. The unit price bid shall include the cost of furnishing all labor, equipment, and
materials necessary to complete the work, including the cost of preparing the surface upon which the Geotextile is placed. No payment will be made for replacement or repairs.
207-5.02 Geomembranes. The unit price bid shall include the cost of furnishing all labor, materials, and
equipment necessary to satisfactorily complete the work, i ncluding the cost of preparing the surface upon which the Geomembrane is placed and securing the edges of the Geomembrane. No payment will be made for replacement or repairs.
207-5 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 207-5.03 Prefabricated Composite Drains for Structures. The unit price bid shall include the cost of furnishing all labor, equipment, and material necessary to complete the work. No payment will be made for repairs or replacement. Payment will be made under: Item No. Item Pay Unit 207.20 Geotextile Bedding Square Yard 207.21 Geotextile Separation Square Yard 207.22 Geotextile Drainage Square Yard 207.23 Geotextile Slope Protection Square Yard 207.24 Geotextile Stabilization Square Yard 207.25 Geomembrane Square Yard 207.26 Prefabricated Composite Structural Drain Square Yard 207.27 Prefabricated Composite Integral Abutment Drain Square Yard SECTION 208 - STORMWATER MANAGEMENT PRACTICES (Last Revised May 2022)
208-1 DESCRIPTION . The work shall include furnishing, installing, maintaining, and cleaning
stormwater management practices, in accordance with the contract documents and as directed by the Engineer.
208-1.01 General .
208-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 hydrocarbons, nutrients and/or metals collected by the practice.
208-1.02 SWTD. The work shall include furnishing, installing, and maintaining a SWTD, in accordance
with the contract documents and as directed by the Engineer.
208-1.03 Cleaning SWTD. The work shall include cleaning SWTDs in accordance with the contract
documents and as directed by the Engineer.
208-2 Materials.
208-2.01 General. None specified
208-2.02 SWTD. The materials shall meet the requirements of the following subsections of Section 700,
Materials and Manufacturing . Stormwater Treatment Device 738-01 The Contractor shall provide a SWTD that is:
208-2.03 Cleaning SWTD. None specified.
208-3 Construction Details.
208-3.01 General. The Contractor shall inspect and maintain the stormwater management practices for
the duration of the contract. The schedule for inspecting and maintaining each stormwater management practice shall be per the manufacturer’s recommendations to sustain prac tice performance and efficiency, and/or as indicated in the contract documents. Inspection and maintenance shall be included in the cost of the payment item. The Contractor shall keep a record of stormwater management practice inspections and maintenance. Stormwater management practices not performing to manufacturer’s defined efficiency standards shall be repaired or replaced at no additional cost to the Stat e.
208-3.02 SWTD . The Contractor shall install and maintain the SWTD in accordance with manufacturer
recommendations and the contract documents.
208-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Submittals . A minimum of two weeks prior to installation, the Contractor shall provide a copy of the manufacturer’s cut sheets, installation details, and operations and maintenance manuals for each SWTD unit type. Electronic copies are acceptable.
208-3.03 Cleaning SWTD. Cleaning shall be performed during dry weather. Entry into the SWTD or
nearby drainage structure may be necessary to complete the work described under this specification. SWTDs and other subsurface stormwater drainage devices are confined spaces. Entr y into confined spaces requires compliance with OSHA safety procedures (29 CFR 1910.146 and 29 CFR 1926.21) and NYS Industrial Code Rules 12 and 23. The Contractor shall ensure that employees wear all required personal protective equipment (PPE) when perf orming this work.
208-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Inspection . In the presence of the Engineer, the Contractor shall open the SWTD access and make a visual inspection. The Contractor shall determine if the device’s inlet and/or outlet is submerged. If the inlet/outlet is submerged, the pipe(s) connecting to the S WTD shall be plugged using a standard rubber expandable plug, or other type of approved fabricated plug. The depth of accumulated sediment in each device shall be measured with a probe and recorded.
208-4 Method of Measurement.
208-4.01 General. Vacant.
208-4.02 SWTD. The work will be measured as the number of each SWTD installed and maintained.
208-4.03 Cleaning SWTD. The work will be measured as the number of each SWTD cleaned.
208-5 Basis of Payment.
208-5.01 General. Vacant.
208-5.02 SWTD. The unit price bid for each SWTD shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work, including manhole frames and covers, and SWTD cleaning and maintenance.
208-5 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Backfill. Backfill of drainage structures and leaching basins will be paid for under the item(s) shown in the contract documents.
208-5.03 Cleaning SWTD. The unit bid price per each SWTD cleaned shall include the cost of
furnishing all labor, materials, equipment, transport and disposal necessary to satisfactorily complete the work. Progress payments will be made upon the satisfactory cleaning of the SWTD at 75% of the unit price bid. The remaining percentage will be paid after the Engineer has verified and checked quantities on receipts for all wastes received by the disposal facili ties. Payment will be made under: Item No. Item Pay Unit 208.5101 SWTD - Maximum Treatment Flow Rate up to 1.0 cfs Each 208.5201 SWTD - Maximum Treatment Flow Rate over 1.0 cfs up to 2.0 cfs Each 208.5301 SWTD - Maximum Treatment Flow Rate over 2.0 cfs up to 2.8 cfs Each 208.5401 SWTD - Maximum Treatment Flow Rate over 2.8 cfs up to 3.8 cfs Each 208.5501 SWTD - Maximum Treatment Flow Rate over 3.8 cfs up to 5.0 cfs Each 208.5601 SWTD - Maximum Treatment Flow Rate over 5.0 cfs up to 7.0 cfs Each 208.5701 SWTD - Maximum Treatment Flow Rate over 7.0 cfs up to 10.0 cfs Each 208.5801 SWTD - Maximum Treatment Flow Rate over 10.0 cfs up to 15.0 cfs Each 208.5901 SWTD - Maximum Treatment Flow Rate over 15.0 cfs up to 25.0 cfs Each 208.60 Cleaning Stormwater Treatment Device Each SECTION 209 - SOIL EROSION AND SEDIMENT CONTROL (Last Revised January 2019 )
209-1 DESCRIPTION. This work shall consist of furnishing, installing, inspecting, maintaining, and
removing soil erosion and sediment control measures as shown on the contract documents and as directed by the Engineer.
209-1.01 Erosion Control. Erosion Control is any action taken to reduce soil erosion and control
sedimentation, including the use of mulch, straw/wood fiber mulch, seed and mulch, seed and straw/wood fiber mulch, rolled erosion control products, soil stabilizers, and pipe slope dra ins.
209-1.02 Sediment Control. Sediment Control is any action taken to minimize suspended solid material
transport by water, including the use of sediment traps, turbidity curtains, sediment filter logs, silt fence, check dams, drainage structure inlet protection, and stabilized constru ction entrance/exits.
209-2 Materials.
209-2.01 General. None specified.
209-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 209-2.02 Mulch -Temporary. The materials shall meet the requirements of the following subsections of §700 Materials and Manufacturing . Straw 713-19 Wood Fiber Mulch 713-11
209-2.03 Seed -Temporary. The materials shall meet the requirements of the following subsections of
§700 Materials and Manufacturing . Seeds 713-04 Water 712-01 Seed shall be ryegrasses (annual or perennial) or cereal grasses suitable for the area as a temporary cover and which will not compete with the grasses sown later for permanent cover.
209-2.04 Check Dams. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing . Stone Filling 733-21 Coarse Aggregate 703-02 Sediment Filter Logs 713-20 Geotextile 737-01
209-2 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Stone shall meet the requirements of §703 -02 Coarse Aggregate , size designation 1 as described in Table 703 -4. Stone filling shall be placed over the geotextile apron. Refer to the standard sheets for additional information.
209-2.05 Linear Measures. The materials shall meet the requirements of the following subsections of
Section 700 Materials and Manufacturing. Geotextiles 737-01 Sediment Filter Logs 713-20
209-2.06 Sediment Traps -Temporary. The materials shall meet the requirements of the following
subsections of §700 Materials and Manufacturing : Stone Filling 733-21 Geotextile 737-01
209-2 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Sieve Size Percent Passing by Weight 6 inch 90 – 100 3/4 inch 50 – 100 1/4 inch 40 – 90 #40 30 – 85 #200 25 - 75
209-2.07 Pipe Slope Drain -Temporary. The materials shall meet the requirements of the following
subsections of §700 Materials and Manufacturing . Smooth Interior Corrugated Polyethylene Pipe 706-12 Corrugated Interior Polyethylene Pipe 706-14 Corrugated Steel Pipe 707-02 Corrugated Aluminum Pipe 707-13 Stone Filling 733-21 Coarse Aggregate 703-02 Geotextile 737-01
209-2 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 A. Pipe. The pipe shall be corrugated plastic pipe per §706 -14 or corrugated metal pipe (CMP) per §707 -02 or 707 -13 or other material as approved by the Engineer. The pipe shall have soil-tight or better connections. Refer to the standard sheets for direction on pipe sizes.
209-2.08 Rolled Erosion Control Products and Soil Stabilizers. The materials shall meet the
requirements of the following subsections of Section 700 Materials and Manufacturing. Rolled Erosion Control Products and Soil Stabilizers 713-07 The Type and Class shall be as specified in the contract documents.
209-2.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . The materials shall
meet the requirements of the following subsections of this Section and §700 Materials and Manufacturing . Straw 713-19 Wood Fiber Mulch 713-11 Seeds 713-04 Water 712-01 Coarse Aggregate 703-02 Geotextiles 737-01
209-2 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Crushed Stone or Gravel. Crushed stone or gravel shall meet the requirements of size designation #3 on Table 703 -4.
209-2.10 Turbidity Curtain -Temporary. The materials shall meet the requirements of the following
subsections of §700 Materials and Manufacturing. Turbidity Curtain 737-01F. The Turbidity Curtain shall be a commercially available, pre -assembled system, including a geotextile, flotation system, bottom weight, and anchoring and securing mechanism. If assembled in panels, it shall include a secure mechanism for joining panels tog ether. Hemmed pockets shall be sewn or heat bonded to contain flotation material, bottom weights, and for anchor lines. The flotation material shall maintain buoyancy if punctured or cut. The bottom weight shall be sufficient to hold the curtain in a vertical position. For sites not subject to tidal or heavy wave action, the curtain shall be capable of molding to conform to bottom contours so that suspended sediment is prevented from escaping underneath the curtain. Anchorage lines shall be provided of suff icient strength and number to support the curtain and maintain it in position under normally expected conditions. End anchors shall be provided, with intermediate anchor points (for stakes or anchors) such that unanchored spans do not exceed 100 feet, suff icient to maintain the turbidity curtain in place. Where the turbidity curtain is constructed in panels, anchor -line and shackle connections securing the panels together shall be sufficient for normally expected current, wind, or wave conditions.
209-2.11 Drainage Structure Inlet Protection -Temporary. The materials shall meet the requirements
of the following subsections of Section 700 Materials and Manufacturing. Coarse Aggregate 703-02 Geotextiles 737-01 Sediment Filter Logs 713-20
209-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. Fasteners. Fasteners shall be heavy duty staples, hog rings, tie wires, or any other fastener compatible with the post material.
209-3 Construction Details.
209-3.01 General. In the event of conflict between these requirements and pollution control laws, rules,
regulations or permit conditions by other federal or state agencies, the more restrictive shall apply. Soil erosion and sediment control shall be performed consistent with §107 -12 Water Quality Protection and included as part of the construction schedule submitted by the Contractor in accordance with §108 -01 Start and Progress of Work. To the extent practicable, this work shall be coordinated with other items of work specified elsewhere in the contract documents. The intent is to assure effective and continuous erosion and sediment control throughout the construction phase and post cons truction to reduce the impacts of soil loss on receiving waters and adjacent properties.
209-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Sediment controls shall be installed prior to performing grubbing, excavation, and borrow or fill operations, except for those actions necessary to install the sediment controls. The Contractor shall limit the area of clearing and grubbing, excavation, bor row and embankment operations in progress commensurate with their capability to minimize erosion and sediment transport and keep the finish grading, mulching, seeding and other temporary and/or permanent control measures current in accordance with the appr oved schedule. The Engineer may determine that a potential for erosion or sediment transport exists and direct the Contractor to install temporary erosion controls earlier. When permanent soil erosion and sediment control measures cannot be installed due t o seasonal or other limitations, temporary soil erosion and sediment control measures shall be installed. Prior to removing or disturbing any erosion or sediment control measure that may be required to be reestablished due to continual grading operations, the Contractor shall verify the proposed progression of operations and the reestablishment of control measures with the Engineer to ensure the continuity of erosion and sediment control. Sediment control measures shall not be removed without the Engineer’s approval.
209-3.02 Mulch -Temporary. The Contractor shall have the capability to mulch any disturbed areas on
any given day (e.g., those areas where earthwork operations are ongoing, etc.). The Contractor shall apply mulch on disturbed areas consistent with the approved project schedule or no later than seven days after grading. Straw mulch shall be spread uniformly in a continuous blanket at a rate of 2 tons per acre. Wood fiber mulch shall be applied at a rate of 1.5 tons per acre. Mulch may be spread by hand, mecha nical spreaders, or blowers.
209-3.03 Seed and Mulch -Temporary. The Contractor shall apply seed and mulch on disturbed areas
that will remain idle for more than fourteen days and regraded at a later date. The Contractor shall clean all equipment involved in seeding to remove all unwanted plants, seeds and propagules p rior to starting work.
209-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Prior to the application of seed, all areas where compaction has occurred shall be scarified. The seed bed shall be loose and friable for positive seed retention. The Contractor shall spread ryegrass at a rate of 30 pounds per acre or cereal grasses spread at a rate of 100 pounds per acre to uniformly cover the ground. The Contractor shall evenly distribute seed by any method of sowing that does not injure the seed s in the process of spreading. The Contractor shall spread mulch immediately following application of seed. If using straw mulch, it shall be spread uniformly in a continuous blanket at an approximate rate of 2 tons per acre by hand, or by mechanical spreaders or blowers. Mulch and seed shall not be placed simultaneously, except in the case of hydroseeding. The Contractor shall secure straw mulch to the soil surface by crimping or applying a soil stabilizer immediately after mulching, then water the seeded area. The application of water shall not result in damage to the seeded area including the redistribution of seeds (congregating seeds as a result of ponding or pooling water) or soil erosion (rilling). The Contractor shall water the temporary seed and mulch area until seed has germinated. Maintenance of temporary seed and mulch areas shall include re -seeding, as necessary, to achieve temporary stabilization.
209-3.04 Check Dams. Check dams shall be constructed in accordance with the standard sheets and to
the dimensions and locations shown in the contract documents. A bedding type geotextile (§737 -01 Geotextiles ) or stone (§733 -21 Stone Filling, Light or §703 -02 Coarse Aggregate ) scour protection shall be placed as indicated in the contract documents. Temporary Silt Dike check dams shall be attached to the ground with wire staples. Staples shall be placed according to Manufacturer’s instructions. Sediment Filter Log prefabricated check dams shall be installed according to Manufacturer’s instructions. Sediment Filter Logs shall be removed at the end of the contract, unless noted otherwise in contract documents.
209-3.05 Linear Measures. Linear measures shall be constructed in accordance with the standard sheets
and to the dimensions and locations shown in the contract documents.
209-3.06 Sediment Trap -Temporary. Sediment traps shall be constructed in accordance with the
standard sheets and to the dimensions and locations shown in the contract documents. The area under which the berm will be constructed shall be cleared, grubbed and stripped of any vegetation and root mat. The pool area shall be cleared of woody vegetation. All work shall be performed in accordance with §201 Clearing and Grubbing and paid for separately.
209-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Proctor Maximum Density. Impervious embankment material shall then be deposited in lifts not exceeding 8 inches and compacted to not less than 95 percent of Standard Proctor Maximum Density. The moisture content of all impervious embankment material shall not be greater than 2 percent above Optimum Moisture Content as determined by AASHTO T -99 Standard Method of Test for Moisture -Density relations of Soils using a 5.5 pound Rammer and a 12 inch Drop, Method C at the time of compaction.
209-3.07 Pipe Slope Drain -Temporary. Pipe slope drain shall be installed in accordance with the
contract documents and standard sheets. Additional right -of-way may be required to accommodate this practice.
209-3.08 Rolled Erosion Control Products and Soil Stabilizers. Rolled Erosion Control products and
Soil Stabilizers shall be installed or applied as specified in the contract documents and/or according to Manufacturer’s instructions. For areas at final grade, all loose stones, clods, sticks, or other undesirable mater ial shall be removed in accordance with the Manufacturer’s recommendations or as specified in the contract documents. Where topsoil is specified, the rolled erosion control product will be inst alled within 2 work days of topsoil placement and soil stabilizers shall be applied according to Manufacturer’s instructions.
209-3 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (2) An approved RECP (Class I or II)
209-3.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . Stabilized
Construction Access Construction entrances/exits shall be placed where shown in the contract documents and constructed in accordance with the standard sheets, or as otherwise approved by the Engineer. The Contractor shall grade, including excavating or placing fill, to prepare the original ground surface for the placement of a stabilized pad of at least 6 inches of coarse aggregate material, underlain by a geotextile. If necessary, a drainage pipe shall be installed to maintain the capacity of the ditch. The pipe dimension shall be consistent with the modified soil erosion and sediment control plan approved by the Engineer. All areas cut or filled and not stabilized by the construction Entrance/Exit stabilized construction access material shall be covered with an erosion control treatment (temporary mulch, temporary seed and mulch, etc.) and shall be included in this pay item. When wheel washing is performed, the washing area shall be located away from the construction entrance/exit stabilized construction access in an area which will drain into an approved sediment control measure(s). The construction entrance/exit stabilized construction access shall be maintained in a condition which will prevent tracking or flowing of sediment onto a paved public roadway. All sediment spilled, dropped, washed or tracked onto paved public roadway shall be removed immediately. In the event the stabilized construction access entrance/exit is no longer performing properly (i.e. the entrance/exit course aggregate becomes clogged with sediment), the Contractor shall top -dress the stabilized construction access entrance/exit with additional coarse aggregate material.
209-3.10 Turbidity Curtain -Temporary.
209-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. If constructed in panels, panels shall be connected in such a manner as to prevent suspended particles passing through joints. Load lines shall be connected so as to develop the full strength of the line across the joint.
209-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. The turbidity curtain shall remain in place until the protected construction activities have ceased and there is no visible contrast between the water being contained and the water body being protected.
209-3.11 Drainage Structure Inlet Protection -Temporary. Drainage structure inlet protection shall be
placed where shown in the contract documents and constructed in accordance with the standard sheets.
209-4 Method of Measurement.
209-4.01 General. Vacant.
209-4.02 Mulch -Temporary. The quantity to be measured for payment will be in square yards to the
nearest whole square yard of mulch -temporary installed.
209-4.03 Seed and Mulch -Temporary. This work will be measured in square yards to the nearest whole
square yard of seed and mulch -temporary installed.
209-4.04 Check Dam.
209-4.05 Linear Measures. The work will be measured as the number of linear feet to the nearest whole
linear foot of silt fence or sediment filter logs installed. No additional measurement will be made for seams or overlaps.
209-4.06 Sediment Traps -Temporary. The work will be measured as the number of sediment traps
installed.
209-4.07 Pipe Slope Drains -Temporary. The work will be measured as the number of pipe slope drains
installed.
209-4.08 Rolled Erosion Control Products and Soil Stabilizers. The work will be measured as the
number of square yards to the nearest square yard of rolled erosion control products and soil stabilizers installed.
209-4.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . The work will be
measured as the number of square yards to the nearest square yard of construction stabilized construction access entrance/exit installed.
209-4 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 209-4.10 Turbidity Curtain -Temporary. This work will be measured in linear feet, to the nearest whole linear foot, of turbidity curtain installed.
209-4.11 Drainage Structure Inlet Protection -Temporary. This work will be measured as the number
of linear feet to the nearest whole linear foot of drainage structure inlet protection installed. No additional measurements will be made for seams or overlaps.
209-5 Basis of Payment.
209-5.01 General. The unit price bid for all work items shall include the cost of all labor, equipment, and
materials necessary to satisfactorily complete the work, including the cost of removal of accumulated sediment. Progress payments will be made for all sediment control measures as follows: Seventy -five percent of the price bid will be paid after installation of Check Dams, Silt Fence -Temporary, Construction Entrance/Exit -Temporary Stabilized Construction Access , Drainage Structure Inlet Protection - Temporary, Sediment Filter Logs and Turbidity Curtain -Temporary. Fifty percent of the price bid will be paid after installation of Sediment Traps and Pipe Slope Drains. The remaining percentage will be paid when the te mpora ry practice is removed and the remaining area is permanently stabilized. Payment for Mulch -Temporary, Seed and Mulch -Temporary and Rolled Erosion Control Products and Soil Stabilizers will be paid in full after installation of the practice.
209-5.02 Mulch -Temporary. The unit price bid per square yard of mulch -temporary shall include the
cost of all labor, equipment, and materials necessary to satisfactorily complete the work.
209-5.03 Seed and Mulch -Temporary. The unit price bid per square yard seed and mulch -temporary
shall include the cost of all labor, equipment, and materials necessary to satisfactorily complete the work.
209-5.04 Check Dams. The unit price bid for check dams shall include the cost of all labor, material and
equipment necessary to satisfactorily complete the work.
209-5.05 Linear Measures. The unit price bid for silt fence -temporary or sediment filter logs shall
include the cost of all labor, materials and equipment necessary to satisfactorily complete the work.
209-5.06 Sediment Traps -Temporary. The unit price bid for sediment traps -temporary shall include the
cost of all labor, material and equipment necessary to satisfactorily complete the work. Temporary seed and mulch and rolled erosion control product will be paid for separately.
209-5.07 Pipe Slope Drains -Temporary. The unit price bid for pipe slope drains -temporary shall include
the cost of all labor, material and equipment necessary to satisfactorily complete the work, including gravel bags, stone, sediment filter logs, manufactured silt dikes and/or other materials necessary to construct the practice.
209-5.08 Rolled Erosion Control Products and Soil Stabilizers. The unit price bid for rolled erosion
control products and soil stabilizers shall include the cost of all labor, material and equipment necessary to satisfactorily complete the work.
209-5.09 Stabilized Construction Access Construction Entrance/Exit -Temporary . The unit price bid
for stabilized construction access construction entrance/exit -temporary shall include the cost of all labor, material and equipment necessary to satisfactorily complete the work. Payment will not be made for construction entrances associated with the Contractor’s facilities (e.g., staging areas, storage yards, borrow sites, etc.).
209-5 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2
209-5.10 Turbidity Curtain -Temporary. The unit price bid for turbidity curtain -temporary shall include
the cost of all labor, materials, and equipment necessary to satisfactorily complete the work.
209-5.11 Drainage Structure Inlet Protection -Temporary. The unit price bid for drainage structure
inlet protection – temporary shall include the cost of all labor, materials, and equipment necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 209.100101 Mulch -Temporary Square Yard 209.100102 Seed -Temporary Square Yard 209.1003 Seed and Mulch -Temporary Square Yard 209.110101 Check Dam (Ditch Bottom Width 0.0 to 3′), Stone -Temporary Each 209.110102 Check Dam (Ditch Bottom Width >3′ to 6′), Stone -Temporary Each 209.110103 Check Dam (Ditch Bottom Width >6′ to 10′), Stone -Temporary Each 209.110104 Check Dam (Ditch Bottom Width >10′), Stone -Temporary Each 209.110201 Check Dam (Ditch Bottom Width 0.0 to 3′), Gravel Bag -Temporary Each 209.110202 Check Dam (Ditch Bottom Width >3′ to 6′), Gravel Bag -Temporary Each 209.110203 Check Dam (Ditch Bottom Width >6′ to 10′), Gravel Bag -Temporary Each 209.110204 Check Dam (Ditch Bottom Width >10′), Gravel Bag -Temporary Each 209.1105 Check Dam, Prefabricated -Temporary Foot 209.110601 Check Dam, (Ditch Bottom Width 0.0 to 3′), Stone -Permanent Each 209.110602 Check Dam, (Ditch Bottom Width >3′ to 6′), Stone -Permanent Each 209.110603 Check Dam, (Ditch Bottom Width >6′ to 10′), Stone -Permanent Each 209.110604 Check Dam, (Ditch Bottom Width >10′) Stone -Permanent Each 209.13 Silt Fence -Temporary Foot 209.1401nn Sediment Trap, Earth Berm -Temporary Each 209.1402nn Sediment Trap, Sand Bag -Temporary Each 209.1403nn Sediment Trap, Ditch Dam -Temporary Each 209.1501 Turbidity Curtain -Temporary Foot 209.160103 Pipe Slope Drain, 12" -Temporary Each 209.160105 Pipe Slope Drain, 18" -Temporary Each 209.160106 Pipe Slope Drain, 24" -Temporary Each 209.1701 Drainage Structure Inlet Protection, Silt Fence -Temporary Foot 209.1702 Drainage Structure Inlet Protection, Gravel Bag -Temporary Cubic Yard 209.1703 Drainage Structure Inlet Protection, Prefabricated -Temporary Foot 209.1704 Drainage Structure Inlet Protection, Concrete Block -Temporary Foot 209.1705 Drainage Structure Inlet Protection, Excavated -Temporary Foot 209.1801 Rolled Erosion Control Product, Class I Type A, Short Term Square Yard 209.1802 Rolled Erosion Control Product, Class I Type B, Short Term Square Yard 209.1803 Rolled Erosion Control Product, Class I Type C, Short Term Square Yard 209.1901 Rolled Erosion Control Product, Class II Type A, Intermediate Square Yard 209.190201 Rolled Erosion Control Product, Class II Type B, Intermediate Square Yard 209.190301 Rolled Erosion Control Product, Class II Type C, Intermediate Square Yard 209.1904 Rolled Erosion Control Product, Class II Type D, Intermediate Square Yard 209.200101 Turf Reinforcement Mats, Class III Type A, Permanent Square Yard 209.200201 Turf Reinforcement Mats, Class III Type B, Permanent Square Yard 209.200301 Turf Reinforcement Mats, Class III Type C, Permanent Square Yard 209.200401 Turf Reinforcement Mats, Class III Type D, Permanent Square Yard 209.2101 Soil Stabilizers, Class IV Type A Square Yard
209-5 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 209.2102 Soil Stabilizers, Class IV Type B Square Yard 209.22 Stabilized Construction Access Square Yard 209.2103 Soil Stabilizers, Class IV Type C Square Yard 209.2301 Sediment Filter Log, 12″ Foot 209.2302 Sediment Filter Log, 18″ to 20″ Foot 209.2303 Sediment Filter Log, 24″ Foot NOTE: nn denotes serialized pay item. These items will be paid for within established size groups. SECTION 210 - REMOVAL AND DISPOSAL OF ASBESTOS -CONTAINING MATERIAL (BUILDINGS, BRIDGES AND HIGHWAYS)
210-1 DESCRIPTION. This work shall consist of removal and disposal of asbestos - containing
material (ACM) from locations designated in the Contract Documents and/or where directed by the Engineer. Additional contract -specific requirements may be found on the plans or in the proposal in a Special Note entitled "Asbestos Remediation Supplemental Requirements.”
210-2 MATERIALS. All materials used in the performance of the work shall comply with all
applicable regulatory standards. Respirators and filters shall comply with NIOSH and MSHA standards. HEPA filtration systems shall comply with ANSI Z9.2 -79.
210-3 CONSTRUCTION DETAILS. Prior to beginning any work under this item, the Contractor shall
supply the Engineer with proof that the firm performing the work has a valid asbestos handling license; that its insurance coverage whether provided by the Contractor or the Asbestos Subc ontractor, is consistent with §107 -06 Insurance and includes an asbestos -specific, occurrence -type policy with no deductible or sunset clause; that its project supervisor is a NYSDOL certified asbestos project supervisor; that al l employees engaged in the work are properly certified and have current physical examinations and respirator fit tests; and that the proper notification of work beginning on the asbestos project has been given to the New York State Department of Labor (NYS DOL) and the United States Environmental Protection Agency (USEPA). The Contractor shall schedule a coordination meeting between the Asbestos Subcontractor and the Department contracted Asbestos Project Monitor to be held at least two (2) weeks before the start of any asbestos abatement work. The meeting shall be held at the Engineer’s Field Office unless otherwise approved by the Engineer. The Contractor shall remove and dispose of ACMs in accordance with 12 NYCRR 56 or, if indicated, an approved variance thereof promulgated by the New York State Department of Labor (NYSDOL); the National Emission Standards for Hazardous Air Pollutants (NES HAP), promulgated by the United States Environmental Protection Agency (USEPA); and the Occupational Safety and Health Administration (OSHA). In the event of a conflict between these specification requirements and laws, rules and regulations of Federal, State, or local agencies, the more restrictive shall apply. ACM shall be disposed of in accordance with 40 CFR Part 61 and all other requirements and laws, rules, and regulations of applicable Federal, State, or local agencies. Disposal sites which accept ACM for disposal shall be permitted by the New York State D epartment of Environmental Conservation (NYSDEC). If disposed of out -of-state, the rules, regulations, and laws of that state shall apply. After the work is completed, the Contractor shall provide the Engineer with two copies of Daily Logs, Visitor Logs, Final Visual Inspection Logs and OSHA Air Monitoring records. The Contractor shall also provide the Engineer with a written certification t hat the material was disposed of in an approved waste disposal site. For friable waste this certification shall be in the form of a Waste Shipment Record. For non-friable waste this certification shall include the name and address of the waste disposal s ite or sites used.
210-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 210-4 METHOD OF MEASUREMENT. The quantity of ACM to be measured for payment will be determined by one of the following methods:
210-4.01 Square Foot . The quantity to be measured will be the area, measured to the nearest 0.1 square
foot, of asbestos -containing material removed and disposed of.
210-4.02 Foot . The quantity to be measured will be the length, measured to the nearest 0.1 foot, of
asbestos -containing material removed and disposed of.
210-4.03 Lump Sum . The quantity will be measured for payment on a lump sum basis.
210-4.04 Fixed Price Lump Sum. The lump sum shown in the itemized proposal for this item will be
considered the price bid even though payment will be made for the work performed. Should the amount shown be altered, the altered figures will be disregarded and the original price will be used to determine the total contract bid amount. Payments will be based on one or both of the following:
210-5 BASIS OF PAYMENT. Payment for the work under this specification shall include all labor,
materials, equipment, and asbestos -related fees and insurances necessary to satisfactorily complete the work. Payment shall not include Work Zone Traffic Control devices outside the regulated asbestos work area.
210-5.01 Square Foot , Foot , or Lump Sum Bid Items. Payment for 75% of the completed quantity
will be made upon the Project Monitor's written concurrence with the Contractor's certification as to the following: that the building, structure, and/or highway is visually free of asbestos; that the removal of the asbestos containing material was performed as required; that the final clearance air monitoring results meet the acceptable level specified in 12 NYCRR 56; and, that the building(s), bridge(s), and/or highway(s) are certified by the asbestos Contractor to be available for normal demolition. The remainder of the payment for completed work will be made upon receipt by the Engineer of a certified statement from the disposal facility, signed by an official thereof, that the asbestos -containing material has been accepted and disposed of in accorda nce with all applicable laws, codes, rules, and regulations.
210-5.02 Fixed Price Lump Sum. The fixed price lump sum published in the proposal is an amount
estimated by the State to be adequate to complete the work. Payments under this work will be made by Force Account or by Agreed Price, or by a combination thereof. Payment for 75% of the Agreed Price or Force Account charges will be made upon the Project Monitor's written concurrence with the Contractor's certification that the building, structure, and/or highway is visually free of asbestos; the removal of the asbe stos containing material was performed as required; that the final clearance air monitoring results meet the acceptable level specified in 12 NYCRR 56; and, that the building(s), bridge(s), and/or highway(s) are certified by the asbestos Contractor to be available for subsequent demolition and/or construction. The remainder of the payment for completed work will be made upon receipt by the Engineer of a written certification that the ACM was disposed of in an approved waste disposal site.
210-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Asbestos -specific insurance premiums will be reimbursed as the actual and identifiable cost of the portion of the premium attributable to the work performed under the Fixed Price Lump Sum Item. No overhead or profit will be allowed on asbestos specific in surance premiums. Payment will be made under: Item No. Item Pay Unit Roofing (Buildings) 210.1002 Removal and Disposal of Roofing ACM Square Foot 210.1003 Removal and Disposal of Roofing ACM Lump Sum 210.1004 Removal and Disposal of Roofing ACM Fixed Price Lump Sum Siding (Buildings) 210.1102 Removal and Disposal of Siding ACM Square Foot 210.1103 Removal and Disposal of Siding ACM Lump Sum 210.1104 Removal and Disposal of Siding ACM Fixed Price Lump Sum Window Caulking and/or Glazing (Buildings) 210.1201 Removal and Disposal of Caulk/Glazing ACM Foot 210.1203 Removal and Disposal of Caulk/Glazing ACM Lump Sum 210.1204 Removal and Disposal of Caulk/Glazing ACM Fixed Price Lump Sum Flooring/Mastic (Buildings) 210.1302 Removal and Disposal of Flooring/Mastic ACM Square Foot 210.1303 Removal and Disposal of Flooring/Mastic ACM Lump Sum 210.1304 Removal and Disposal of Flooring/Mastic ACM Fixed Price Lump Sum Ceilings (Buildings) 210.1402 Removal and Disposal of Ceiling ACM Square Foot 210.1403 Removal and Disposal of Ceiling ACM Lump Sum 210.1404 Removal and Disposal of Ceiling ACM Fixed Price Lump Sum Thermal System Insulation (Buildings) 210.1501 Removal and Disposal of Thermal System Insulation ACM Foot 210.1502 Removal and Disposal of Thermal System Insulation ACM Square Foot 210.1503 Removal and Disposal of Thermal System Insulation ACM Lump Sum 210.1504 Removal and Disposal of Thermal System Insulation ACM Fixed Price Lump Sum Miscellaneous (Buildings) 210.2901XX Removal and Disposal of Miscellaneous ACM Foot 210.2902XX Removal and Disposal of Miscellaneous ACM Square Foot 210.2903XX Removal and Disposal of Miscellaneous ACM Lump Sum 210.2904XX Removal and Disposal of Miscellaneous ACM Fixed Price Lump Sum
210-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Concrete Encased Pipe (Bridges & Highways) 210.3001 Removal and Disposal of Concrete -Encased Pipe ACM Foot 210.3003 Removal and Disposal of Concrete -Encased Pipe ACM Lump Sum 210.3004 Removal and Disposal of Concrete -Encased Pipe ACM Fixed Price Lump Sum 210.3011 Removal and Disposal of Concrete -Encased Pipe ACM (BV14) Foot 210.3013 Removal and Disposal of Concrete -Encased Pipe ACM (BV14) Lump Sum 210.3014 Removal and Disposal of Concrete -Encased Pipe ACM (BV14) Fixed Price Lump Sum Underground Pipe (Bridges & Highways) 210.3101 Removal and Disposal of Underground Pipe ACM Foot 210.3103 Removal and Disposal of Underground Pipe ACM Lump Sum 210.3104 Removal and Disposal of Underground Pipe ACM Fixed Price Lump Sum 210.3111 Removal and Disposal of Underground Pipe ACM (BV14) Foot 210.3113 Removal and Disposal of Underground Pipe ACM (BV14) Lump Sum 210.3114 Removal and Disposal of Underground Pipe ACM (BV14) Fixed Price Lump Sum Suspended Pipe (Bridges & Highways) 210.3201 Removal and Disposal of Suspended Pipe ACM Foot 210.3203 Removal and Disposal of Suspended Pipe ACM Lump Sum 210.3204 Removal and Disposal of Suspended Pipe ACM Fixed Price Lump Sum 210.3211 Removal and Disposal of Suspended Pipe ACM (BV14) Foot 210.3213 Removal and Disposal of Suspended Pipe ACM (BV14) Lump Sum 210.3214 Removal and Disposal of Suspended Pipe ACM (BV14) Fixed Price Lump Sum Bond Breaker/Filler (Bridges & Highways) 210.3302 Removal and Disposal of Bond Breaker/Filler ACM Square Foot 210.3303 Removal and Disposal of Bond Breaker/Filler ACM Lump Sum 210.3304 Removal and Disposal of Bond Breaker/Filler ACM Fixed Price Lump Sum 210.3312 Removal and Disposal of Bond Breaker/Filler ACM (BV14) Square Foot 210.3313 Removal and Disposal of Bond Breaker/Filler ACM (BV14) Lump Sum 210.3314 Removal and Disposal of Bond Breaker/Filler ACM (BV14) Fixed Price Lump Sum Caulking (Bridges & Highways) 210.3401 Removal and Disposal of Caulking ACM Foot 210.3403 Removal and Disposal of Caulking ACM Lump Sum 210.3404 Removal and Disposal of Caulking ACM Fixed Price Lump Sum 210.3411 Removal and Disposal of Caulking ACM (BV14) Foot 210.3413 Removal and Disposal of Caulking ACM (BV14) Lump Sum 210.3414 Removal and Disposal of Caulking ACM (BV14) Fixed Price Lump Sum Miscellaneous (Bridges & Highways) 210.4801XX Removal and Disposal of Miscellaneous ACM Foot 210.4802XX Removal and Disposal of Miscellaneous ACM Square Foot 210.4803XX Removal and Disposal of Miscellaneous ACM Lump Sum 210.4804XX Removal and Disposal of Miscellaneous ACM Fixed Price Lump Sum
211-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 210.4811XX Removal and Disposal of Miscellaneous ACM (BV14) Foot 210.4812XX Removal and Disposal of Miscellaneous ACM (BV14) Square Foot 210.4813XX Removal and Disposal of Miscellaneous ACM (BV14) Lump Sum 210.4814XX Removal and Disposal of Miscellaneous ACM (BV14) Fixed Price Lump Sum Item Number Codes 210.xxyz XX where xx equals Category
10-28 Buildings, 29 Miscellaneous (Buildings)
30-47 Bridges and Highways, 48 Miscellaneous (Bridges and Highways)
where y equals BV
1-9 In order of listing within the category, 0 No BV
where z equals Payment Method 1=Foot , 2=Square Foot , 3=Lump Sum, 4=Fixed Price Lump Sum where XX denotes serialization (applicable to only miscellaneous items) SECTION 211 - INTERNALLY STABILIZED CUT STRUCTURES
211-1 DESCRIPTION. This work shall consist of designing, furnishing, installing, and testing an
internally stabilized cut structure at the location(s) and to the elevation(s) shown in the contract documents.
211-1.01 Soil Nail Wall System. A Soil Nail Wall System is comprised of cement -grouted steel nail
tendons, a drainage network and a facing system to internally stabilize a cut and/or underpin a structure.
211-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. Epoxy Coating – A product containing pigments, thermosetting epoxy resins, cross linking agents, and other additives, which is applied in the form of a powder onto a clean, heated metallic substrate and fuses to form a continuous barrier coating.
211-1.02 Grouted Tieback System. A Grouted Tieback System is comprised of cement -grouted steel
tendons installed to internally stabilize and supplement the resisting force of an external support system retaining a cut and/or underpinning a structure.
211-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 6. Bond Breaker. A sleeve placed over the tendon in its free stressing length to allow elongation of the tendon free stressing length during stressing.
211-2 Materials .
211-2.01 Soil Nail Wall System (SNWS) . Ensure that the proper materials are supplied for the chosen
system design.
211-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. SNWS Soil Nail Tendon Assembly . Provide components for assembling a soil nail tendon conforming to the requirements of §731 -01 A. SNWS Temporary .
211-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. SNWS Permanent. Provide materials meeting the requirements §211 -2.01 A. SNWS Temporary with the following exceptions :
211-2.02 Grouted Tieback System (GTS) . Ensure that the proper materials are supplied for the chosen
system design.
211-3 Construction Details .
211-3.01 Soil Nail Wall System (SNWS).
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 satisfactorily place the shotcrete. This will be based on either previous ACI nozzlemen certification or satisfactory completion of preconstruction test panels.
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (1) Compressive strength test results supplied by a qualified independent testing laboratory verifying a minimum 3 -day compressive strength of 2000 psi and a minimum 28-day compressive strength of 4000 psi.
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 required to maintain a clean and open hole. Utilize a drill bit with a diameter not smaller than the specified hole diameter minus ⅛ in. Extend the hole a minimum of 2 ft. beyond the nail length. Drill the holes to the inclination specified on the approv ed Working Drawings within a 3° tolerance. Provide centralizers at a maximum of 10 ft. center -to-center spacing throughout the length of the nail to position the bar within 1 in. of the center of the hole and to provide a minimum 1 in. grout cover over bare or epoxy -coated bars or ½ in. grout cover over the encapsulation of an encapsulated nail. Size the centralizers to allow insertion of a tremie pipe to the bottom of the drillhole and to allow grout to freely flow up the drillhole. Provide a centralizer within 2 ft. of the top and bottom of the nail. Sag of the nail shall be taken into account when selecting centralizer diameter and spacing. Insert the nail in the casing or hole after the hole is drilled to the final depth. Locate the nail within a 6 in. tolerance, in any direction. Location tolerances are applicable to only one nail and not accumulative over large wall areas. Repair encapsulated nails that are damaged or defective in accordance with the manufacturer’s recommendations or remove them from the site. Provide a colloidal mixer and grouting equipment capable of continuous mixing and producing grout free of lumps equivalent to the strength and consistency of the approved mix design created by the independent testing laboratory. Equip the grout pump with a grout pressure gage capable of measuring at least twice but not more than three times the intended grout pressure. Size the grouting equipment to enable the entire nail to be grouted in one continuous operation. Place grout within 60 minutes after mixing or within the time recommended by the admixture manufacturer, if admixtures are used. Grout not placed in the allowed time limit will be rejected. Perform the grouting operation after the nail is inserted. Grout each drillhole within 2 hours of completion of drilling. To prevent air voids, fill the hole with grout progressively from the bottom to the top. Completely fill the drillhole in one continu ous operation. Cold joints in the grout column are not allowed except at the top of the test -bond length of proof -tested production nails. Maintain sufficient grout level within the casing to offset the external groundwater/soil pressure and prevent hole caving during casing removal for drillholes advanced by either cased or auger methods. Maintain grout head or grout pressures sufficient to ensure that the drillhole will be completely filled with grout and to prevent unstable soil or groundwater from contaminating or diluting the grout. Control grout pressures to prevent excessive ground heave or fracturing. Remove the grout and nail if grouting is suspended for more than 30 minutes or does not satisfy the requirements of this specification or the approved Working Drawings, and replace with fresh grout and undamaged nail bar at no additional cost. Test nails as specified in §211 -3.01 E SNWS Testing .
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Ensure that the thickness of shotcrete satisfies the minimum requirements as shown on the approved Working Drawings using shooting wires, thickness control pins, or other acceptable devices. Fill all depressions along the excavated face with shotcrete at n o additional cost to the State. Repair shotcrete surface defects as soon as possible after placement. Remove and replace shotcrete which exhibits segregation, honeycombing, lamination, voids, or sand pockets. In -place shotcrete determined not to meet the specified strength requirements w ill be subject to remediation. Finish shotcrete with either an undisturbed gun finish as applied from the nozzle or a rough - screeded finish. Attach a bearing plate and nut to each nail head as shown on the approved Working Drawings. While shotcrete is still plastic and before its initial set, uniformly seat the plate on the shotcrete by hand wrench tightening the nut. Where uniform contact betw een the plate and the shotcrete cannot be provided, set the plate in a bed of grout. After grout has set for 24 hours, tighten the nut using a hand wrench. Ensure bearing plates with headed studs are in intimate contact with the construction facing and the studs are located within the tolerances specified herein. Locate the SNWS facing elements from the contract documents location and dimensions within the tolerances provided in Table 211 -3 SNWS Tolerances for Facing Elements : TABLE 211 -3 SNWS TOLERANCES FOR FACING ELEMENTS Facing Element Tolerance Horizontal location of wire mesh, rebar and headed studs ± ⅝ in. Location of headed studs on bearing plate ± ¼ in. Spacing between reinforcing bars ± 1 in. Reinforcing lap ± 1 in. Shotcrete thickness ± ⅜ in. Nail head bearing plate ± 10° deviation from parallel to the wall face Do not excavate to the next lift until nail installation, reinforced shotcrete placement, attachment of bearing plates, and nuts and nail testing has been completed and accepted in the current lift. Ensure nail grout and shotcrete have cured for at least 72 hours or attaine d at least their specified 3 -day compressive strength before excavating the next underlying lift.
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. PreProduction Verification Test. Perform a preproduction verification test prior to installation of production nails to verify the Contractor’s installation methods and nail pullout resistance. Testing requirements are contained in §211 -3.01 E. 2. Verification Testing .
211-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 b. The total measured movement at the maximum test load exceeds 80% of the theoretical elastic elongation of the test nail unbonded length.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. A total load hold movement of less than 0.04 in. measured between the 1 and 10 minute readings or a total load hold movement of less than 0.08 in. is measured between the 6 and 60 minute readings and the creep rate is linear or decreasing throughout the load hold period.
211-3.02 Grouted Tieback System (GTS).
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 ft. or as shown in the contract documents, whichever is greater. The tieback hole shall remain inside the right -of-way or easement limits shown in the contract documents. Provide working drawings conforming to the size and type requirements in accordance with §718-01 Prestressed Concrete Units (Structural) A. Size and Type. Include the following:
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 connected to the supporting structure. If operations cause subsidence or physical damage, immediately cease operations and repair the damage. The Contractor shall immediately revise operations to prevent reoccurrence of such damage. Any and all costs incur red due to this subsidence or physical damage shall be at no additional cost to the State. If the hole will not stand open, casing shall be installed as required to maintain a clean and open hole. The hole diameter shall be no less than 3 in. if using pres sure grouting in the bond length and 4 in. if not using pressure grouting. The Contractor shall provide a drill bit with a diameter no less than the specified hole diameter minus ⅛ in. The hole shall extend a minimum of 2 ft. beyond the tendon length. The holes shall be located in elevation as shown in the contract documents, within a 3 in. tolerance. The holes shall be progressed to the inclination and alignment as specified in the contract documents, within a ±3° tolerance. All tieback holes shall be prog ressed perpendicular to the direction of the wall, as seen in the contract documents. Holes in rock shall be thoroughly cleaned of all dust, rock chips, grease or other material which may affect bond prior to inserting the tendon. Strands shall not be coupled, except in the case of repairs of installed tendons or for extending stressed strand anchors. A water -tightness test will be required for all tiebacks bonded in rock if grout is injected at a pressure of less than 50 psi. The water -tightness test shall be performed by filling the entire hole in the rock with water and subjecting it to a pressure of 5 psi as measured at the top of the hole. If the stressing length portion of hole is in soil or fractured rock, a packer or casing shall be used to allow the bond length to be pressure -tested. If the leakage rate from the hole, over a 10 minute period, exceeds 0.001 gal. of water per inch of hole diameter per foot of length of hole per minute, the hole shall be grouted, redrilled and retested. Should the subsequent water -tightness test fail, the entire process shall be repeated until results are attained w hich are within leakage allowances. If artesian or flowing water is encountered in the drilled hole, pressure shall be maintained on the grout until the grout has reached initial set. The Contractor may eliminate the requirement for water -tightness tests in rock by using pressure grouting techniques. Pressure grouting requires that the drill hole be sealed and that the grout be injected until a 50 psi grout pressure, measured at the top of the hole, can be maintained on the grout for 5 minutes without further grout injection. In the bond length, centralizers and their installed locations shall be subject to approval by the Engineer. Centralizers shall be provided at a maximum of 10 ft. center to center spacing throughout the bond length so that not less than ½ in. of grout cove r along the bond length is achieved. A centralizer shall be provided at the bottom end of the tendon. Sag of the tendon shall be taken into account when selecting centralizer diameter and spacing. Multi -element tendons shall also employ spacers at maximum 10 ft. intervals throughout the bond length to ensure grout cover on all elements.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 When the contract documents require encapsulation to provide double -corrosion protection for the tendons:
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 plastic soils. • Proof Tests . Proof tests shall be performed on all anchors not performance or creep tested. These tests are used to verify load capacity. • Lift-Off Readings . Lift-off readings shall be taken on all tiebacks after the load has been transferred to the anchorage but prior to removing the jack. • Lift-Off Tests . Lift-off tests shall only be performed on tiebacks in rock. If required, lift -off tests shall be performed on at least 2 tiebacks at locations to be chosen by the Engineer. Additional tests, up to 10% of the total number of tiebacks may be directed by t he Engineer. Copies of all test results and graphs shall be prepared by the Contractor’s Engineer and transmitted to the Director, Geotechnical Engineering Bureau (as each test is completed) for review and approval. The Department will render a decision within 10 worki ng days after the receipt of all pertinent information. Do not excavate more than 2 ft. below the tieback elevation until testing has been completed and accepted in the current lift. Copies of all test results and graphs shall be transmitted to the Director , Geotechnical Engineering Bureau as each test is completed. Jacks shall have ram travel at least equal to the theoretical elastic elongation of the stressing length plus the bond length at the maximum test load, and be sufficient to accommodate wall movements. A pressure gauge shall be used with each jack. Gauges s hall be calibrated with a single jack and shall not be used with any other jack. All gauges shall be accurate enough to read 100 psi changes in pressure. For performance and creep tests, the jack used shall have two calibrated gauges; a master gauge and ba ckup gauge. The pump shall be capable of applying each load increment in less than 60 seconds. A load cell, which has been calibrated by an independent testing laboratory within 14 days prior to the start of work and at least annually thereafter, shall be used to measure the small changes in load during the load hold portion of the performance and c reep tests. There will be no substitute for the load cell on testing of the performance and creep tests. Load cells are not required for proof tests. The Contractor shall provide the Engineer with the calibration curve for the load cell prior to testing. For the performance and creep tests, the master gauge and backup gauge shall be connected to the same pressure hose between the pump and jack and be used to measure the applied loads. If the load measured by the master gauge and backup gauge differ by more than 10%, the jack, master gauge and backup gauge shall be recalibrated as a unit at no expense to the State. At the completion of the test the tieback load shall be adjusted to the lock -off load and transferred to the anchorage. The movement of the tieback tendon at each load increment shall be recorded to the nearest 0.001 in. relative to an independent, fixed reference point.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1P = Design Load AL = Alignment Load. The AL necessary to maintain position of the stressing and testing equipment shall not exceed 0.05 P. Set dial gauges to “zero” after the alignment load has been applied. TABLE 211 -6 GTS PERFORMANCE/CREEP TEST LOAD SCHEDULE 3 AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.75 P Maximum of 1 minute2 30 minutes 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 4 AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.75 P Maximum of 1 minute2 Maximum of 1 minute2 1.00 P Maximum of 1 minute2 45 minutes 0.75 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 Temporary Tieback AL Maximum of 1 minute2 NA3 0.25 P Maximum of 1 minute2 0.50 P Maximum of 1 minute2 1.00 P Maximum of 1 minute2 1.25 P Maximum of 1 minute2 1.33 P (Load Hold) 50 minutes4 AL Maximum of 1 minute2 Cycle 5 is the end of the load schedule for a temporary tieback. Adjust to the lock -off load of 0.80 P (or as specified in the contract documents) Permanent Tieback AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 1.00 P Maximum of 1 minute2 Maximum of 1 minute2 1.25 P Maximum of 1 minute2 60 minutes 1.00 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 Permanent Tieback AL Maximum of 1 minute2 Maximum of 1 minute2 0.25 P Maximum of 1 minute2 Maximum of 1 minute2 0.50 P Maximum of 1 minute2 Maximum of 1 minute2 1.00 P Maximum of 1 minute2 Maximum of 1 minute2 1.25 P Maximum of 1 minute2 Maximum of 1 minute2 1.50 P (Load Hold) 10 minutes (or 60 minutes depending on total movement5) 300 minutes AL Maximum of 1 minute2 Maximum of 1 minute2 Adjust to the lock-off load of 0.80 P (or as specified in the contract documents)
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2The load shall be held at each increment just long enough to obtain the total movement reading but no longer than 1 minute. 3Creep tests determine the long -term load carrying capacity of a grouted tieback. This test is not applicable to temporary tiebacks. 4The load hold portion of the performance test for a temporary tieback is a test load of 1.33 P, which shall be held constant for 50 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A loa d cell shall be used to monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 0, ½, 1, 2, 5, 10, 30, and 50 minutes. If the total movement between 1 minute and 10 minutes is less than 0.04 in. , the temporary tieback will be accepted and the test may be terminated without taking the 30 and 50 minute readings. 5The load hold portion of the performance test for a permanent tieback is a test load of 1.50 P, which shall be held constant for 10 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used to monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 1 minute, 2, 3, 4, 5, 6, and 10 minutes. If t he total movement between 1 minute and 10 minutes exceeds 0.04 in., the test load shall be held for an additional 50 minutes. Total movements shall be recorded at 15, 20, 25, 30, 45 and 60 minutes. The Contractor shall plot the tendon movement versus load for each load increment. He shall also plot the creep movement for the load hold as a function of the logarithm of time.
211-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 0.75 P Maximum of 1 minute2 1.00 P Maximum of 1 minute2 1.25 P Maximum of 1 minute2 Load Hold3,4 Permanent Tieback 1.50 P 10 minutes (or 60 minutes depending on total movement3) Temporary Tieback 1.33 P 5 minutes (or 50 minutes depending on total movement4) Adjust to the lock -off load of 0.80 P (or as specified in the contract documents) 1P = Design Load AL = Alignment Load. The AL necessary to maintain position of the stressing and testing equipment shall not exceed 0.05 P. Set dial gauges to “zero” after the alignment load has been applied. 2The load shall be held at each increment just long enough to obtain the total movement reading but no longer than 1 minute. 3The load hold portion of the proof test for a permanent tieback is a test load of 1.50 P, which shall be held constant for 10 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used to monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 1 minute, 2, 3, 4, 5, 6, and 10 minutes. If the total movement between 1 minute and 10 minutes exceeds 0.04 in., the tes t load shall be held for an additional 50 minutes. Total movements shall be recorded at 15, 20, 25, 30, 45 and 60 minutes. 4The load hold portion of the proof test for a temporary tieback is a test load of 1.33 P, which shall be held constant for 5 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used to monitor the constant load. Total moveme nts with respect to an independent fixed reference point shall be recorded at 0, ½, 2, and 5 minutes. If the total movement between ½ minute and 5 minutes exceeds 0.08 in., the test load shall be held for an additional 45 minutes. Total movements shall be recorded at 10, 15, 20, 25, 30, 40 and 50 minutes. The Contractor shall plot the tendon movement versus load for each load increment. He shall also plot the creep movement for the load hold as a function of the logarithm of time.
211-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. All tiebacks and components shall be free of detrimental corrosion.
211-4 Method of Measurement .
211-4.01 Soil Nail Wall System. A SNWS will be measured in square feet of face area measured in a
vertical plane between the payment lines shown in the contract documents.
211-4.02 Grouted Tieback System. A GTS will be measured by the number of grouted tiebacks
installed.
211-4.03 Grouted Tieback Creep Test. A GTS Creep Test will be measured by the number of tests
performed. f s P P = P 5.0 5.1 5.1 +
211-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 211-5 BASIS OF PAYMENT .
211-5.01 Soil Nail Wall System. The unit bid price shall include the cost of all labor, materials, and
equipment required to satisfactorily complete the work including the wall drainage network, the temporary shotcrete construction facing and preproduction verification tests, verification tests, and proof tests of the soil nails along with successful completion of quality assurance tests indicating that the material conforms to the specification. Excavation will be paid for separately to the temporary shotcrete - soil interface and to the limits shown in the contract documents. Permanent wall facing will be paid for separately.
211-5.02 Grouted Tieback System. The unit bid price shall include the cost of all labor, materials, and
equipment required to satisfactorily complete the work including performance tests, proof tests, lift -off readings and lift -off tests of the tiebacks along with successful completion of quality assurance tests indicating that the material conforms to the specification. For tiebacks which do not meet all the acceptance criteria but do meet the conditional acceptance criteria, the original tieback and any required supplemental tiebacks(s) are, in sum, considered to be one tieback for payment purposes. No payment will b e made for any additional wall connections required for installation of supplemental tiebacks. Permanent wall facing will be paid for separately.
211-5.03 Grouted Tieback Creep Test. The unit bid price shall include the cost of all labor, materials,
and equipment required to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 211.01 Soil Nail Wall System (Temporary) Square Feet 211.02 Soil Nail Wall System (Permanent) Square Feet 211.10 Grouted Tiebacks (Temporary) Each 211.11 Grouted Tiebacks (Permanent) Each 211.12 Creep Test for Grouted Tiebacks Each SECTION 212 – ROCK SLOPE REINFORCEMENT AND CATCHMENT SYSTEMS (Last Revised January 2019)
212-1 DESCRIPTION. This work shall consist of furnishing and installing rock slope stabilization
techniques or roadside protective measures in conformance with payment lines, type, size, and at the locations specified in the contract documents.
212-1.01 Definitions.
212-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 and rock fallout area. The catchment area width is the horizontal distance between the roadway edge of pavement and the base (toe) of a rockslope.
212-2 Materials .
212-2.01 Wire Rope Rock Catchment Fence . The rock catchment fence system, as obtained from the
manufacturer, shall have a tested capability of retaining a rock impact of 155 kip -ft of kinetic energy. The result of demonstration tests shall be furnished as required by the Engineer.
212-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-2.02 Chain Link Rock Catchment Fence .
212-02 Chain Link Rock Catchment Fence .
212-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. Turnbuckles. Provide galvanized steel turnbuckle cable end assemblies conforming to the requirements of §710 -22 Cable Guide Railing and as shown in Detail G of the Standard Sheet
212-02 Chain Link Rock Catchment Fence .
212-2.03 Wire Mesh Slope Protection .
212-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-2.04 Wire Mesh Drape .
212-2.05 Temporary Rock Catchment Barrier.
212-2 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 The precast concrete barrier units shall form a smooth and continuous barrier when joined together. Any sections damaged or misaligned while in service shall be corrected or replaced.
212-2.06 Move Temporary Rock Catchment Barrier . None Specified.
212-3 Construction Details .
212-3.01 Wire Rope Rock Catchment Fence . Assemble the wire rope rock catchment fence as detailed
on the Standard Sheet 212 -01 Wire Rope Rock Catchment Fence . Submit to the Engineer for approval not less than two weeks prior to the installation of the wire rope rock catchment fence. Do not begin work prior to approval. Provide the following:
212-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Proposed anchor installation procedure including grout placement procedures, grouting equipment, and the procedure for setting the wire rope anchor centralizers.
212-3.02 Chain Link Rock Catchment Fence . Assemble the chain link rock catchment fence as detailed
on the Standard Sheet 212 -02 Chain Link Rock Catchment Fence . Install galvanized No. 11 steel rebar posts in 2 in. diameter vertical holes drilled to a minimum depth of 2 ft. into rock. Post spacing shall be 8 ft. Pour a sufficient amount of concrete grouting material into the hole before inserting the post to allow overflow after insertion. Install anchor angles for terminal sections. The location of the anchor angles shall be in line with the corresponding fence section and shall be determined by the angle (60° minimum) between the top longitudinal cable and the end post. The angle between a ny longitudinal cable and the end post shall not exceed 90°. Drill bolt holes for anchor angles into the rock spaced 16 in. on -center to a depth of 4 ft. The bolt hole diameter shall be compatible with the bolt/drill hole/resin cartridge diameter, as recom mended by the bolt manufacturer, but in no case shall the bolt hole diameter exceed the resin cartridge diameter by more than 3/8 in. Install the anchor angle within 90°± 15° to the axis of the rock bolt and in intimate contact with the rock surface for it s entire contact area.
212-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Applying a special mix supplied by the bolt manufacturer for leveling purposes.
212-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Bottom of fence fabric shall be in contact with the ground surface. Add fence fabric material as necessary. Added material shall be overlapped a minimum of four chain link rows. Tie both ends of the overlap at 1 ft. intervals, or as approved by the Enginee r. Attach tie -back cables on uphill side of rebar posts after longitudinal cables have been tightened and chain link fence fabric has been installed. Tie -back cables shall have a maximum sag of ¾ in. measured at the center.
212-3.03 Wire Mesh Slope Protection . Assemble the wire mesh slope protection as detailed on the
Standard Sheet 212 -03 Wire Mesh Slope Protection . Design the grouted wire rope anchors so that the design load (P) is at least equal to 30 kips. Submit shop drawings to the Engineer for approval not less than two weeks prior to the installation of the wire mesh slope protection. Do not begin work prior to approval.
212-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 TABLE 212 -1 WIRE MESH SLOPE PROTECTION PROOF TEST LOAD SCHEDULE Load1 Observation Period AL Minimum of 1 minute2 0.25 P Minimum of 1 minute2 0.50 P Minimum of 1 minute2 0.75 P Minimum of 1 minute2 1.00 P Minimum of 1 minute2 1.25 P Minimum of 1 minute2 1.50 P (Load Hold)2 10 minutes (or 60 minutes depending on total movement3) 1P = Design Load AL = Alignment Load. The AL necessary to maintain position of the stressing and testing equipment shall not exceed 0.05 P. Set dial gauges to “zero” after the alignment load has been applied. 2Hold each load increment, except for the 1.5 P load, until the deflection stabilizes. 3The load hold portion of the proof test is a maximum test load of 1.50 P, which shall be held constant for 10 minutes. The load hold time shall start when the pump begins to load the anchor from the 1.25 P load to the test load. A load cell shall be used t o monitor the constant load. Total movements with respect to an independent fixed reference point shall be recorded at 1 minute, 2, 3, 4, 5, 6, and 10 minutes. If the total movement between 1 minute and 10 minutes exceeds 1/24 in., the test load shall be held for an additional 50 minutes. Total movements shall be recorded at 15, 20, 25, 30, 45 and 60 minutes. No part of the temporary yoke or load frame shall bear within 3 ft. of the anchor. Plot the movement versus load for each increment. An anchor will be accepted by the Engineer if the creep rate at 1.5P does not exceed 1/24 in. between the 1 and 10 minute readings or for a load hold time of 60 minutes, the creep rate does not exceed 1/12 in. per log cycle of time. If an anchor fails the proof test, install a new anchor at no cost to the State.
212-3.04 Wire Mesh Drape . Assemble the wire mesh drape as detailed on the Standard Sheet 212 -04
Wire Mesh Drape . Install untensioned resin rock bolts at the top of the rockslope on 50 ft. centers (maximum) or as shown in the contract documents. Proof test the first rock bolt per resin lot number to 20 kips in accordance with §212 -3.03 B. Anchor Testing. Place ¾ in. diameter guide rail cable horizontally across the top of the rock slope, secured by 1 ¼ in. diameter resin rock bolts. Maintain a minimum cable sag of 2 ft. to 3 ft. between rock bolts. Do not draw cable taut. Splices of the guide rail cable wi ll not be allowed. Fold the mesh over or under the guide rail cable a minimum of 1 ft. and connect the horizontal lap with galvanized tie wire with a continuous weave through each of the mesh openings. Install the wire mesh in vertical strips, each lapped over the other by a minimum of 1 ft. Connect the adjacent vertical strips by either a continuous weave of galvanized tie wire along the edge of the outer mesh strips only, or with hog rings or metal tie s on a 6 in. staggered pattern along the edges of both panels. When used, overlay horizontal laps a minimum of 1 ft. and connect with a continuous weave of galvanized tie wire along the edge of the upper mesh strip. Install the wire mesh to cover the area of rock face identified in the contract documents. Repair all damaged galvanized surfaces in accordance with §719 -01 Galvanized Coatings and Repair Methods .
212-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-3.05 Temporary Rock Catchment Barrier . Assemble and maintain the temporary rock catchment barrier as detailed on the Standard Sheet 212 -05 Temporary Rock Catchment Barrier .
212-3.06 Move Temporary Rock Catchment Barrier . Move and reset the temporary rock catchment
barrier in accordance with the requirements of §212 -3.05 Temporary Rock Catchment Barrier.
212-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-4 METHOD OF MEASUREMENT .
212-4.01 Wire Rope Rock Catchment Fence . Wire rope rock catchment fence will be measured as the
number of linear feet of fencing, measured from center -to-center of end posts.
212-4.02 Chain Link Rock Catchment Fence . Chain link rock catchment fence will be measured as the
number of linear feet of fence, measured along the top of the fence between the terminal posts. An allowance of 10 linear feet will be added for each terminal section anchorage and for each intermedia te section anchorage installed.
212-4.03 Wire Mesh Slope Protection . Wire mesh slope protection will be measured as the number of
square feet of rock face satisfactorily covered. No measurement will be made of wire mesh used in any overlap.
212-4.04 Wire Mesh Drape . Wire mesh drape will be measured as the number of square feet of rock face
satisfactorily covered. No measurement will be made of wire mesh used in any overlap.
212-4.05 Temporary Rock Catchment Barrier . Temporary rock catchment barrier will be measured as
the number of linear feet of barrier, measured along the centerline of the uppermost concrete barrier surface, from one end anchor to the other.
212-4.06 Move Temporary Rock Catchment Barrier . Moving temporary rock catchment barrier will
be measured as the number of linear feet of barrier moved, measured along the centerline of the uppermost concrete barrier surface, from one end anchor to the other.
212-5 Basis of Payment .
212-5.01 Wire Rope Rock Catchment Fence . The unit price bid per linear feet for wire rope rock
catchment fence shall include the costs of furnishing all labor, material and equipment necessary to complete the work.
212-5.02 Chain Link Rock Catchment Fence . The unit price bid per linear feet for chain link rock
catchment fence shall include the costs of furnishing all labor, material and equipment necessary to complete the work.
212-5.03 Wire Mesh Slope Protection . The unit price bid per square feet for wire mesh slope protection
shall include the costs of furnishing all labor, material and equipment necessary to complete the work, including anchor testing and disposal of any material removed from the slope.
212-5.04 Wire Mesh Drape . The unit price bid per square feet for wire mesh drape shall include the
costs of furnishing all labor, material and equipment necessary to complete the work, including anchor testing and disposal of any material removed from the slope.
212-5.05 Temporary Rock Catchment Barrier . The unit price bid per linear feet for temporary rock
catchment barrier shall include the costs of furnishing all labor, material and equipment necessary to erect, maintain, and remove the required barrier, including any required connection devices, end treatments, delineation or guiding devices, and devices for pinning and connecting temporary precast concrete barrier units. After placement, 90% of the item unit price will be paid. The remaining 10% will be paid when the rock catchment barrier has been removed.
212-5 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 212-5.06 Move Temporary Rock Catchment Barrier . The unit price bid per linear feet for moving temporary rock catchment barrier shall include the costs of furnishing all labor, material and equipment necessary to remove, transport, erect, and maintain the required barrier, including any required connecti on devices, end treatments, delineation or guiding devices, and devices for pinning and connecting temporary precast concrete barrier units. Movements necessary to maintain, realign, or replace damaged units will not be considered as moving temporary rock catchment barrier and shall be done at no additional cost to the State. Payment will be made under: Item No. Item Pay Unit 212.0106 Wire Rope Rock Catchment Fence (Medium Impact – 6 ft.) Feet 212.0108 Wire Rope Rock Catchment Fence (Medium Impact – 8 ft.) Feet 212.0110 Wire Rope Rock Catchment Fence (Medium Impact – 10 ft.) Feet 212.0112 Wire Rope Rock Catchment Fence (Medium Impact – 12 ft.) Feet 212.0201 Chain Link Rock Catchment Fence Feet 212.0202 Vinyl Coated Chain Link Rock Catchment Fence Feet 212.03 Wire Mesh Slope Protection Square Feet 212.04 Wire Mesh Drape Square Feet 212.0501 Temporary Rock Catchment Barrier (10 ft.) Feet 212.0502 Move Temporary Rock Catchment Barrier (10 ft.) Feet SECTIONS 213 THRU 299 (VACANT)
302-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Section 300 BASES AND SUBBASES SECTION 301 (VACANT) SECTION 302 - BITUMINOUS STABILIZED COURSE
302-1 DESCRIPTION. This work shall consist of furnishing and placing a course of bituminous
stabilized granular material and stabilized reclaimed asphalt pavement shoulder in conformance with this specification, the payment lines, and typical sections shown on the plans or as specified by the Engineer.
302-2 Materials .
302-2.01 General.
302-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 302-2.02 Tests and Control Methods. Materials tests and quality control methods pertaining to the work of this Section will be performed in conformance with the procedures contained in the appropriate Department publications which are current on the date of advertisement for bids. These publications are availab le upon request to the Regional Director or the Director, Geotechnical Engineering Bureau.
302-2.03 Granular Material Requirements for Options A and C. All borrow sources of granular
materials for Options A and C shall be managed in accordance with the applicable provisions of Section 203, Borrow .
302-3 Construction Details .
302-3.01 Weather Limitations for Option A. This work will not be permitted on a subbase or subgrade
containing frost, nor when the temperature of the surface on which the mixture is to be placed is below 45°F . All material placed under this section during any calendar year shall be mixed after March 1 of that year. No material shall be placed from the last Saturday of September to May 15, except with written permission of and under such special limitations and conditions as may be imposed by the Deputy Chief Engineer (Tec hnical Services).
302-3.02 Equipment for Mixing Option A. All equipment for this work shall be subject to approval of
the Engineer at all times. No work under this section will be permitted until all equipment and the processing facilities are established, inspected and approved. Mixing shall be done with a rotating paddle shaft pugmill, providing suitable pressure -kneading action in mixing. Mixing by blading, shoveling and/or scooping will not be permitted. The materials shall be mixed either at a central twin shaft pugmill mixing plant by the plant mix method, or on the roadbed (or some other area approved by the Engineer) by a traveling twin shaft pugmill, whichever equipment the Contractor elects to use. The mixer shall be either a continuous or a batch type pugmill, designed to accurately proportion either by volume or by weight, so that when the granular material and bituminous material are incorporated in the mix, a thorough and uniform coating of the granu lar material will result. The pugmill mixer shall be provided with weighing, volumetric or other gauging equipment which shall be capable of providing accurate control at all times of the amount of granular material entering the mixer per time interval. Th e mixer shall be equipped to mechanically interlock the bituminous feed with the granular material feed, such that uniformity of the mixture is assured at all times. A water pump with meter shall be available to add water to the granular material, just pri or to the addition of the bituminous material. The mixer shall be equipped with a positive displacement meter for totalizing the quantity of
302-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 bituminous material applied to the mixing chamber. A by -pass valve shall be placed on the bituminous line between the positive displacement meter and the spray bar in the pugmill to permit determination of the accuracy of the positive displacement meter. T he Contractor shall furnish a clean 55 gallon drum having one end completely open, and a length of flexible hose to permit filling from the by -pass valve on the bituminous line. Traveling pugmill mixing equipment shall not be operated at speeds greater than those recommended by the manufacturer for the depth of treatment and quantity of material used. Where the materials are mixed at a central twin shaft pugmill mixing plant, the pugmill mixing chamber shall extend at least 4 feet beyond the last point where the granular material, binder, and water are fed into the mixer, so that all materials will be completely and thoroughly mixed in the pugmill for a distance of at least 4 feet . The pugmill paddles shall be of a type adjustable for angular position on the shaft, and shall be reversible to allow retardation of the flow of the mixer, in order to control the mixing time. A dam or baffle, if approved in writing by the Director, Geotechnical Engineering Bureau may be used for the purpose of retarding flow. A mechanically operated discharge hopper of at least 1 cubic yard capacity shall be provided. Sufficient clearance for a ten wheel dump truck shall be provided beneath the discharge hopper to permit calibration.
302-3.03 Stockpiling and Sampling for Option A. Before mixing with the bituminous material, the
granular material shall be stockpiled, sampled and tested for approval as stipulated in §302 -2.02.
302-3.04 Mixing for Option A. The proportion of bituminous material that shall be mixed with the
granular material will range between 16 and 19 gallons per cubic yard , loose (uncompacted) measure. The actual proportion within this range, however, shall not be less than that determined by the Geotechnical Engineering Bureau and specified by the Engineer after the stockpiled granular material is sampled and tested. In com puting the rate of application, the loose measure volume shall be determined by level filling a truck, having a minimum capacity of 8 cubic yards , with granular material. No mixing will be allowed until the temperatu re of the granular material is 45°F or higher. The moisture content of the granular material, based on the material passing 3/4 inch sieve, just prior to the addition of the bituminous material, shall be in the range of 4 to 8 percent. The acceptable moisture content within this range shall be determined by the Engineer. All granular material removed from stockpiles for introduction into continuous twin shaft or traveling twin shaft pugmill mixers shall be by side excavation for the full height of the stockpile unless otherwise approved in writing by the Director, Geotechn ical Engineering Bureau. If mixed in a traveling plant, the method of transporting and introducing granular material from approved stockpiles into the mixer shall be as approved by the Engineer. The application temperature of the bituminous material shall be designated by the Engineer and be within the range of 130°F to 170°F. After the granular material and bituminous material have been introduced into the pugmill, the mixing shall continue for a length of time necessary to uniformly coat the particles and to obtain a homogeneous mixture. The discharge gates in a central plant shall not remain open during production of the stabilized mixture and shall only be opened in order to empty the hopper after the hopper becomes full. The discharged mixture may be immediately transported directly to the grade or stockpiles for later use. The material shall be transported to the stockpile by dump truck haul. If the Contractor wishes to utilize a method other than dump truck haul to construct stockpiles, a request shall be submitted to the Director, Geotechnical Engineering Bureau. The reque st shall include the proposed method and type of equipment to be used. Approval, if granted, will be based on the opinion of the Director, Geotechnical Engineering Bureau as to the capabilities of the proposal to provide a stockpile of uniformly mixed, uncontaminated material. If granted, such a waiver will remain in force on ly so long as all conditions for which the waiver is granted remain unchanged and a satisfactory material results.
302-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2
302-3.05 Transporting, Spreading, Compacting and Finishing of Option A. If a central mixing plant
is used, the mixture shall be transported from the mixing plant or stockpiles to the point of use in pneumatic tired vehicles, having tight bodies previously cleaned of all other materials. Approved mechanical spreading equipmen t shall be used for placing. The mixture shall be spread in a thickness sufficient to produce the final compacted thickness shown on the plans. The maximum compacted thickness of any layer shall not exceed 4 inches . After spreading, the mixture shall not be compacted until properly cured. Adequate curing shall be the responsibility of the Contractor, who shall take into account all factors, including weather and time of the year. Material that cannot be properly and a dequately compacted to a stable condition shall be removed and replaced at no expense to the State. Compaction of the course shall be in accordance with the applicable provisions of §40 4-3.07, Compaction. Successive layers shall not be placed until the underlying layer has been satisfactorily compacted and approved by the Engineer.
302-3.06 Traffic. The movement of highway traffic and construction equipment over this course may be
permitted at locations designated by and in a manner under such restrictions as are ordered by the Engineer. Any damage occurring to the course as a result of traffic shal l be repaired at no expense to the State as ordered by the Engineer.
302-3.07 Care of Adjoining Pavement. Where this course constitutes a base course for a shoulder, the
Contractor shall organize the work and conduct the various operations so as to keep the surface of the adjacent pavement clean at all times, or shall bear the full expense of cleaning the pa vement as ordered by the Engineer.
302-3.08 Tolerance. Where used as a base course supporting other pavement courses, the final surface
elevation of this course shall not vary more than 1/4 inch above or below the design grade elevation at any location. Where used as a shoulder base course, the surface elevation of this course shall not vary more than 1/4 inch above or below, true grade at any location.
302-3.09 Maintenance. The Contractor shall be required to maintain the bituminous stabilized course in
good condition and in a manner satisfactory to the Engineer from the time work is begun until all work has been completed and accepted. Maintenance by the Contractor shall i nclude immediate repairs of any defects, regardless of cause, that may occur.
302-3.10 Repairs. Repairs to the bituminous stabilized course shall be made in a manner that will assure
restoration of a uniform surface and durability of the part repaired. A stabilized course that is either faulty, damaged or with low areas shall be repaired by replacing the stabilized course material to the full depth of treatment. When the extent of damage is essentially at the surface of the course and where the areas are low, the Contractor may elect to repair the course with a surface application of an approved, suitable, top course bituminous concrete mix, in lieu of a full depth material replacement.
302-4 METHOD OF MEASUREMENT. The quantity of Bituminous Stabilized Course to be measured
for payment, will be the number of cubic yards of compacted material computed from the payment lines shown on the plans, the specifications, or as ordered by the Engineer.
302-5 BASIS OF PAYMENT. The unit price bid per cubic yard shall include the cost of furnishing all
labor, materials and equipment, including bituminous material and water necessary to complete the work. Any work by the Contractor required for the maintenance or repair of bituminous stabilized course prior to acceptance of the contract, shall be done at the Contractor's expense.
304-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Payment will be made under: Item No. Item Pay Unit 302.01 Bituminous Stabilized Course Cubic Yard SECTION 303 (VACANT) SECTION 304 - SUBBASE COURSE
304-1 Description .
304-1.01 General. The work consists of furnishing, placing and compacting a subbase course of the
specified type in conformity with the lines, grades, thicknesses and typical sections shown in the contract documents.
304-1.02 Optional Type. When the Optional Type subbase item is specified, select any of the four (4)
options as follows:
304-1.03 Definitions. Deleterious: Any material that does not consist of concrete, asphalt, glass, brick,
stone, sand, gravel, blast furnace slag, or other materials deemed acceptable, when these materials are used in subbase in conformance with the specification requirements, OR any material which will adversely affect the performance of the product either during handling, during construction, or in its final application.
304-2 MATERIALS. Provide subbase material meeting the requirements of §733 -04 Subbase Course.
Provide a subbase material meeting the specification requirements and is within the Contractor’s capabilities to place and fine grade to the required tolerances. Should the subbase course become unstable at any time prior to the placement of the overlying course, correct the unstable condition at no additional cost to the State. Perform any required modification prior to placing the material on the grade. RAP will not be allowed as an acceptable alternate to Types 1, 3 and 4 at intersection locations or in areas with a high percentage of truck traffic as shown in the contract documents, unless Portland Cement Concrete pavement is to be installed as part of the pavement structure. A high percentage of trucks is defined to be 10% or more. For interstates and other freeways, a DDHV of 250 vph is used to indicate a high percentage of trucks.
304-3 Construction Details .
304-3.01 General. Notify the Engineer in writing of which placement option, material option (if
applicable) and/or material type is proposed for use, at least 14 calendar days prior to performing the work. If it is proposed that more than one option or type is to be used, s ubmit a plan to the Engineer describing where each option or type is proposed for use. This plan must be approved by the Engineer prior to incorporating it into the project. The State reserves the right to disapprove the use of more than
304-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 one option on a project. Use uniform subbase types and materials within the limits of the roadbed as defined in §101 -02 Definition of Terms .
304-3.02 Placement .
304-3.03 Compaction. When the moisture content is within the limits for proper compaction, compact
the material in accordance with the requirements of §203 -3.03 C. Compaction . Density tests are not required for the acceptance of these courses. If a subbase course is disturbed by frost action prior to paving, re -compact the subbase.
304-3.04 Traffic and Contamination. The movement of highway traffic over the final surface of the
subbase may be permitted at locations designated by, and under such restrictions as shown in the contract documents, provided such movements take place prior to the final finishing of this cours e to the specified tolerance. Do not allow highway traffic to move over subbase containing glass. The movement of construction equipment on this course may be permitted at locations designated by and under such restrictions as ordered by the Engineer. At l ocations where permission is granted for such movement, place and maintain the temporary surface of the course, upon which the construction traffic is running, at least 2 in. above the final surface of the course. Just prior to paving and after all constru ction traffic not required for the removal has ceased, remove the 2 in. protective layer, and prepare and compact the exposed surface of the course to the specified tolerance. No payment will be made for furnishing, placing, maintaining, removing and disposing of the 2 in. thick protective layer. Include the cost thereof in the price bid for Subbase Course.
304-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 If the subbase is damaged or mixed with the subgrade or any other material due to the Contractor’s operation, remove such material and replace it with the appropriate subbase material at no additional cost to the State.
304-3.05 Tolerance. Place Types 1, 2 or 4 so that after compaction the top surface of the course does not
extend more than ¼ in. above nor more than ¼ in. below true grade for the course at any location. Place Type 3 course so that the finished surface does not extend above t he true grade and surface for this course at any location.
304-4 Method of Measurement .
304-4.01 Subbase Course. The quantity is the number of cubic yards of material, computed from
payment lines shown in the contract documents.
304-5 Basis of Payment .
304-5.01 Subbase Course. The unit price bid for this work includes the cost of furnishing all labor,
material and equipment necessary to complete the work. Include the cost of adding water in the price bid unless the item for applying water is included in the contract. No direct p ayment will be made for losses of material resulting from compaction, foundation settlement, erosion, or any other cause. No deductions will be made for the volumes occupied by manholes, catch basins and other such objects. No additional payment will be made for the protective layer, as stated in 304 -3.04. Progress payments will be made after the subbase course has been properly placed and compacted. Payment will be made at the unit price bid for 75% of the quantity. The balance of the quantity will be paid for after the final finishing to the required toler ance and just prior to the placing of the next course. Payment will be made under: Item No. Item Pay Unit 304.11 Subbase Course, Type 1 Cubic Yards 304.12 Subbase Course, Type 2 Cubic Yards 304.13 Subbase Course, Type 3 Cubic Yards 304.14 Subbase Course, Type 4 Cubic Yards 304.15 Subbase Course, Optional Type Cubic Yards SECTIONS 305 AND 306 (VACANT) SECTION 307 - HYDRATED LIME STABILIZED SUBGRADE
307-1 DESCRIPTION. Hydrated lime stabilized subgrade shall consist of the in -place subgrade soil
mixed uniformly with hydrated lime and moistened, compacted and cured in accordance with these specifications, the plans and as specified by the Engineer.
307-2 Materials .
307-2.01 Lime Stabilization. Materials for lime stabilization shall meet the requirements of the
following: Water 712-01 Hydrated Lime 712-04
307-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Hydrated lime which has slaked prior to mixing, for any reason, shall not be incorporated in the work.
307-2.02 Surface Treatment. When a surface treatment is required to protect the completed lime
stabilized course as specified in §307 -3.11, the materials for surface treatment shall meet the following requirements: Asphalt Emulsion - (RS-2) 702-3101 Coarse Aggregate - 1A size 703-02
307-3 Construction Details .
307-3.01 Equipment. No work will be permitted until all necessary equipment is on hand, inspected and
approved by the Engineer.
307-3.02 Weather Limitations. Lime stabilization of the subgrade shall not be done when the subgrade
temperature is below 40°F , nor in the period from October 15 to May 15, except by written permission of and under such special limitations as set forth by the Deputy Chief Engineer (Technical Services). The hydrated lime shall not be mixed with frozen subgrade soil or when the sub grade contains frost. Lime shall not be applied when wind conditions, as determined by the Engineer, are such that blowing lime becomes objectionable or hazar dous to traffic, workers, and adjacent property owners.
307-3.03 Protection and Safety. Before lime is spread, the Contractor shall take necessary precautions
and provide necessary equipment to protect all personnel and adjacent properties from lime dust created by the lime application and mixing operations. Safety goggles and lightweight f ilter masks shall be provided by the Contractor to all working personnel and shall be worn at all times during these operations.
307-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 307-3.04 Preparation of Foundation. Prior to the addition of any lime to the subgrade, the area to be stabilized shall be graded and shaped in close conformity to the typical sections, lines and grades as shown on the plans or as specified by the Engineer. Where the depth of lime stabiliza tion exceeds 6 inches , the subgrade soil in excess of the 6 inches depth shall be removed, placed in windrows and processed as an additional lift.
307-3.05 Scarifying. The subgrade soil shall be scarified 6 inches deep to the width required for
stabilization. The scarified material shall be partially pulverized by making one pass through the area with a pulverizing rotary mixer. The pulverizing portion of the scarifying operation may be deleted in some areas, where , as determined by the Engineer, the subgrade soils are excessively wet and sticky so that pulverizing with a rotary mixer is impractical.
307-3.06 Application of Lime. The hydrated lime shall be applied to the scarified material by an
approved method and at the rate stipulated in the plans or as specified by the Engineer. A lime slurry, applied by an approved method and suitable equipment, will be permitted. Spreading equipment shall uniformly distribute the lime without excess loss. No equipment except that used for spreading and mixing shall be permitted to pass over the spread lime until it is mixed. The Engineer may require the spread l ime to be sprinkled with water to reduce dusting.
307-3.07 Primary Mixing. After the required amount of lime has been uniformly spread, it shall be
mixed into the subgrade to the full depth of treatment using a traveling rotary mixing machine or heavy plow. A minimum of three passes will be required to assure uniform incorporat ion of the hydrated lime. Water shall be added at the rate of up to 500 gallons/ ton of lime as required for the proper consistency. The primary mixing operation shall be completed within four hours after application of the lime. At this time, all of the lime shall be thoroughly and uniformly incorporated into the subgrade to the full depth of treatment in such a manner that the result is a homogeneous, friable mixture of subgrade soil and lime, free from clods or lumps exceeding 2 inches in size. Where the required depth of stabilization exceeds 6 inches , the windrowed material in excess of the 6 inches depth shall be spread to the requ ired lift thickness and processed, by the addition of lime and primary mixing, as specified for the first layer. Each additional layer, where required, shall be processed similarly. Immediately after the primary mixing operations are completed for the full depth of treatment, the surface of the subgrade shall be shaped and lightly sealed with a pneumatic tired or smooth steel wheel roller. The surface shall be crowned so as to proper ly shed water if rain occurs.
307-3.08 Curing. Following primary mixing operations, the stabilized course shall be allowed to cure
for at least 24 hours plus any additional time required for the lime to properly react with the subgrade soil. Curing periods in excess of 24 hours shall be as determine d and specified by the Engineer. During the curing period, the surface of the material shall be kept moist to prevent drying and cracking, and maintained in a properly sealed and crowned condition as specified by the Engineer.
307-3.09 Secondary Mixing. Immediately after the completion of the curing period, the stabilized
course shall again be completely mixed and pulverized to the full depth of stabilization by a rotary pulverizing mixer. Secondary mixing shall continue for at least three passes or un til, as determined by the Engineer, the material is properly mixed and blended. Adjustments in water content shall be made during the secondary mixing operation to obtain the proper moisture content required for compaction.
307-3.10 Compaction, Shaping and Finishing. Compaction of the mixture shall begin immediately
after completion of the secondary mixing operations and after the proper moisture content for compaction has been obtained. Compaction shall be in accordance with the requirements of Section 203, Compaction . After compaction and shaping, the surface of the course shall be finished -rolled by a smooth steel wheel tandem roller weighing between 8 to 10 tons. The secondary mixing, compaction,
307-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 shaping and finishing operations shall be completed within eight hours after the start of the secondary mixing. The surface of the finished stabilized subgrade course shall not extend above design grade at any location. The thickness of the complete hydrated lime stabilized subgrade will be determined from measurements made in test holes located at random intervals not to exceed 500 feet . The measured thickness shall not deviate from that shown on the plans or specified by the Engineer, by more than plus 1 1/2 inches or minus 1 inch . Areas of hydrated lime stabilized subgrade not meeting the specified thickness requirements shall be reconstructed. The subbase course material shall be placed and compacted within two days after the lime stabilized subgrade course has been compacted, shaped and finished at that location. The surface of the treated subgrade shall be kept continuously moist up to the ti me of subbase material placement.
307-3.11 Surface Treatment Option. The Contractor may elect to defer placement of the subbase
materials up to two weeks by placing a bituminous membrane, cationic asphalt emulsion, over the treated subgrade. The bituminous membrane must be placed within two days after the stabilized subg rade has been compacted and finished. The stabilized subgrade must be kept continuously moist prior to application of the bituminous membrane. The bituminous material shall be applied at a uniform rate of 0.2 gal/sy of treated subgrade. Where traffic is to operate on the treated subgrade, the bituminous membrane shall be chipped with a uniform coating of Size 1A aggregate applied at a rate of 15 lb/ sy of treated subgrade.
307-4 Method of Measurement .
307-4.01 Hydrated Lime Stabilized Subgrade. The quantity of hydrated lime stabilized subgrade to be
paid for will be the number of cubic yards of lime stabilized subgrade computed within the payment lines shown on the plans or otherwise specified in writing by the Engineer.
307-4.02 Furnishing and Applying Hydrated Lime. The quantity of hydrated lime to be paid for will
be the number of tons of hydrated lime furnished and applied. Lime that has slaked prior to application and additional lime applied because of reduced lime content resulting from excessive thickness of the lime stabilized layer will not be measured for payment.
307-5 Basis of Payment .
307-5.01 Hydrated Lime Stabilized Subgrade. The unit price bid per cubic yard shall include the cost
of furnishing all labor, equipment and materials necessary to complete the work, except that furnishing and applying water and hydrated lime will be paid for separately. No payment will be made for the asphalt emulsion or 1A stone chips, nor for any maintenance, repairs or reconstruction of the stabilized subgrade made before acceptance, nor for any losses of material which may result from compaction, erosion or any other causes.
307-5.02 Furnishing and Applying Hydrated Lime. The unit price bid for hydrated lime shall include
the cost of all material, labor and equipment necessary to furnish, store, handle and apply hydrated lime in accordance with these specifications. Payment will be made under: Item No. Item Pay Unit 307.01 Hydrated Lime Stabilized Subgrade Cubic Yard 307.02 Furnishing and Apply ing Hydrated Lime Ton
308-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 308 - SOIL CEMENT COURSE
308-1 DESCRIPTION. This work shall consist of furnishing and placing a course of Portland cement
stabilized soil in accordance with these specifications and in reasonably close conformance to the lines, grades, and typical sections shown on the plans or as ordered by the E ngineer.
308-2 MATERIALS. Materials used for this item shall conform to the following Sections of these
Specifications: Portland Cement, Type 2 701-01 Asphalt Emulsion (RS -2) 702-3101 Coarse Aggregate - 1A size 703-02 Water 712-01 Calcium Chloride 712-02 Soil shall be graded from coarse to fine, free of topsoil, organic matter, and substances deleterious to the normal hardening of the soil cement mixture, and shall be subject to the approval of the Engineer at all times. The soil will be sampled by the Eng ineer prior to use and submitted to the Geotechnical Engineering Bureau to determine both its suitability and the cement content to be used. Frozen soil or soil containing frost shall not be used. The soil material shall be stockpiled, sampled and tested before mixing in conformance with material tests and quality control methods contained in the appropriate Department publications which are current on the date of advertisement for bids. These publi cations are available upon request to the Regional Director or the Director, Geotechnical Engineering Bureau.
308-3 Construction Details .
308-3.01 Equipment. No work under this item will be permitted until all equipment and facilities
involved are established, inspected and approved by the Engineer. The materials shall be mixed in a central twin -shaft pugmill mixing plant or mixed on the roadbed by a traveling pugmill, whichever equipment the Contractor elects to use. Traveling pugmill mixing equipment shall not be operated at speeds greater than thos e recommended by the manufacturer for the depth of treatment and quantity of materials to be mixed. Where the materials are mixed in a central twin -shaft pugmill mixing plant, the mixing area of the pugmill shall extend at least 4 feet beyond the last point where the soil, cement, or water are fed into the mixer, so that all materials will be completely and thoroughly mixed in the pugmill for a distance of at least 4 feet . The paddles of the pugmill shall be adjustable for angular position on the shaft, and shall be reversible to retard the flow of mixture in order to control the mixing time. Where the ma terials are mixed at a central twin -shaft mixing plant, a hydraulically or mechanically operated discharge hopper of at least 1 cubic yard capacity shall be provided. Sufficient clearance for a ten -wheel dump truck shall be provided underneath the hopper. The central mixer shall be either a continuous or batch type pugmill, and shall be designed to accurately proportion the mix either by volume or by weight. The pugmill mixer shall be provided with weighing, volumetric or other gauging equipment, which shal l be capable of providing accurate control at all times of the amounts of soil and cement entering the mixer per time interval. The mixer shall be equipped with a method of mechanically interlocking the cement feed with the soil feed so that uniformity of the mixture will be assured at all times. A water pump and meter arrangement shall be available for addition of water to the soil and cement. The water supply line shall have a 90° T connection with a valve immediately downstream of the flow meter for cali bration purposes. The meter shall be calibrated at least once a year under the direction of Department personnel.
308-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 A smooth steel wheel roller and a self -propelled pneumatic tired or self -propelled vibratory compactor shall be used for compaction. The minimum number of passes shall be determined by the Engineer, after field tests, and shall be such as to produce the sp ecified minimum density for the full depth of the course. Cleated or tracked equipment will not be permitted on the soil cement course. In areas inaccessible to pneumatic tired compactors, or where maneuvering space is limited, impact rammers and/or vibrat ory equipment may be used provided the required density is obtained. Equipment suitable for storing, handling, weighing, measuring, proportioning, controlling and applying or spreading the cement shall be used. Equipment suitable for accurately metering, controlling and applying the water shall be used. If a pugmill mixer is used, all necessary water for mixing shall be added in the pugmill. If a rotary mixer is permitted and used, water for mixing shall be added through a spray bar in the mixing chamber.
308-3.02 Weather Limitations. Soil Cement Course shall not be placed between October 15 and May
15 nor when the a ir temperature in the shade is 40°F or lower. Soil cement course shall not be placed upon a frozen surface.
308-3.03 Preparation of Foundation. Before soil cement operations are begun, the area upon which the
soil cement course is to be placed shall be graded, shaped, and compacted as required in conformance with the grades, lines, thicknesses and typical sections shown on the plans or as ordere d by the Engineer. The subgrade and any preceding course shall be compact and suitable to support the construction and compaction equipment without settlement or displacement. Soft or yielding subgrade shall be corrected and made stable before the soil cement course is place d.
308-3.04 Application of Calcium Chloride and Cement. Where required by a Special Note in the
Proposal , the specified quantity of calcium chloride ordered by the Engineer in flake form shall be uniformly added to the soil before adding the cement. Portland cement, in the amount ordered by the Engineer, shall be added uniformly to the soil material. The amount of cement ordered by the Engineer will range generally between 8 percent and 10 percent by weight. The percentage of moisture in the soil, at the time of cement application, shall not exceed the quantity that will permit a uniform mixture of soil and cement during mixing operations and shall not exceed the optimum moisture content for the soil cement mi xture, as determined by the Engineer. Where a traveling pugmill mixer is used, cement that has been displaced or removed from the windrow regardless of cause, shall be replaced before mixing is started, at the Contractor's expense.
308-3.05 Mixing and Spreading. Immediately prior to mixing, the soil shall have a minimum
temperature of 40°F . After the cement has been applied to the soil, it shall be immediately mixed with the soil. Mixing shall continue until the cement has been thoroughly blended with the soil to prevent the formation of cement balls when the water is applied. Immediately a fter the soil and cement have been thoroughly mixed, the full amount of water shall be applied uniformly and mixing shall be continued until an intimate an d homogeneous blend of soil, cement and water has been obtained. When water application and mixing have been completed, the percentage of moisture in the mixture based on oven -dry weights, shall not be below, nor more than 2 percent above, the specified optimum moisture content determined by the Engineer. In order to minimize segregation of the mix, the discharge gates shall be kept closed until the hopper is filled to at least one -half of its capacity. After the hopper is emptied, the gates shall be closed until the hopper is refilled. The material shall then be disc harged into clean trucks and transported directly to the grade. The soil cement shall be spread on an accepted subgrade or preceding course immediately after mixing. If mixed in a central plant, approved mechanical spreading equipment shall be used and not more
308-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 than 30 minutes shall elapse between the time of mixing the cement and the start of the compaction operation. In case of rain between the time of adding cement and final finishing, the Engineer shall be the sole judge of what areas involved are satisfactory and what areas are not acceptable. Areas not acceptable to the Engineer shall be removed to the full depth o f the soil cement course and properly replaced at the Contractor's expense for all labor, materials and equipment involved.
308-3.06 Compaction. Prior to the beginning of compaction, the mixture shall be in a loose condition
for its full depth on the subbase course. As an immediate continuation of mixing operations, and after an initial breakdown pass with a smooth steel wheel roller, the loose mixture then shall be uniform ly compacted, by a self -propelled pneumatic tired or self propelled vibratory compactor, to the specified density. All areas and portions of this course shall be thoroughly and uniformly compacted for the full thickness of the course to a minimum dry densi ty of 95 percent of the maximum density. During compaction, water shall be applied to the surface as determined and ordered by the Engineer, to maintain the optimum moisture content.
308-3.07 Finishing. During the compaction operations, shaping will be required to obtain the required
surface and cross -section. During shaping operations it may be necessary to lightly scarify and broom - drag the surface in order to remove ridges or depressions in excess of the permitted tolerance. The resulting surface shall then be rolled with a smooth steel wheel roller, weighing not less than 10 tons , or pneumatic tire rollers, or both. The final rolling shall be done by a smooth steel wheel roller. Several applications of water may be required to keep the surface at the proper moisture content, as ordered by the Engineer, during the finishing operation. Water shall be applied by the pressure spray bar method. Compaction and finishing shall be done in such a manner as to produce, in not longer than 2 1/2 hours after completion of mixing, a smooth, dense surface, free of surface compaction planes, cracks, ridges or loose material. Immediately after rolling, the surface of the course shall be tested for trueness, transversely and longitudinally. The finished surface of the course shall not extend above, nor be greater than 1/2 inch below, true grade and surface at any location. Surface finishing shall be completed in daylight hours. Any portion of this course which has a density less than that specified shall be corrected or removed and replaced to its full depth to meet these specifications, at the Contractor's expense.
308-3.08 Construction Joints. At the end of each day's construction, a straight transverse and/or
longitudinal construction joint shall be formed by cutting back into the completed work to form a true vertical face, which shall be properly maintained until the abutting section is com pleted.
308-3.09 Curing and Surface Treatment. After the soil cement course has been finished as specified
herein, it shall be continually protected against drying by the application of water, until the bituminous seal is applied. At least 48 hours shall elapse between the completion of the finishing operations and the application of the bituminous seal. At the time the bituminous seal is applied, the soil cement surface shall be dense, free of all loose and extraneous material, and shall contain sufficient moisture to prevent penetration of the bituminous material. Water shall be applied in sufficient qua ntity to fill the surface voids of the soil cement immediately before the bituminous seal is applied. The bituminous seal shall be uniformly applied to the surface of the completed soil cement at the rate of approximately 0.15 to 0.30 gal/sy with approved heating and distributing equipment. The exact rate and temperature of application to give complete coverage without excessive run -off will be as determined and ordered by the Engineer. No traffic, nor placement of an overlying course, will be permitted ove r the soil cement course within 5 days from the application of the bituminous seal. Where this course is utilized for maintaining traffic, the application of the bituminous material shall be immediately followed by the application of approved cover aggreg ate of
308-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1A size at the rate of 20 to 30 lb/sy . The aggregate will be broomed and rolled as ordered by the Engineer. When the air temperature may be expected to reach the freezing point, sufficient protection from freezing shall be given the soil cement for 7 days after its construction and until it has hardened to the satisfaction of the Engineer.
308-3.10 Traffic. No traffic or hauling equipment other than that necessary for sealing, chipping or for
placing the next course will be permitted over this course, unless specifically permitted by a Special Note in the Proposal .
308-3.11 Maintenance. The Contractor shall be required, within the limits of the contract, to maintain
the soil cement in good condition and in a manner satisfactory to the Engineer from the time he first starts work until all work has been completed and accepted. Maintenance by the Contractor shall include immediate repairs of any defects, regardl ess of cause, that may occur. This work shall be done by the Contractor at its own expense, and repeated as often as may be necessary to keep the course continuously intact. Repairs are to be made in a manner to insure restoration of a uniform surface and durability of the part repaired. Faulty and damaged work, regardless of cause, shall be replaced for the full depth of the course by the Contractor at its own expense. Any low areas, regardless of cause, shall be remedied by replacing the material for the full depth of the course and not by adding a thin layer of soil cement to the completed work.
308-4 METHOD OF MEASUREMENT. The quantity to be paid for under this item will be the
number of cubic yards of material computed within the payment lines shown on the plans or otherwise ordered in writing by the Engineer, and completed in accordance with the plans and specifications. The thickness of the surface treatment will not be included in the volume meas ured for payment.
308-5 BASIS OF PAYMENT. The unit bid price per cubic yard for this item will include the cost of
furnishing all labor, equipment and materials necessary to complete the work, except that furnishing Portland cement, calcium chloride (where required), bituminous material, water equipment and applying water, will b e paid for separately under their respective items. No direct payment will be made for any maintenance, repairs and replacements made before acceptance, nor for any losses of material which may result from shrinkage, compaction, foundation settlement, waste, overflow, erosion, leakage or any other causes: t he cost of such will be included in the price bid for this item. Payment will be made under: Item No. Item Pay Unit 308.01 Soil Cement Course Cubic Yard SECTIONS 309 THRU 399 (VACANT)
401-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Section 400 ASPHALT MIXTURE AND PAVEMENT SECTION 401 - PLANT PRODUCTION (Last Revised January , 2023)
401-1 DESCRIPTION. The contractor is responsible for Quality Control (QC). QC is defined as all
activities required to produce asphalt mixture that meets all specification requirements. The contractor shall incorporate a Quality Control system for all plant production of asphalt mixture and assume responsibilities for all QC activities at the production facilities. The contractor shall produce the asphalt mixture according to the specifications herein and provide production documentation. Quality Adjustment Factors (QAFs) will be used to assess asphalt mixture production quality and these factors will be applied to calculate a quality payment adjustment. The Department is responsible for Quality Assurance (QA). QA is defined as all activities performed by the Department to assure that asphalt mixture production meets the specification requirements. The Department will determine quality payment adjustments for each day’s production using a daily QAF obtained from the calculations of the average absolute values for volumetric and non -volumetric mixes in accordance with Materials Procedure (MP) 401, Quality Control and Quality Assurance Procedures for Quality Control Asphalt Mixture Production. The daily QAFs measure production variation from the mean of the specification limits.
401-2 MATERIALS. The provisions of §40 4-4, Materials , apply and are as modified herein. Produce
asphalt mixture in accordance with the requirements outlined in this specification, including all applicable Test Methods and Materials Procedures. Asphalt mixture designs must be accepted by the Department prior to any asphalt production. The Department reserves the right to suspend any mixture design when the mixture produces unacceptable paving results or exhibits properties that will affect the anticipated pavement performance.
401-2.01 Asphalt Mixture Designs. Formulate and submit an asphalt mixture design to the Regional
Materials Engineer (RME) that satisfies all design criteria outlined in MM 5.16, Asphalt Mixture Design and Mixture Verification Procedures . When the submitted asphalt mixture design is assigned verification status, the design must be verified during production. Notify the RME at least 24 hours prior to the start of verification status production. When producing under verification status, make necessary adjustm ents to control the process. Apply daily QAFs to both verification and production status mix designs. Mixtures produced under verification status are allowed for use on State projects. For any asphalt permeable base and shim mixtures required by the contract documents, formulate and submit to the RME a job mix formula that satisfies the General Limits imposed by Table 401 -1, Composition of Asphalt Mixtures .
401-2.02 Aggregates. Aggregate must be from a source approved by the Department. Use fine aggregate
that consists of materials conforming to the requirements of §703 -01, Fine Aggregate . In addition, fine aggregate may consist of screenings, free from deleterious materials and manufactured from sources of stone, gravel, or slag meeting the requirements of §703 -02, Coarse Aggregate .
401-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Use coarse aggregate that consists either of crushed stone, crushed gravel, or crushed slag conforming to the requirements of §703 -02, Coarse Aggregate and MM 5.16. Use slag aggregate on State projects only when an alternate pay item which takes the mix yield differential into account is included on the plans or in the itemized proposal. When coarse aggregates for the mixture are from more than one source or of more than one type of material, proportion and blend them to provide a uniform mixture. TABLE 401 -1 COMPOSITION OF ASPHALT MIXTURES Mixture Requirements Permeable Base Shim Type 2 Type 5 Screen Sizes General Limits % Passing1 Job Mix Tolerance % General Limits % Passing1 Job Mix Tolerance % 2 in 100 --- --- --- 1½ in 75 – 100 ±7 --- --- 1 in 55 – 80 ±8 --- --- ½ in 23 – 42 ±7 --- --- ¼ in 5 – 20 ±6 100 --- 1/8 in 2 – 15 ±4 80 – 100 ±6 No. 20 --- --- 32 – 72 ±7 No. 40 --- --- 18 – 52 ±7 No. 80 --- --- 7 – 26 ±4 No. 200 --- --- 2 – 12 ±2 Asphalt Content, %2,3 2.5 – 4.5 NA 7.0 – 9.5 NA Mixing and Compaction Temperature Range ºF 225 – 300 250 – 325 NOTES: 1.All aggregate percentages are based on the total weight of the aggregates. 2.The asphalt content is based on the total weight of the mix. When using slag aggregates in the mix, the asphalt content shall be increased accordingly, a minimum of 25 percent for an all slag mix. 3.Use the PG binder listed in the proposal or as designated by the Regional Materials Engineer following the guidance specified in the Comprehensive Pavement Design Manual, Chapter 6, Section 6.2.5 – Performance Graded Binder Selection .
401-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. 12.5 Nominal Maximum Size Aggregate Mixes. Noncarbonate plus 1/8 inch particles must comprise a minimum of 30.0% of the total aggregate (by weight with adjustments to equivalent volumes for materials of different specific gravities). A minimum of 90.0% of plus 3/8 inch particles must be non -carbonate.
401-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 4. Gravel, or a natural or manufactured blend of the following types of materials: limestone, dolomite, gravel, sandstone, granite, chert, traprock, ore tailings, slag or other similar materials, meeting the following requirements:
401-2.03 Mineral Filler. Use m ineral filler conforming to the requirements of §703 -08, Mineral Filler .
401-2.04 Performance -Graded Binder. Use the Performance -Graded Binder (PG Binder) in the
production of these mixtures that meets Section 702 – Bituminous Materials . Initial acceptance of the PG Binder is based on the primary source appearing on the Department’s Approved List for Bituminous Material Primary Sources, A. Performance -Graded Binders for Paving. Acceptance of the PG Binder is contingent upon satisfactory t est results from samples taken, as required by the Department’s procedural directives, at the location where the material is incorporated into the work. A primary source is defined as a firm that samples, tests, and certifies by Production Lot that the PG Binder is in conformance with the specifications. The procedural directives for sampling, testing, and certifying the PG Binder, and for achieving and maintaining approved list status, are available from the Materials Bureau. The temperature of PG Binder delivered to the Asphalt Mixture Production Facility shall not exceed 350°F, unless the PG Binder supplier recommends it.
401-2.05 Reclaimed Asphalt Pavement. Reclaimed Asphalt P avement (RAP) shall meet the
requirements of MM 5.16.
401-3 Construction Details.
401-3.01 Quality Control. Perform all sampling and testing in accordance with Materials Procedure
401. Document all QC test results and records in a legible manner and provide them to the State at the end of each production season or when requested by the RME. Asphalt Mixture produced without the required sampling, testing and documentation may be rejected.
401-3.02 Production Facility Laboratory. Maintain an approved production facility site laboratory to
perform all required asphalt mixture sampling and testing according to MP 401.
401-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 401-3.03 Plant Lots and Sublots. Determine plant lots and sublots on a daily basis in accordance with MP 401.
401-3.04 Quality Control Sampling and Testing. Obtain and test QC samples as outlined in MP 401.
401-3.05 Production Control. Produce asphalt mixture according to MP 401. Make necessary process
control adjustments during production according to MP 401.
401-3.06 Production Quantities. Whenever production is made for the Department, notify the Regional
Materials office by 3:00 p.m. the business day before the day of production. Maintain a record of each day’s production quantity for each mix design supplied to the project site daily. Retain these records at the production facility. These records must be available to the Department’s representative for review. Ship all production quantities as outlined in §401 -3.07 Documentation .
401-3.07 Documentation. Record all QC test data for each plant on the appropriate forms provided by
the Department according to MP 401. Also, keep a copy of the plant automation printout at the plant facility for each mix type produced and make them available for review at all times. Transmit a summary of all test data weekly to the RME. Provide a delivery ticket indicating the total quantity in tons being delivered with each delivery vehicle supplying asphalt mixture . The method of determining the delivered quantity is subject to the approval of the RME. Make one legible copy of the delivery ticket available to the Department’s paving inspector prior to the placement of the mixture showing the following minimum information:
401-3.08 Asphal t Mixing Plant. Asphalt mixing plants must meet the requirements in MP 401.
401-3.09 Asphalt Mixture Holding Bins. Asphalt mixtures may be held in holding bins which meet the
requirements in MP 401.
401-3.10 Evaluation of Lots Represented by 0.85 QAF. When any material results in a QAF of 0.85,
the Engineer will evaluate the subject material to determine if it will be left in place. The Engineer may require the Contractor to core the pavement to determine if the in -place density is acceptable at no additional cost to the State. When cores are required, the Engineer will divide the pavement area being
401-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 evaluated into 4 sublots in accordance with the requirements of §40 4-3.08, Pavement Density Samples. The material will be left in -place when either of the following sets of conditions is met.
401-4 METHOD OF MEASUREMENT. The quantity will be the number of tons delivered as
determined from the automated proportioning system, the delivery vehicle weigh system, or the asphalt mixture holding bin weigh system. The measurement or calculation will be the quantity based on the measured amount and reported to the nearest 0.01 of a ton. SECTION 402 - VACANT SECTION 403 - VACANT SECTION 404 - ASPHALT PAVEMENTS
404-1 DESCRIPTION. These specifications apply to all plant mixed asphalt produced at a production
facility under Section 401 Plant Production This work will consist of providing, placing, and performing density monitoring of one or more courses of asphalt pavement constructed on the prepared foundation in accordance with the contract documents or as directed by the Engineer.
404-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 404-2 – MATERIALS.
404-2.01 General. Aggregate, Performance Graded (PG) Binder, and Warm Mix Asphalt Technology
shall be from suppliers listed in the Department’s Approved List for Fine and Coarse Aggregates, Performance Graded (PG) Binders and Warm Mix Asphalt Technology for Asphalt Paving, respectively. Mineral filler shall meet the requirements of §703 -08. A PG Binder grade and the mix design gyration will be specified by Special Note in the contract documents. The use of the WMA Technology shall comply with the latest technology supplier’s approved “Production, Testing, and Compaction Details” .
404-2.02 Composition of Mixtures. Asphalt mixture shall meet the requirements of §401 -2 of the
Standard Specifications and the mixture design procedure in Materials Method (MM) 5.16, Asphalt Mixture Design and Mixture Verification Procedures . The Contractor shall be responsible for the quality and performance of the mixture created from approved components.
404-3 Construction Details .
• Mix Temperature. The desired asphalt mixture temperature shall be within the mixing and compaction range as recommended by the WMA technology provider and shall not exceed 295°F at the point of discharge of the haul vehicle, unless a higher temperature is approved by the Regional Materials En gineer. • Pre-pave Meeting. The Engineer will conduct a pre -pave meeting prior to any asphalt mixture placement. The attendees at this meeting will include the Regional Materials Engineer, Paving Superintendent, Chief Inspector or Paving Inspector(s), Asphalt Plant Representative, Density Gauge Operator (depending on the compaction method used), and a Work Zone Traffic Control (WZTC) representative. The participants should be prepared to discuss the steps necessary to complete the work successfully. • Participants will review all aspects of the requirements including, but not limited to, the following: o Warm Mix Technology dosage rates o Asphalt mixture target temperatures o Anticipated mixture production, delivery rate, and paving speed. o Seasonal considerations with operations o Equipment and setup o Mix codes to assure correct mixture is delivered o Gauge operator certification o Proper construction practice to provide quality product
404-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 o WZTC Activities • Certified Gauge Operator. When a density gauge is used to monitor pavement density, the Contractor shall provide a certified operator with a current Density Gauge Inspector Certification from the Associated General Contractors (NY Chapter), or its equivalent*, as determined by the Director of the Materials Bureau. *Equivalence: Operators that possess a current Paving Inspector Certification from Northeast Transportation Technician Certification Program (NETTCP) and pass the current Density Gauge Inspector Certification exam shall be considered to have an equivalent certification.
404-3.01 Temperature and Seasonal Limitations .
404-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 temperature and outside the seasonal limits to expedite the completion of the work.
404-3.02 Pavers. The paver shall be capable of spreading and finishing courses of asphalt mixture in lane
widths, shoulders, or similar construction applicable to the specified typical section and thicknesses shown on the plans. When a paver is found to be defective, either before or during its use, it shall be repaired or replaced immediately. The paver shall meet the following requirements:
404-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 404-3.03 Hauling Equipment. Transport trucks shall have clean, smooth, tight metal beds with waterproof covers for transporting asphalt mixtures to the work site. A waterproof cover shall be mounted in such a manner that it covers the entire load and overlaps the vehicle’s sideboards and back by a minimum of 6 inches and is fastened except for live-bottom trucks that has a channelized tarp system. The inside surface of the vehicle body may be lightly coated with a release agent listed on the Approved List for Release Agents. The use of petroleum products or solvents as release agents is prohibited. All hauling equipment is subject to the approval of the Engineer.
404-3.04 Rollers. Contractor shall use vibratory, oscillatory, static steel wheel type, or pneumatic tire
rollers capable of compacting asphalt pavement and weighing at least 8 tons. The Engineer will inspect rollers prior to the start of paving operations to determine acceptability. The rollers should be in good mechanical condition, and capable of operating at speeds slow enough to avoid displacement of the mixture. Rollers that result in excessive crushing of aggregate shall not be used. All rollers shall have either a sticker or a plate installed on the roller indicating the recommended settings for amplitude, frequency, and tire pressure (pneumatic) for the thickness of pavement being rolled. Vibratory rollers shall be set up such that they produce a minimum of 12 impacts per foot during the compaction process.
404-3.05 Conditioning of Existing Surface. The Contractor shall use the provisions of Section 633
Conditioning Existing Pavement Prior to Asphalt Overlay to clean the surface of the existing pavement prior to the application of new asphalt mixture or when specified in the contract documents, to fill joints and cracks, and perform repairs. Any foreign material resulting from construction operations shall be cleaned at no additional cost to the State. For filling the wheel ruts, the Contractor shall use Shim Course or 6.3 Top Course unless a specific asphalt mixture is specified. The mixture used for filling ruts shall be compacted with a minimum of three passes of a pneumatic rubber tire roller. If the true and leveling (T&L) course is specified in the contract documents using a specific mixture type, the Contractor shall place the course(s) with a minimum variable thickness to bring the surface of the existing pavement to the same transverse slope and longitudinal grade required for the finished pavement surface. If the mixture type is not specified, the Contractor shall use Table 404 -2 Mixture Selection for T&L Course , to select the appropriate mixture type. The selection of the mixture shall be such that dragging of stones at the thin edge is minimized, including when constructing wedges for super -elevation. If dragging is excessive in any T&L course, a different T&L mixture shall be selected for the application. The surface of this course will be tested in the same manner prescribed in §404 -3.10 Surface Tolerance , except that the allowable variation from the true surface after compaction shall not exceed ⅜ inch.
404-3.06 Spreading and Finishing
404-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 required on the surface of Permeable Base courses. Paving over a tack coat should not commence until the emulsion has broken (goes from brown to black) or is tacky when touched.
404-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 H. Wet Surface. Asphalt mixture shall not be placed on any wet surface. Wet surface is defined as one that is moistened, covered, or soaked with water.
404-3.07 Compaction. The Contractor shall compact the asphalt mixture sufficiently using the
appropriate compaction method to achieve pavement densities of at least 93%, expressed as a percentage of the mixture’s maximum theoretical density (MMTD). The asphalt mixture shall be compacted using rollers meeting the requirements of §404 -3.04 Rollers . A minimum of two rollers, one for breakdown and one finish roller, shall be used unless the asphalt mixture placement is on a bridge deck, bridge approaches, or other areas where one roller may be sufficient to achieve the required density. When paving multiple lanes simultaneously, the required number of rollers shall be increased proportionately for each additional full lane width unless otherwise approved by the Engineer. The asphalt mixture shall be compacted immediately after placement, and when the mixture is in the proper condition such that the rollers do not cause displacement, cracking, or shoving. Initially, all courses shall be compacted with the roller traveling parallel to the centerline of the pavement, beginning at each edge, and working toward the center. The super -elevated curves shall be compacted starting at the low-side edge and working toward the higher edge. Any displacement caused by the roller, or any other causes, shall be corrected immediately using rakes and additional asphalt mixture as required. The roller wheels shall be properly moistened with water, water mixed with small quantities of detergent, or other approved material, to prevent adhesion of the mixture to the rollers. The use of petroleum products or solvents are not allowed to prevent adhesion. The asphalt mixture along forms, curbs, headers, walls, and other areas not accessible to rollers shall be compacted with mechanical tampers, a trench roller, or a small vibratory roller with the approval of the Engineer. The Contractor shall remove and replace any asphalt mixture that becomes loose and broken, mixed with dirt, or is in any way defective and the new mixture shall be compacted to conform to the surrounding area. Any areas showing an excess or deficiency of asphalt material shall be corrected immediately. Vibratory compaction is not allowed when asphalt mixture is placed on a structural bridge deck or other structures with less than 2 feet of cover over the structure or when specified in contract documents. The Contractor shall repair all damages which may occur to the highway components and adjacent property, including buried utility and service facilities, at no additional cost to the State. Steel wheel rollers running on static mode, pneumatic rollers or oscillatory rollers shall be used on the bridge decks. The Contractor shall monitor pavement density for 60 and 70 Series compaction using density gauges meeting the provisions of §404 -3.07E Density Gauges . The density gauge operator shall possess a current Density Gauge Inspector Certification from The New York State Associated General Contractors, or its equivalent, as determined by the Director, Materials Bureau. Any asphalt placement under 60 and 70 Series monitored by a gauge operator whose certification is revoked for reasons outlined in the New York State Inspector Certification Program Manual under “Decertification”, shall be evaluated in accordanc e with §404 -3.14 Pavement Evaluation , using the results of pavement samples taken in accordance with §404 -3.08 Pavement Density Samples.
404-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 maximum of 8 cores for a lot. Ramps less than 1500 feet in length and shoulders will not be considered part of the traveled way and are not subject to coring. The Engineer will mark a pavement core location in each sublot in accordance with §404 -3.08A Pavement Cores once the compaction operation is completed, excluding the first 300 feet of the day’s placement. The Contractor shall extract pavement cores at the marked locations in each sublot and fill the pavement core holes before the road is open to traffic in accordance with §404 -3.08 B Filling Core Holes . The pavement cores shall be extracted no later than the end of the following day’s placement. The Contractor shall deliver the sealed pavement cores to the Regional Materials Laboratory in accordance with §404 -3.08 E Sample Delivery . The Regional Laboratory will test core samples and determine the percent density using the maximum theoretical density samples taken in accordance with §404 -3.08 C Loose Mix Samples . The results of this analysis will be used to determine the pavement density Quality Adjustment Factor (QAF) in accordance with MP 404-02 and submitted to the Engineer prior to the end of the next business day upon the delivery of the samples . The Engineer will apply the pavement density QAF to the material placed on that day in accordance with §404.4 Method of Measurement , Table 404-6, Quality Adjustment Factors for 50 Series . When two consecutive lots are found to have a density QAF equal to or less than 0.85, the Contractor shall stop paving operations and provide a corrective action plan. The Contractor shall compact material on shoulders, widening, crossovers, bridges, and ramps with a uniform full-width section of less than 1500 feet in length using the same roller pattern as traveled way. If the shoulder subbase is structurally insufficient to sustain the level of compaction such that the shoulder shows sign of distress during compaction, the compaction effort shall be decreased until no further damage occurs to the shoulder or subbase.
404-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 c. The Contractor shall extract pavement cores at the marked location in each sublot and fill the core holes before the road is opened to traffic. The density gauge readings and sealed pavement cores shall be delivered to the Regional Materials Laboratory in accordance with §404 -3.08 Pavement Density Samples .
404-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 sustain the level of compaction such that they show signs of distress, the Contractor shall decrease the compaction effort until no damage occurs to the shoulder or subbase.
404-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 c. Gauge readings do not seem to accurately represent the asphalt pavement density.
404-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 a. A frequency range of 1,000 vpm to 4,000 vpm
404-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 404-3.08 Pavement Density Samples
404-3 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 E. Sample Delivery. The Contractor shall deliver the pavement samples to the Regional Materials Laboratory no later than the end of the following day’s placement. If these samples are not submitted for any paving lot within the required duration, a QAF of 1.00 or less will be assigned for that lot if a QAF is applicable. When, for any reason, a delay occurs in the delivery of the lot samples for three consecutive lots, the Engineer will stop paving operations until the samples are delivered and tested.
404-3.09 Joints. The finished pavement at all joints shall comply with the surface tolerance requirements
and exhibit the same uniformity of texture and compaction as other sections of the pavement course. Rollers shall not pass over the unprotected edges of a freshly laid mixture unless approved by the Engineer. All joints, excluding the tapered wedge joint, shall be constructed such that the exposed edge has the required lift thickness, and the alignment of the pavement course is straight, unless the exposed joint will not be part of the joint. If the edge of the newly placed pavement course is not straight or smoothly curved, the Contractor shall sawcut the edge by using a power saw or other approved tools to cut a neat straight edge . Prior to placing the adjacent course, a joint adhesive shall be applied in accordance with §404 -3.06 Joint Adhesive , to all pavement edges to provide bonding with the newly laid pavement. Successive asphalt pavement courses shall be placed over an underlying course such that all longitudinal joints are offset no more than 6 inches from the longitudinal joint of the lower pavement course, unless otherwise approved by the Engineer. Pavement courses on existing PCC pavement shall be placed such that all longitudinal joints are stacked on top of the joint of the underlying PCC pavement.
404-3 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Longitudinal Joints. The longitudinal joints in the asphalt Top Course shall correspond with the edges of the proposed traffic lanes. Other joint arrangements will require approval of the Engineer. For 70 and 80 Series, the dual -drum vibratory roller shall be operated in a vibratory mode, unless static rolling is required, to construct the longitudinal joint. Rollers shall be as close to the paver as practical. The first pass shall be made traveling toward the paver and operating on the hot mat with 6 to 8 inches of the roller drum overlapping onto the cold mat. The second pass shall be made to the joint with the roller traveling back away from the paver along the same path. If a single -drum vibratory roller with pneumatic drive wheels is used, the roller shall be operated in vibratory mode and following the same procedure as the dual -drum roller. The exception to this is that the roller will be aligned on the joint so that the pneumatic drive wheels travel on the joint. All turning movements of the roller shall be made on previously compacted material. After applying two roller passes on the longitudinal joint, the roller shall proceed to the low side of the lane and compact as described in §404 -3.07 Compaction . The longitudinal joint shall be constructed such that the compacted thickness of the newly placed mat shall not exceed ¼ inch of the adjacent mat. When the joint is constructed with an overlap, the overlap shall not exceed 2 inches. For all asphalt pavement courses other than Top Course, the longitudinal pavement joint shall not be exposed more than 100 feet at the end of the working day when traffic is maintained on the roadway during paving operations. For Top Course of 2.5 inches or less, refer to §404 -3.09D Exposed Longitudinal Joint . The longitudinal joint shall be constructed using one of the two options below:
404-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Cores will be taken from the total length of the joint matched daily. The number of cores extracted shall be in accordance with Table 404 -4 Longitudinal Joint Cores for 50 & 60 Series . The Engineer will randomly mark core locations centered over the constructed joint in accordance with MP
404-02 using the X coordinates only. A matched joint of 1500 feet or less is not subject to coring. The
Contractor shall extract cores on the same day the joint is matched or before the completion of next day’s placement. The cores shall be extracted in accordance with §404 -3.08A Pavement Density Samples and delivered to the Regional Laboratory. The Regional Materials Engineer will determine the core density using the mixture’s maximum theoretical density specified in §404 -3.08C. TABLE 404-4 LONGITUDINAL JOINT CORES FOR 50 & 60 SERIES Daily Joint Length (feet) No. of Cores 1,500 < Length ≤ 10,000 4 10,000 < Length ≤ 20,000 6 Length > 20,000 8
404-3.10 Surface Tolerance. The Contractor shall construct each pavement course to a ¼ inch surface
tolerance. The Engineer may test the surface with a 16 -foot straight edge or string line placed parallel to the centerline of the pavement and with a 10 -foot straight edge or string line placed transversely to the centerline of the pavement. Variations exceeding ¼ inch shall be appropriately corrected or the pavement be removed and replaced at no additional cost to the State.
404-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 404-3.11 Thickness Tolerance. The Contractor shall construct the pavement such that the final compacted thickness is as near to the nominal thickness as is practical, and within the tolerances specified below. The Engineer may request pavement cores to determine the thickness of the completed pavement course for final acceptance and payment. The Contractor shall provide work zone traffic control and take pavement cores in accordance with §404 -3.08 Pavement Density Sample, at no additional cost to the State. The Engineer may use another acceptance method such as yield calculations to determine the final thickness for acceptance and payment. Asphalt mixture placed as a Truing and Leveling (T&L) course as described in §404 -3.05 Conditioning of Existing Surface shall not be considered in pavement thickness determinations. The allowable tolerance for asphalt mixture specified under a single pay item is as follows:
404-3.12 Paver and Equipment Cleaning. Tools and equipment used for asphalt placement shall not be
cleaned on the pavement surface, or near streams, ponds, drainage structures or other areas that are tributaries to waterways. The designated area approved by the Engineer shall be used for cleaning all paving equipment and tools. If petroleum products are used for cleaning, the use of tarpaulins, sand pails, pails or other methods shall be used to collect all liquid product produced by cleaning operations to prevent any contaminates from spilling or being accidentally released into the environ ment. Hand sprayers or other similar devices may be used to minimize the amount of petroleum product applied. Any sand, soil and/or collected petroleum products from cleaning operations shall be properly disposed of as petroleum contaminated soil at no additional cost to the State.
404-3.13 Shoulder Edge Wedge. The Contractor shall construct a shoulder edge wedge as detailed in the
contract documents. The asphalt mixture shall be placed on the pavement shoulders where the outside edge of Top and Binder Course consist of an angle of 35° or flatter measured from finished grade to the preceding course surface. The shoulder edge wedge shall be constructed using a device attached to the screed to minimize hand work. The top of the tapered section shall be at the end of the shoulder width such that the tapered section will be an additional width of material outside of the paved shoulder width.
404-3.14 Pavement Evaluation. The Engineer will evaluate mixtures either placed or produced outside
the specification limits which results in low quality adjustment factors.
404-3 15
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 404-3.15 Pavement Defects. Upon completion of the asphalt mixture placement, the Engineer will ensure there are no visible defects in the pavement, such as ruts, ridges, roller marks, cracking, tearing, segregation, bleeding, or any other irregularities. The Contractor shall correct any defects that become apparent or replace the defective pavement at no additional cost to the State.
404-4 Method of Measurement
404-4.01 Asphalt. The quantity of asphalt mixture to be measured for payment will be measured in tons
and rounded to the nearest 0.01 tons. Requirements of §401 -4 shall apply.
404-4.02 Plant Production Quality Adjustment. Plant Production Quality Adjustments will be measured
in Quality Units determined for each day’s production using the daily Quality Adjustment Factor (QAF) for plant production. Also, this will be determined in accordance with §401 -3.07 Documentation . Quality Units for plant production quality adjustments will be calculated using the formula below. Quality Units = (Quality Adjustment Factor - 1.00) x Asphalt Placed (Tons) No plant adjustment will be made for temporary pavement, shim, permeable base items, and other miscellaneous items.
404-4.03 Pavement Density Quality Adjustment. Pavement Density Quality Adjustments will be
measured in Quality Units determined for each day’s production using the daily Quality Adjustment Factor (QAF) for pavement density. The quantity of asphalt mixture subject to adjustment will be determined from quantity placed on the mainline. The pavement density QAF will not apply to asphalt mixture placed on ramps with a uniform full width section less than 1500 feet, shoulders, widening, crossovers, and bridges. Payment in these areas will be a QAF of 1.00 based on satisfactory placement and compaction. When shoulders and mainline are placed together, the mainline quantity may be determined using typical sections shown in the contract documents. Quality Units for pavement density quality adjustments under 50 and 60 Series compaction methods will be calculated using the formula below. No pavement density quality adjustments will be made under 70 and 80 Series compaction methods. Quality Units = (Quality Adjustment Factor - 1.00) x Asphalt Placed (Tons)
404-4 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 TABLE 404-6 DENSITY SEGMENT PAY FACTORS Density Segment Segment Pay Factor 88 – 90 0.60 90 – 91 0.70 91 – 92 0.80 92 – 93 0.90 93 – 94 1.00 94 – 100 1.05
404-4.04 Joint Density Quality Adjustment. The Engineer will determine the density of each joint core
and calculate the average percent of the mixture’s maximum theoretical density (%MMTD) of the longitudinal joint cores. The Engineer will measure the length of longitudinal joints, in linear feet, and determine the number of segments. A segment is defined as a 528-foot section of a joint. A partial segment of 264 feet or greater (≥ 0.5 of a segment) will be considered a full segment. The Engineer will determine the segment Quality Units (QU) from Table 404-8 Quality Adjustment for Longitudinal Joint Density based on the average density of the joint cores and calculate the total Quality Units using the formula below. Quality Units = Segment QUs X # of Segments A payment adjustment will be made using the Quality Unit Index Price to the longitudinal joint length on the traveled way for the day the joint cores represent. TABLE 404-8 QUALITY ADJUSTMENT FOR LONGITUDINAL JOINT DENSITY Average Core Density, % MMTD Segment Quality Units (QU) Density ≥ 93.0 4 86.0≤ Density <93.0 QU = 1.143*Avg Core Density – 102.31 Density <86 -4
404-5 BASIS OF PAYMENT. The unit price bid for all asphalt mixture shall include the cost of all
labor, materials, and equipment necessary to satisfactorily complete the work, including cleaning of pavement, extracting the pavement cores, filling, and compaction of all core holes. Application of tack
404-4 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 coat, joint adhesive, and repairs of pavement, and filling of cracks will be paid separately except when the joint adhesive is applied under §404 -3.01E. Payment of Quality Adjustments will be made based on the number of Quality Units multiplied by the fixed index price for Quality Adjustment to asphalt Items listed in the contract documents for the quantity placed on the day the Quality Units represent. Payment will be made under: Item No. Item Pay Unit 404.011901 Type 2 F9, Asphalt -Treated Permeable Base Course Ton 404.017901 Truing & Leveling F9, Asphalt, 70 Series Compaction Ton 404.018901 Truing & Leveling F9, Asphalt, 80 Series Compaction Ton 404.058901 Shim Course F9, Asphalt Ton 404.068101 6.3 F1 Top Course Asphalt, 80 Series Compaction Ton 404.068201 6.3 F2 Top Course Asphalt, 80 Series Compaction Ton 404.068301 6.3 F3 Top Course Asphalt, 80 Series Compaction Ton 404.095101 9.5 F1 Top Course Asphalt, 50 Series Compaction Ton 404.095201 9.5 F2 Top Course Asphalt, 50 Series Compaction Ton 404.096101 9.5 F1 Top Course Asphalt, 60 Series Compaction Ton 404.096201 9.5 F2 Top Course Asphalt, 60 Series Compaction Ton 404.096301 9.5 F3 Top Course Asphalt, 60 Series Compaction Ton 404.097101 9.5 F1 Top Course Asphalt, 70 Series Compaction Ton 404.097201 9.5 F2 Top Course Asphalt, 70 Series Compaction Ton 404.097301 9.5 F3 Top Course Asphalt, 70 Series Compaction Ton 404.098101 9.5 F1 Top Course Asphalt, 80 Series Compaction Ton 404.098201 9.5 F2 Top Course Asphalt, 80 Series Compaction Ton 404.098301 9.5 F3 Top Course Asphalt, 80 Series Compaction Ton 404.098901 9.5 F9 T&L or Shoulder Course Asphalt, 80 Series Compaction Ton 404.125101 12.5 F1 Top Course Asphalt, 50 Series Compaction Ton 404.125201 12.5 F2 Top Course Asphalt, 50 Series Compaction Ton 404.126101 12.5 F1 Top Course Asphalt, 60 Series Compaction Ton 404.126201 12.5 F2 Top Course Asphalt, 60 Series Compaction Ton 404.126301 12.5 F3 Top Course Asphalt, 60 Series Compaction Ton 404.127101 12.5 F1 Top Course Asphalt, 70 Series Compaction Ton 404.127201 12.5 F2 Top Course Asphalt, 70 Series Compaction Ton 404.127301 12.5 F3 Top Course Asphalt, 70 Series Compaction Ton 404.128101 12.5 F1 Top Course Asphalt, 80 Series Compaction Ton 404.128201 12.5 F2 Top Course Asphalt, 80 Series Compaction Ton 404.128301 12.5 F3 Top Course Asphalt, 80 Series Compaction Ton 404.128901 12.5 F9 T&L or Shoulder Course Asphalt, 80 Series Compaction Ton 404.125901 12.5 F9 Binder Course, 50 Series Compaction Ton 404.126901 12.5 F9 Binder Course, 60 Series Compaction Ton 404.127901 12.5 F9 Binder Course, 70 Series Compaction Ton 404.195901 19 F9 Binder Course Asphalt, 50 Series Compaction Ton 404.196901 19 F9 Binder Course Asphalt, 60 Series Compaction Ton 404.197901 19 F9 Binder Course Asphalt, 70 Series Compaction Ton 404.198901 19 F9 Binder Course Asphalt, 80 Series Compaction Ton 404.255901 25 F9 Binder Course Asphalt, 50 Series Compaction Ton 404.256901 25 F9 Binder Course Asphalt, 60 Series Compaction Ton 404.257901 25 F9 Binder Course Asphalt, 70 Series Compaction Ton 404.258901 25 F9 Binder Course Asphalt, 80 Series Compaction Ton
405-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 404.376901 37.5 F9 Base Course Asphalt, 60 Series Compaction Ton 404.377901 37.5 F9 Base Course Asphalt, 70 Series Compaction Ton 404.378901 37.5 F9 Base Course Asphalt, 80 Series Compaction Ton 404.418901 9.5 F9 Temporary Top Course Asphalt, 80 Series Compaction Ton 404.428901 12.5 F9 Temporary Top Course Asphalt, 80 Series Compaction Ton 404.438901 19 F9 Temporary Binder Course Asphalt, 80 Series Compaction Ton 404.448901 25 F9 Temporary Binder Course Asphalt, 80 Series Compaction Ton 404.458901 37.5 F9 Temporary Binder Course Asphalt, 80 Series Compaction Ton 404.000011 Plant Production Quality Adjustment to Asphalt Items Quality Unit 404.000021 Pavement Density Quality Adjustment to Asphalt Items Quality Unit 404.000031 Longitudinal Joint Density Quality Adjustment to Asphalt Items Quality Unit SECTION 405 - COLD MIX BITUMINOUS PAVEMENT (OPEN GRADED)
405-1 DESCRIPTION. This work shall consist of constructing one or more courses of cold mix
bituminous pavement on a prepared base in accordance with these specifications and in substantial conformance with the lines, grades, thicknesses, and typical cross -sections shown o n the plans or established by the Engineer.
405-2 Materials
405-2.01 Bituminous Material. The bituminous materials required for mixing and for sealing shall meet
the requirements of section 702, Bituminous Materials. The type and grade of bituminous material shall be that indicated on the plans or in the proposal.
405-2.02 Aggregates. The aggregates shall be Department approved aggregates meeting the
requirements of § 703 -02, Coarse Aggregates, for the sizes specified. Screened gravel shall not be permitted unless specified on the plans or in the proposal.
405-2.03 Composition of Mixtures. The bituminous cold mix shall be composed of a mixture of
aggregate and bituminous material as ordered and approved by the Engineer. The mix shall be proportioned as specified in Table 405 -1, Composition of Cold Bituminous Mixtures. TABLE 405 -1 COMPOSITION OF COLD BITUMINOUS MIXTURES Sieve Size Mixes Type 1 General Limits % passing1 Type 2 General Limits % passing1 Type 3 General Limits % passing1 2 in - - 100 1 1/2 in - 100 75-100 1 in 100 90-100 50-80 1/2 in 90-100 15-45 0-15 1/4 in 15-45 0-10 - 1/8 in 0-10 - - No. 200 0-1.0 0-1.0 0-1.0 Bituminous Material2,3 4.7-7.0 4.0-6.0 3.5-5.5 Description Open, Coarse Texture Open, Coarse Texture Open, Coarse Texture Typical Uses Surface Course Intermediate Base Course
405-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1 Percentage based on total aggregate weight.
405-3 Construction Requirements
405-3.01 Weather Limitations. Bituminous material or mixture shall not be applied on any soft
surfaces, when the surface is wet, when the temperature of the surface on which the mi xture is to be placed is below 45°F , or when other weather conditions would prevent proper construction of the pavement.
405-3.02 Equipment. The following equipment shall be required:
405-3.03 Preparation of the Base. The roadway surface to be covered shall be free from holes,
depressions, bumps, waves and corrugations. Any unsuitable surface areas shall be repaired by replacement of the unstable materials or by patching with a material to produce a tight surface hav ing the same elevation as the surrounding surface. The roadway surface shall be broomed when ordered by the Engineer to remove loose material.
405-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 405-3.04 Mixing and Spreading. The aggregate and asphalt shall be thoroughly mixed so that the bituminous material is uniformly distributed throughout and all aggregate particles are uniformly coated. The mixture shall be deposited on the prepared base either in a windrow at the back of the travel mixer or mechanically spread in a uniform layer so as to produce the specified thickness after compaction. If deposited in a windrow, it shall be spread over the entire roadway surface by motor grader or other approved spreader to produce the specified thickness after compaction. The maximum allowable compacted thickness shall be 2 inch es for the Type 1 mix (Table 405 -1) and 4 inches for the Type 2 and Type 3 mixes (Table 405 -1).
405-3.05 Compaction. After spreading, the mixture shall be thoroughly and uniformly compacted with a
self-propelled steel -wheeled roller or an approved vibratory roller to obtain a thoroughly compacted pavement. The number of roller passes to achieve the desired compaction shall be approved by the Engineer.
405-3.06 Surface Testing. The finished surface of the pavement shall be tested with a 16 foot straight
edge laid parallel with the center line of the pavement. Any area exceeding a 1/4 inch variation from the surrounding area shall be satisfactorily corrected or removed and replaced.
405-3.07 Pavement Sealing. Either prior to initial compaction or immediately after compacting the mix,
No. 1A size key stone meeting the requirements of § 703 -02, Coarse Aggregates, shall be uniformly spread upon the surface at the rate of 10 to 15 lb/sy and the course rolled. No. 1 size key stone meeting the requirements of § 703 -02, Coarse Aggregates, at the rate of 10 to 20 lb/ sy, may be used for key stone on the base course mixes. After placement of the No. 1A size key stone, the pavement shall be opened to traffic for a mini mum of 3 days before placing the seal coat. Prior to the application of the seal coat, the pavement surface shall be thoroughly swept and cleaned of all excess material. The seal coat shall be bituminous material asphalt emulsion meeting the requirements of § 702 -3101 or § 702 -4101 applied at the r ate of 0.3 to 0.5 gal/sy (Type 1 mix, Table 405 -
405-4 METHOD OF MEASUREMENT. The bituminous cold mix pavement shall be meas ured by the
number of tons of compacted aggregate, including key and cover stone, placed in accordance with the specifications. The liquid bituminous material shall be measured by the liter.
405-5 BASIS OF PAYMENT. The unit price bid per ton shall include the preparation of base, the cost
of furnishing all the aggregate, the mixing, placing, compaction and all labor and equipment necessary to complete the work. The bituminous material will be paid for under its appropriate item. Payment will be made under: Item No. Item Pay Unit 405.01 Cold Mix Bituminous Pavem ent (Open Graded) Ton SECTION 406 ASPHALT PAVEMENT WITH POLYMER FIBERS
406-1 DESCRIPTION. The work shall include the production and placement of warm mix asphalt with
polymer fibers.
407-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 406-2 MATERIALS. Material requirements shall be as specified in the special specifications.
406-3 CONSTRUCTION DETAILS. The construction requirements shall be as specified in the special
specifications.
406-4 METHOD OF MEASUREMENT. As specified in the special specifications.
406-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 407 - TACK COAT
407-1 DESCRIPTION. This work shall consist of preparing and treating an existing Portland cement
concrete surface or asphalt pavement surface with tack coat in accordance with the Contract documents and as directed by the Engineer.
407-2 MATERIALS. The tack coat shall meet the applicable requirements of §702. Use of alternative
tack coat material requires prior approval by the Director, Materials Bureau.
407-3 Construction Details.
407-3.01 Equipment. A distributor shall be used for applying tack coat. The distributor shall be capable
of applying the tack coat uniformly on variable widths of surface up to 15 feet. The distributor equipment shall include a quantity measuring system and a thermometer for measuring temperature of tank contents. Prior to being used on a project, this equipment shall be calibrated in accordance with ASTM D 2995 Standard Practice for Estimating Application Rate of Bituminous Distributors or an equivalent calibration procedure acceptable to the Engineer . The Engineer will witness the equipment calibration or require the Contractor to provide documentation certifying the calibration. Distributors shall be equipped with circulation spray bars which shall be adjustable both laterally and vertically. An attached bristle broom that drags on the pavement behind the spray bars may be attached to the distributor. If the broom is used, it shal l be adjustable laterally and vertically so that the full width of the applied tack coat is bristled uniformly into the pavement surface. A bituminous material sampling valve shall be attached to the distributor. The distributor tank shall be equipped with an agitator that is capable of ensuring the tack coat remains homogeneous. Tack coat stored in the distributor tank shall be heated and maintained at a temperature between 85ºF and 160ºF. Hand operated spray units will be permitted only in areas where the use of a distributor is impractical. The Engineer will determine the final acceptance of all equipment used for applying the tack coat.
407-3.02 Application of Tack Coat. The tack coat contained in the distributor tank shall be
homogeneous. The tack coat shall be applied to a prepared clean pavement. Material shall be applied uniformly across the width of the designated area. The tack coat shall not be applied on a wet pavement surface or when the pavement surface temperature is below 40°F. The application rate shall be as determined in Table 407 -1 Tack Coat Application Rates . These are recommended application rates for tack coat on various surface types and may be modified by the Engineer.
407-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 TABLE 407 -1 – TACK COAT APPLICATION RATES Surface Type Application Rate (gal/yd2) Diluted Tack Coat Straight Tack Coat New Asphalt Pavement 0.05 - 0.06 0.03 - 0.04 Milled Surfaces and Existing Asphalt Pavement 0.08 - 0.10 0.05 - 0.06 Portland Cement Concrete 0.08 - 0.10 0.05 - 0.06 Vertical Surfaces (curbs, drainage structures, and appurtenances) 0.09 - 0.11 0.06 - 0.07
407-3.03 Sampling. The Engineer will request samples from the Contractor at the frequency listed in
Materials Method 702 -2 Asphalt Emulsion - Quality Assurance . The Engineer will witness the Contractor sampling the material. The sample will represent all material from the same certified lot, placed that day.
407-4 METHOD OF MEASUREMENT. The quantity to be measured for payment will be in gallons of
tack coat measured at 60ºF to the nearest gallon. The following formula will be used to calculate material quantity at 60ºF: Volume @ 60ºF = Volume D x [1 - (ΔT x 0.00025)] ΔT = Delivered Temperature (ºF) - 60 Volume D = Quantity at Delivered Temperature (gallons)
407-5 BASIS OF PAYMENT. The unit price bid per gallon for tack coat shall include the cost of all
labor, materials, and equipment necessary to satisfactorily complete the work. The Regional Materials Engineer will evaluate material represented by failing samples. If the Engineer elects to leave the material in place, the Contractor shall receive a pay reduction of 75% of the tack bid price, for the pavement section represented b y the failing sample. Payment will be made under: Item No. Item Pay Unit 407.0102 Diluted Tack Coat Gallon 407.0103 Straight Tack Coat Gallon SECTIONS 408 AND 409 (VACANT) SECTION 410 – CHIP SEAL (Last Revised September, 2016)
410-1 DESCRIPTION. This work shall consist of the construction of a single course chip seal for
pavements and/or shoulders in accordance with the contract documents.
410-2 Materials
410-2.01 Bituminous Materials. The bituminous material shall meet the applicable requirements of
Section 702.
410-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Bituminous Material – Shoulders. For shoulders only, the Contractor shall use item 702 -3301P or 702-4201P.
410-2.02 Aggregates. The aggregate shall conform to the requirements of §703-02, Coarse Aggregates,
except as modified herein. The aggregate size shall be No. 1ST or No. 1A, as specified. The aggregate’s flakiness index shall meet the requirements of Materials Method 410, Chip Seal Mix Design .
410-2.03 Cover Sand. Use cover sand conforming to the requirements of §703-01, Fine Aggregate or
§703-02, Coarse Aggregate except as modified in Table 410 -1 Cover Sand. Table 410 -1 Cover Sand Screen Size Percent Passing 1/8 90-100 No. 200 0-3
410-2.04 Material Sampling and Testing
410-2 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 the Regional Materials Engineer.
410-2.05 Mix Design. Complete a mix design for pavements and/or shoulders in accordance with
Materials Method 410. A shoulder mix design is required when Contractor operations require the shoulder to be treated separately from the mainline. Mix designs shall be submitted to th e Engineer a minimum of two weeks prior to the start of the work.
410-3 Construction Details
410-3.01 General
410-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3. Ambient temperature is less than 50°F.
410-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Cover all manhole covers, water boxes, catch basins, and other such utility structures within the area being treated with plastic, building felt, or other material approved by the Engineer. Remove the covers each day.
410-3.02 Chip Seal
410-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 period following placement of the chip seal.
410-4 METHOD OF MEASUREMENT. The quantity of chip seal to be measured for payment will be
square yards of material in place, making no deductions for minor untreated areas such as catch basins and manholes. The bituminous material for the chip seal will be measured by the number of 60°F gallons incorporated in the work. The bituminous material for the fog seal will be measured by the number of 60°F gallons incorporated in the work. The following formula will be used to calculate bituminous material quantity at 60°F: Volume @ 60°F = Volume D x [1 - (ΔT x 0.00025)] Where: ΔT = Delivered Temperature (°F) – 60 Volume D = Quantity Delivered (gallons)
410-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Cover Sand will be measured by the number of square yards of material in place, making no deductions for minor untreated areas such as catch basins and manholes.
410-5 BASIS OF PAYMENT. The unit price bid per square yard for chip seal shall include the cost of
all labor, materials and equipment necessary to perform the work. Pavement cleaning, pavement marking removal, work zone traffic control and pilot vehicles will be paid for separate ly. If QA test results for aggregate exceed the rejection limit in Table 410 -4, the Regional Materials Engineer will evaluate if the material can remain in place. If the material is left in place, the chip seal item will be subject to a reduction in payment ac cording to Table 410 -4: TABLE 410 -4 CHIP SEAL PAY TABLE 1ST Aggregate Pay Reduction Rejection Limit % Passing 1/2 Sieve (100 – X) * 10 < 97 1/4 Sieve (X – 15) * 5 > 20 200 Sieve (X – 1.5) * 50 > 2 Flakiness Index (X – 25) * 5 > 30 1A Aggregate Pay Reduction Rejection Limit % Passing 1/2 Sieve (100 – X) * 10 < 97 1/4 Sieve (90 – X) * 5 < 85 1/8 Sieve (X – 15) * 5 > 20 200 Sieve (X – 1.5) * 50 > 2 Flakiness Index (X – 25) * 5 > 30 X = QA % Passing test value. Negative values indicate full payment. The QA results for the 200 sieve and Flakiness Index will be calculated to the nearest tenth. All other QA values will be rounded to the nearest whole number. Bituminous material used for chip seal will be paid for under a separate item as the number of 60°F gallons of material used. Bituminous material for the fog seal will be paid for under a separate item as the number of 60°F gallons of material used. The Engineer will evaluate any bituminous material failing QA testing to determine if it will be left in place. If the material is left in place, the bituminous material will be subject to a reduction in payment according to Table 410 -5: Table 410 -5 Bituminous Material Pay Table Number of Failing QA Test Results Pay Reduction of Bituminous Material Item 1 15% 2 25% Cover sand will be paid for under a separate item.
411-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Payment will be made under: Item No. Item Pay Unit 410.10 Chip Seal (1A) Square Yard 410.20 Chip Seal (1ST) Square Yard 410.30 Bituminous Material (Chip Seal) Gallons 410.40 Bituminous Material (Fog Seal) Gallons 410.50 Cover Sand Square Yard 410.60 Pick Up Broom or Vacuum Sweeper Each SECTION 411 - STABILIZED GRAVEL SURFACE COURSE (Last Revised January, 2020)
411-1 DESCRIPTION. The work shall consist of placing a stabilized gravel surface course with
additive, if specified, on a prepared base in accordance with these specifications and in conformance with the lines and grades shown on the plans or as directed by the Engineer.
411-2 Materials
411-2.01 Gravel. The gravel shall conform to the following gradation requirements:
Sieve Size Percent Passing by Weight 2 in 100 1/4 in 30 - 65 No. 200 10 - 20 Particles passing the No. 40 sieve size shall have a maximum liquid limit of 30 and a plasticity index ranging from 3 to 8. The maximum loss in 4 cycles of the Magnesium Sulfate Soundness Test shall be
411-2.02 Chemical Additives. Chemical additives, if required, shall meet the applicable requirements of
the following subsections: Calcium Chloride 712-02 Sodium Chloride 712-03
411-3 Construction Details
411-3.01 Placement. After the base has been brought to grade and cross section, as shown on the plans,
thoroughly compacted, and approved by the Engineer, the Contractor shall place the stabilized gravel surface course. When calcium or sodium chloride additives are specified, they shall be added by an approved mechanical distributor after the gravel has been spread and prior to the addition of water. Calcium chloride shall be added in the amount of 1/2 pound per square yard per inch of compacted thickness of the course. Sodium chloride shall be added at a rate of 2 pounds per square yard per inch of compacted thickness of the course which is equivalent to approximately 2% of sodium chloride based on dry weight of aggregate. Water shall then be added to the material in amounts as directed by the Engineer. If the Contractor so elects, only the calcium chloride may be added to the gravel material as a water solution. In such cases the Contractor shall submit to the Engineer a detailed description in writing of the
411-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 proposed procedure of operations. Construction shall not be started until the Engineer`s approval is obtained in writing.
411-3.02 Mixing
411-3.03 Compaction. When the in -place material is of uniform consistency and has a moisture content
within the limits for proper compaction, as determined by the Engineer, it shall be thoroughly compacted by the use of self -propelled pneumatic tired or vibratory compactor i n accordance with the requirements of Section 203, Compaction . During the compaction operation, light grading shall be done as required to maintain the surface of the course true to grade and cross -section. In confined areas, inaccessible to rollers, mechanical rammers shall be used to obtain the compaction required in §203 -3.03C. The finished surface of the stabilized gravel course shall be rolled in a float of free water with a smooth steel wheeled roller weighing not less than 10 tons. In all cases, the material must be so thoroughly compacted that it will not displace under the roller. This course shall not be placed in excess of 500 linear feet without being shaped, compacted and finish rolled. When posts for guide railing are to be installed adjacent to a stabilized gravel surface course, extreme care shall be taken during installation of the posts so that the stabilized gravel surface course is not disturbed.
411-3.04 Surface Preparation for Treatment
411-4 METHOD OF MEASUREMENT. The quantity for payment, in cubic yards of material, shall be
computed within the payment lines shown on the plans or otherwise ordered in writing by the Engineer, and in accordance with the plans and specifications.
411-5 BASIS OF PAYMENT. The unit bid price per cubic yard shall include the cost of furnishing all
labor, materials and equipment necessary to complete the work, except that the water, the calcium chloride, and the sodium chloride shall be paid for under their appropriate items. No direct payment will
411-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 be made for any losses of material which may result from shrinkage, compaction, foundation settlement, waste, overflow, erosion, leakage, or any other causes; the cost of such losses shall be included in the price bid for this work. Payment will be made under: Item No. Item Pay Unit 411.01 Stabilized Gravel Surface Course Cubic Yard 411.02 Calcium Chloride Stabilized Gravel Surface Course Cubic Yard 411.03 Sodium Chloride Stabilized Gravel Surface Course Cubic Yard SECTION 412 - CRACK SEALING ASPHALT PAVEMENTS
412-1 DESCRIPTION. The work in this section shall include work required for crack sealing asphalt
pavements.
412-2 MATERIALS. Materials shall be as specified in the special specifications.
412-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
412-4 METHOD OF MEASUREMENT. As specified in the special specifications.
412-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 413 - MICRO -SURFACING
413-1 DESCRIPTION. The work in this section shall include work required for micro -surfacing.
413-2 MATERIALS. Materials shall be as specified in the special specifications.
413-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
413-4 METHOD OF MEASUREMENT. As specified in the special specifications.
413-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 414 - QUICK -SET SLURRY
414-1 DESCRIPTION. The work in this section shall include work required for quick -set slurry.
414-2 MATERIALS. Materials shall be as specified in the special specifications.
414-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
414-4 METHOD OF MEASUREMENT. As specified in the special specifications.
414-5 BASIS OF PAYMENT. As specified in the special specifications.”
417-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 415 - PAVER PLACED SURFACE TREATMENT
415-1 DESCRIPTION. The work in this section shall include work required for paver -placed surface
treatment.
415-2 MATERIALS. Materials shall be as specified in the special specifications.
415-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
415-4 METHOD OF MEASUREMENT. As specified in the special specifications.
415-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 416 - COLD RECYCLING
416-1 DESCRIPTION. The work in this section shall include work required for cold recycling.
416-2 MATERIALS. Materials shall be as specified in the special specifications.
416-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
416-4 METHOD OF MEASUREMENT. As specified in the special specifications.
416-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 417 – ASPHALT PAVEMENT USING RECYCLING TREATMENTS
417-1 DESCRIPTION. This specification includes two processes for in -place recycling asphalt
pavements: heater scarification (HS) and hot -in-place recycling (HIPR). The asphalt pavement surface is heated using specialized equipment to soften the asphalt. In the HS process, the softened asphalt pavement surface is scarified to a specified depth as detailed in the contract documents. The scarified asphalt pavement is then mixed with a recycling agent that rejuvenates the asphalt. This mix is then placed and compacted back onto the roadway. The scarified l ayer must be overlaid. In the case of the HIPR, the multi -step recycling process of the existing pavement includes heating, milling, and adding a recycling agent to rejuvenate the asphalt; then mixing, placing, and compacting the mixture. The resulting recycled pavement does not require an overlay. If the contract documents require the addition of virgin asphalt 19.0 mix during the HIPR process, then the resulting pavement will require an overlay.
417-2 Materials
417-2.01 Recycling Agent. Use a recycling agent specifically designed as a rejuvenator meeting the
requirements outlined in Section 702 – Bituminous Materials , 8. Asphalt Recycling Agent, Table 702 -9 Recycling Agent or Table 702 -10 Emulsified Recycling Agent . At the start of and during production, provide certified test results and documented quantities to the Engineer for each shipment of recycling agent. The use of any other grade of recycling agent or other product requires prior approval from the Direct or, Materials Bureau. A minimum 2 -week notice is needed for this approval.
417-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 417-2.02 Mixture Design. Determine the application rate of the recycling agent for heater scarification and hot in -place recycling by taking and analyzing a minimum of three cores per lane mile or a maximum of 20 cores per project from the existing asphalt pavement. Take these cores from locations that represent the entire project condition. Make sure that the designed application rate of the recycling agent provides the average penetration value of the recovered asphalt binder from the loose mix samples, taken during both the HS and HIPR process, to have an increase of at least 30% or more th an the average penetration value of the recovered asphalt binder from the existing pavement cores. Do not exceed the final penetration value of 90. Perform all the sample tests for the penetration values in accordance with AASHTO T 49, Penetration of Bitum inous Materials .
417-2.03 Virgin Asphalt. When specified in the contract documents, add virgin 19.0 asphalt binder mix
to the Hot -In-Place Recycling mixture. Provide virgin asphalt mixture meeting the requirements outlined in Section 40 4 – Asphalt Pavements . The contract proposal will include the performance -graded (PG) binder, mix type, mix design level, and rate of virgin asphalt mix . Do not use RAP in the virgin asphalt mix.
417-3 CONSTRUCTION DETAILS. §401 -3 and §40 4-3, Construction Details, apply, except as
modified below:
417-3.01 General
417-3.02 Heater Scarification (HS).
417-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Heater Scarification Unit . This equipment must be a self -contained machine designed to reprocess only the upper layers of the existing asphalt pavement. The heater scarification unit must be self -propelled and capable of operating at speeds of 8 to 26 feet per minute while uniformly heating and scarifying the existing asphalt pavement to the minimum loose mix depth specified in the contract documents. Listed below are the various units that are part of the heater scarification train.
417-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 accordance with AASHTO T 49. The average penetration value of the loose mix samples must be at least 30% or more than the penetration of the core samples taken from the existing pavement. If the average penetration values of the loose mix samples fail to meet this requirement, adjust the application rate and submit the new adjusted application rate to the Engineer. Repeat the procedure described above for taking and testing samples. Submit the penetration test results to the Engineer by end of the next day’s production. Continue adjusting the application rate and taking samples until average penetration values of the loose mix samples meet the specification requirement of at least 30% or mor e than the penetration values of the core samples.
417-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 E. Overlay. Once work is completed, overlay the recycled asphalt pavement to the satisfaction of the Engineer. Place the overlay prior to the end of the paving season. This work must be done under a separate pay item in the contract documents.
417-3.03 Hot In -Place Recycling (HIPR).
417-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 of asphalt material is kept to ensure that a constant supply of asphalt material is available for the paver.
417-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 occur. Operate the heating unit(s) in a manner to prevent damage to adjacent property and vegetation. Repair all heat -damaged areas immediately, at no additional cost to the State. Control the speed of the HIPR train to ensure that the recycled pavement is properly milled, mixed, and uniformly distributed to the proper thickness, slope, and crown as shown on the contract plans. Control the width of each pass to provide proper placeme nt of longitudinal joints, including a 3-inch overlap onto adjacent lane passes. Blend the milled asphalt pavement, recycling agent, and virgin asphalt mixture if specified, to produce a homogenous asphalt recycled mix. Use the application rates of the recycling agent and virgin asphalt mix as determined by the mix design. If virgin asphalt mix is required, the addition into the recycling process must be within ± 2.2 lbs/yd2 of the mix design target. The temperature of the recycled mixture must be between 250ºF and 325ºF prior to initial compaction. Ensure that the final recycled pavement conforms to the requirements of §40 4-3.10, Surface Tolerance and §40 4-3.11, Thickness Tolerance . Measure the depth of the loose recycled mix behind the screed unit prior to the rolling operation. Adjust the paving equipment if the loose mix depth does not provide the compacted depth specified in the contract documents. In areas not accessible to recycling equipment, such as around catch basins or manholes, the Engineer will determine if they require repair. Pavement surfaces that are in good condition do not require repair. Repair all areas with cracks or spalls, as appr oved by the Engineer, at no additional cost to the State.
417-4 Method of Measurement
417-4.01 General (Vacant)
417-4.02 Heater Scarification (HS). This work will be measured as the number of square yards of
pavement surface recycled as detailed in this specification.
417-4.03 Hot in -Place Recycling (HIPR). This work will be measured as the number of square yards of
pavement surface recycled as detailed in this specification. Virgin asphalt mix will be measured as the number of tons of asphalt mixture furnished and incorporated in the work. A QAF of 1.00 will be assigned to virgin material meeting the specification requirements as tested by the QCT. A QAF of 0.85 will be assigned to virgin material that fails to meet the specification. Quality Units wil l be determined when there is a disincentive and will be calculated as per §40 4-4, Method of Measurement .
417-4.04 Recycling Agent. The quantity of recycling agent to be measured for payment will be the
number of gallons incorporated in the work, measured at a temperature of 60ºF. The following formula will be used to calculate material quantity at 60°F: Volume@ 60°F = Volume D x [1 – (ΔT x 0.00025)] Where, ΔT = Delivered Temperature (°F) – 60 Volume D = Quantity at Delivered Temperature (gallons)
417-5 BASIS OF PAYMENT. Removal of pavement markings and cleaning of the existing pavement
will be paid under separate pay items in the contract documents.
417-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 417-5.01 General (Vacant)
417-5.02 Heater Scarification (HS). The unit price bid per square yard for this item shall include the
cost of all labor, materials and equipment necessary to satisfactorily complete the work, including heating, scarifying, mixing, paving, compacting, coring, and testing of the recycled mate rials. No deduction will be made in areas such as catch basins or manholes where the scarifying equipment cannot be used.
417-5.03 Hot in -Place Recycling (HIPR). The unit price bid per square yard for this item shall include
the cost of all labor, materials and equipment necessary to satisfactorily complete the work, including heating, milling, mixing, paving, compacting, coring, and testing of the recycled materia ls. No deduction will be made in areas such as catch basins or manholes where the recycling equipment cannot be used. The provisions of §40 4-5, Basis of Payment shall apply for virgin asphalt mix . When there is a disincentive, the payment adjustment will be made based on the Index Price listed in the contract documents. The index price shown in the itemized proposal for each Quality Unit shall be considered the price bid. The unit (index) price is NOT to be altered in any manner by the bidder. Should the bidder alter the price shown, the altered figure will be disregarded and the original price will be used to determine th e total amount bid for the contract.
417-5.04 Recycling Agent. The unit price bid per gallon of recycling agent shall include the cost of all
labor, material, and equipment necessary to complete the work satisfactorily. The Regional Materials Engineer will evaluate the material represented by any failing sample of recycling agent. If the Engineer elects to leave the material in place, the Contra ctor shall receive a pay reduction of 75% of the bid price of the recycling agent for the pavement section represented by the failing sample. Payment will be made under: Item No. Item Pay Unit 417.01 Heater Scarification Square Yard 417.02 Hot In -Place Recycling Square Yard 417.0101 Recycling Agent Gallon SECTION 418 – ASPHALT PAVEMENT JOINT ADHESIVE (New Section September, 2016)
418-1 Description
This work shall consist of furnishing and installing joint adhesive in accordance with the contract documents and as directed by the Engineer.
418-2 Materials
Use a product which appears on the NYSDOT Approved List under ASPHALT PAVEMENT JOINT ADHESIVE (705 -19) meeting the requirements of §705-19.
418-3 Construction Details
418-3.01 General . Furnish all equipment that is necessary to clean the construction joint and to apply the
joint adhesive. Use equipment meeting the description and/or performance requirements described herein and approved by the Engineer. Apply the joint adhesive to the construction joints.
418-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 418-3.02 Joint Preparation . Prepare longitudinal and transverse construction joints as discussed below and place adjacent asphalt pavement on the same day that the joint adhesive is applied. Use a high pressure air lance to thoroughly clean the joint surface of dust, dirt, foreign material, sand and any other extraneous materials immediately prior to applying the joint adhesive. Install suitable traps or devices on the compressed air equipment to prevent moistur e and oil from contaminating the joint surfaces. Maintain these devices and see that they are functioning properly. Protect the public from potentially objectionable and/or hazardous airborne debris.
418-3.03 Joint Adhesive. Heat and melt the joint adhesive in a melter constructed either as a double
boiler filled with a heat -transfer medium between the inner and outer shells, or with internal tubes or coils carrying joint adhesive through a heated oil bath and into a heated d ouble wall hopper. The melter will be equipped with separate thermometers to indicate the temperature of the heat transfer medium and the joint adhesive material, positive temperature controls, and with a mechanical agitator or a re circulation pump to assure a homogeneous blend of the joint adhesive. Check the discharge temperature of the joint adhesive with a non -contact infrared thermometer or other suitable thermometer. Discharge the joint adhesive at the manufacturer's recommended application temperature and maintain the joint adhesive at ± 10°F of the application temperature indicated on the material packaging. Applying joint adhesive is not permitted if the melter and discharge temperatures do not meet the requirements described above. Equip the discharge hose with a thermostatically controlled heating apparatus or insulate it to maintain the proper joint adhesive application temperature. Holster the discharge hose to the melter if it is not thermostatically heat controlled. Circulate th e joint adhesive from the discharge hose and the melter to maintain the proper joint adhesive application temperature. Do not use joint adhesive material that has been heated beyond the safe heating temperature. If the manufacturer's recommendations allow the joint adhesive to be reheated or heated in excess of six hours, recharge the melter with fresh material amounting t o at least 20 percent of the volume of the material remaining in the melter.
418-3.04 Application . Apply the joint adhesive when surface temperature is 40°F and rising. Use an
applicator wand fitted with a sealing shoe to strike -off the adhesive. Strike -off the joint adhesive to provide a 1/4 inch to 3/8 inch thick band. The finished bands are to be a pproved by the Engineer.
418-4 Method of Measurement
This work will be measured as the number of linear feet of joint adhesive satisfactorily furnished and installed.
418-5 Basis of Payment
The unit price bid shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work.
418-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Payment will be made under: Item No. Item Pay Unit 418.7603 Asphalt Pavement Joint Adhesive Linear Foot SECTION 419 - FOG SEAL
419-1 DESCRIPTION. The work in this section shall include work required for fog seal (stand alone for
shoulder and median).
419-2 MATERIALS. Materials shall be as specified in the special specifications.
419-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
419-4 METHOD OF MEASUREMENT. As specified in the special specifications.
419-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 420 - POROUS ASPHALT PAVEMENT
420-1 DESCRIPTION. The work in this section shall include work required for porous asphalt
pavement.
420-2 MATERIALS. Materials shall be as specified in the special specifications.
420-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
420-4 METHOD OF MEASUREMENT. As specified in the special specifications.
420-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 421 STONE MATRIX ASPHALT (SMA) PAVEMENTS
421-1 DESCRIPTION. The work in this section shall include work required for Stone Matrix Asphalt
(SMA) .
421-2 MATERIALS. Materials shall be as specified in the special specifications.
421-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be covered
by special specifications in the contract documents.
421-4 METHOD OF MEASUREMENT. As specified in the special specifications.
421-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTIONS 422 THRU 489 - (VACANT)
490-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 SECTION 490 - COLD MILLING
490-1 DESCRIPTION. This work shall consist of the milling, shaping and removal of portions of
existing surfaces by a cold milling process, and subsequent cleaning, utilizing equipment and procedures meeting the requirements in this specification. The work shall consist of Miscellaneous Cold Milling or Production Cold Milling of bituminous or portland cement concrete as indicated in the contract documents and as shown on the plans.
490-2 Materials
490-2.01 Equipment. Milling machines shall be power operated, self -propelled machines capable of
removing the desired thickness of existing surfaces. The machines shall have sufficient power, traction and stability to accurately maintain depth of cut and slope. They shall be capable of producing a finished profile and cross slope to within 1/4 inch of that required and shall produce a uniform surface texture free from gouges and ridges greater than 3/8 inch in depth. The machines shall be equipped with a means to control dust and other particulate matter created by the cutting action. The machines shall have an integral loading system or sufficient equipment shall be provided to accomplish complete removal of milled material at a rate equivalent to the milling rate. Vacuum trucks, street sweepers or power brooms shall be used to clean the milled surfaces. The Engineer may disallow the use of power brooms in urban, residential or other sensitive areas if the dust raised by the broom is deemed by the Engineer to be obj ectionable.
490-2.02 Disposal of Material. Material removed during the milling process, including foreign debris
within or on the pavement, shall become the property of the Contractor and shall be disposed of at a site obtained by the Contractor.
490-3 Construction Details
490-3.01 General. Milling shall be performed at the locations and in accordance with the details
indicated on the plans. When indicated on the plans, profile and cross slope shall be controlled by a taut reference string line. The reference elevation and string line shall be established by the Contractor and subject to the approval of the Engineer. Areas not accessible to the milling machine, such as around and/or adjacent to inlets, manholes, curbs and transverse joints on structures, may be removed by a small milling machine, handwork or other methods approved by the Engineer. All milled material, including that removed by other means, shall be immediately removed from the milled surfaces and adjacent surfaces. Surfaces shall be cleaned of all fines and dust prior to opening to traffic. The Contractor shall conduct operations i n such a manner that dust is controlled and is not objectionable. Milled and adjacent surfaces shall be cleaned again, as directed by the Engineer, prior to the placement of tack coats, or pavement courses if traffic has been allowed on the milled surface and/or if more than 48 hours have elapsed since the initial cleaning. The Contractor shall maintain drainage at catch basins, according to the details shown on the plans, or in a manner approved by the Engineer. When working adjacent to traffic, the Contractor shall immediately remove material that is spilled on the traveled way. Milled surfaces to be overlaid with asphalt concrete shall be covered with at least a single course of asphalt concrete before the end of the paving season. Portland cement concrete overlays shall be completed over milled surfaces before the end of the pa ving season. Damage to milled surfaces resulting
490-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 from traffic or other causes such as, but not limited to, raveling, fuel spillage or any contaminants which would inhibit bond, shall be repaired or remilled by the Contractor in a manner approved by the Engineer.
490-3.02 Production Cold Milling. Production cold milling of bituminous or portland cement surfaces
shall be performed in accordance with the details and at the locations indicated on the plans.
490-3.03 Miscellaneous Cold Milling. Miscellaneous cold milling of bituminous or portland cement
surfaces shall be performed in accordance with the details and at the locations indicated on the plans.
490-3.04 Production Cold -Mill Surface Planing . Production cold -mill surface planing of bituminous
concrete surfaces shall be performed in accordance with the details and at the locations indicated on the plans. When specified, the milling machine shall control the profile and cross slope with a mov ing reference at least 30 feet in length. The moving reference may be a floating beam, ski, or other suitable type such that the resulting milled surface is sufficiently even. In areas accessible to the milling machine, construct a milled surface to a maximum 1/2 inch tolerance. If the pavement surface is not being constructed or has not been constructed to this tolerance based upon visual observation or upon riding quality, the Engineer may test the surface with a 15 foot straight edge or string line placed parallel to the centerline of the pavement and with a 10 foot straight edge or string line placed transversely to the centerline of the pavement on any portion of the pavement . Variations exceeding 1/2 inch will be satisfactorily corrected at no additional cost to the State.
490-4 METHOD OF MEASUREMENT. The quantity shall be measured as the number of square
yards of pavement surface milled in accordance with the plans and this specification. In no case will a deduction in area be made for minor unmilled areas due to catch basins, manholes, transverse joints, or minor low areas in pavements from the measured surface area that has been milled. Minor unmilled or low areas are those areas of 10 square yards or less.
490-5 BASIS OF PAYMENT. The unit price bid per square yard shall include the cost of furnishing all
labor and equipment necessary to complete the milling, including the removal of pavement by other means, the removal and disposal of milled material, the removal and hauling of milled material to a designated stora ge area when indicated in the contract documents and cleaning the resultant surface after milling. No payment will be made for additional cleaning that may be necessary just prior to placement of any overlaying pavement courses or tack coats. The cost of maintaining drainage shall be included in the price bid for work zone traffic control. The cost of providing tack coats, overlay courses, and temporary pavement wedges around drainage structures, manholes, valve boxes, bridge abutments and beginning and ends of milled pavement shall be paid for separately. Payment will be made under: Item No. Item Pay Unit 490.10 Production Cold Milling of Bituminous Concrete Square Yard 490.15 Production Cold -Mill Surface Planing of Bituminous Concrete Square Yard 490.20 Production Cold Milling of Portland Cement Concrete Square Yard 490.30 Miscellaneous Cold Milling of Bituminous Concrete Square Yard 490.40 Miscellaneous Cold Milling of Portland Cement Concrete Square Yard SECTIONS 491 THRU 499 (VACANT)
501-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Section 500 PORTLAND CEMENT CONCRETE SECTION 501 - PORTLAND CEMENT CONCRETE - GENERAL
501-1 DESCRIPTION. These general requirements apply to concrete furnished for pavement, structures
and incidental construction. Additional requirements may be specified in the contract item. All testing will be done in accordance with Department procedures.
501-2 Materials
501-2.01 Composition of Mixtures. The Contractor shall inform the Regional Director, in writing, of
the materials sources prior to mixing concrete. Proportion a homogenous Portland cement concrete mixture using the pre -approved materials listed under 501 -2.02, Material Requirements . Produce the class of concrete indicated in the contract documents. However, substitutions may be made according to Table 501 -1, Concrete Class Options. TABLE 501 -1 CONCRETE CLASS OPTIONS Concrete Class Allowable Class Options A C, E, F1, H or HP C HES2 D DP DP None E H or HP H HP F, G, GG, or HP None I J J None Notes:
501-2.02 Material Requirements
Portland Cement 701-01 Admixtures 711-08 Blended Portland Cement 701-03 Fly Ash 711-10 Concrete Sand 703-07 Microsilica 711-11 Coarse Aggregate 703-02 GGBFS * 711-12 CNBCI ** 711-13 HRP *** 711-14 Water 712-01 * Ground Granulated Blast Furnace Slag ** Calcium Nitrite Based Corrosion Inhibitors *** High Reactivity Pozzolan
501-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 A. Cementitious Materials. Use only cementitious materials meeting §701 -01 whose brand name and type appears on the Department’s Approved List. Cementitious materials stored over the winter at concrete producing facilities will be retested for specification compliance. All conta minated, or hardened cementitious material will be rejected and not used in Department work. The Department will consider requests to evaluate alternate cements, pozzolan or microsilica . The use of alternatives is subject to approval by the Director, Materials Bureau.
501-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Engineer, these materials may be allowed in lieu of microsilica in specialized and high performance concrete mixtures.
501-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (2) For concrete mixtures containing CA1 coarse aggregate: gravel or a blend of rock types containing no less than 90.0% noncarbonate particles (by weight with adjustments to equivalent volumes for materials of different specific gravities) in the minus 1 inch , plus 1/4 inch primary size fraction.
501-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 e. Type 9 Coarse Aggregate. Use coarse aggregate meeting the requirements of §501 -2.02 B.1.b. Coarse Aggregate.
501-2.03 Concrete Batching Facility Requirements. Batching facilities must be of sufficient design
and capacity to produce the quantity of concrete specified. Batching facilities that differ from conventional designs will be considered for use by the Director, Materials Bureau.
501-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. Load cell type scales which indicate the load at all stages of the weighing operation, from zero to full capacity, when installed for weighing materials after January 2, 2003.
501-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 d. Control the cycle sequence.
501-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 G. Recordation Equipment. Equip all plants with digital recording instruments approved by the Director, Materials Bureau, that meet the following requirements:
501-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 4. Protected from a noise level greater than an 8 hour, time weighted average of 85 dBa.
501-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (1) Anchored to a firm base.
501-2.04 Concrete Mixer and Delivery Unit Requirements. Each mixer requires a Manufacturer's
plate, which contains the mixing capacity of the mixer, in a convenient visible location. Repair or replace blades inside the drum that have become heavily encrusted with mortar, or are loose, broken, bent, scalloped or worn 20% in any dimension or otherwise damaged.
501-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Delivery Units. Delivery units are subject to inspection as per NYSDOT Materials Method 9.1 and approval by the Regional Director. If found unfit, it will be disapproved until properly repaired. Completely clean and empty the agitating and non -agitating units of concr ete and wash water before loading again.
501-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Non - Agitating/Open Haul Units for Central Mixed Concrete. Each truck shall be:
501-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 e. Adds admixture in the amount necessary to achieve the required air content.
501-3 Construction Details
501-3.01 Proportioning. Proportion all ingredients, except for admixtures, according to Table 501 -3,
Concrete Mixtures and as determined by the Department unless otherwise indicated in the contract documents. Any concrete mix design not meeting the requirements of Table 501 -3 will be subject to approval by the Director, Materials Bureau.
501-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 TABLE 501 -3A POZZOLAN SUBSTITUTIONS Concrete Class Specified Substitute Cement by Mass With Class Substitution Allowed A, C, E, H 15-20% Class F Fly Ash ( 711-10) HP1 I, J 15-20% Class F Fly Ash ( 711-10) - D 15-20% Class F Fly Ash ( 711-10) DP1 G2 and GG2 20% Class F Fly Ash ( 711-10) - F No Substitution Allowed - NOTES:
501-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Water. Add water to obtain the slump desired by the Engineer, within the Design Mix Guidelines of Table 501 -3, Concrete Mixtures. The Engineer will test the concrete for slump, and reject concrete with a slump greater than the guidelines for use in Department work. Concrete with insufficient slump may be adjusted to within the guidelines of §501 -3.03 by adding water and remixing, when permitted by the specifications or the Engineer.
501-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 HP 2 675 40.0 0.40 6.5 (5.0 - 8.0) 3 - 5 CA 2 pumping, structural slabs, approach slabs, substructures exposed to chlorides I 4 640 41.0 0.44 6.0 (4.0 - 8.0) 1/2 - 1 1/2 CA 2 slip forming highway median barriers J 4 680 45.8 0.44 6.0 (4.0 - 8.0) 1/2 - 1 1/2 CA 1 slip forming structural median barriers, parapet walls and curbs NOTES :
501-3.02 Handling, Measuring and Batching Materials. Arrange the batching facility and equipment
to assure a continuous supply of material to the work. When written approval is granted by the Director, Materials Bureau, bagged material may be incorporated into the mix. Adjust the batch size to use whole bags of bagged material. The handling, measuring and batching of bagged material must be verified and documented by a Department representative.
501-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 obtained by heating only the mix water. The equipment and operations for heating the materials must be approved by the Regional Director prior to use on Department projects. Specified Temperature Range Minimum Maximum Mix Water 70°F 180°F Aggregate 40°F 100°F Plastic Concrete in place 50°F 70°F To avoid the possibility of flash set when water is heated over 100°F , combine the water and aggregate in the mixer so that the water temperature is reduced before cement is added.
501-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 7. Truck Number
501-3.03 Concrete Mixing, Transporting and Discharging.
501-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 has reached the mid -point of the slump range, as indicated in Table 501 -3, Concrete Mixtures, for the class used. Concrete with a discharge temperature exceeding 90°F will be subject to rejection. Notify the Regional Materials Engineer’s office by 3:00 PM on the day before any production for the Department. Supply fresh concrete at a rate consistent with placement operations as determined by the Engineer. The Regional Director may disapprove the use of any type of concrete mixing or transporting units when unsatisfactory results occur. Load the mixer, regardless of type, in a manner approved by the Regional Director and mix batches of concrete no larger than the rated capacity shown on the Manufacturer's plate. A summary of time limitations for various types of concrete mixing equipment, from the beginning of batching to the completion of discharge, is given in Table 501 -7, Summary of Concrete Batching, Mixing, Hauling and Discharging.
501-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Two additions of water will be allowed at the discharge point to obtain initial slump. After each addition, mix the concrete at least 30 mixing -speed revolutions before discharging. The initial loads may, with prior written approval by the Regional Materials Engineer, also be adjusted by using a water - reducing admixture (711 -08, ASTM Type A). This adjustment will be limited to the first trucks arriving for a particular placement before any adjustments have been made at the batching facility. Observe the ma ximum number of mixing revolution or water addition requirements. Make all subsequent admixture additions or adjustments during production at the batching facility. No additions or adjustments are allowed when non -agitating / open haul units are used. TABLE 501 -6 TIME LIMITS FOR DELIVERY AND DISCHARGE OF CENTRAL MIXED CONCRETE Delivery Unit Maximum Time (Minutes) Non-Agitating / Open haul 30 Agitating - rotating drum 90 * * The Engineer will reject the concrete if there is evidence of initial set, and may reduce the time limit in hot weather or under unusual conditions if unsatisfactory results occur. For concrete that does not contain a water - reducing and retarding admixture, the time to initial strike -off or placement of subsequent lifts is included in the delivery and discharge time limit.
501-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Completion of Discharge (When concrete is transported in units approved for mixing, see Note 1) │ Minutes max. (Note 2) │ │ │ │ │ │ │ │ │ │ │ ▼ 100 rev. minimum 200 rev. maximum Mix: 6 -18 rpm All Other Classes 100 rev. minimum 160 rev. maximum Mix: 6 -18 rpm End of Mixing Agitate 2 -6 rpm Begin Discharge 50 Minutes maximum Completion of Discharge 100 rev. minimum 200 rev. maximum Mix: 6 -18 rpm All Other Classes 100 rev. minimum 160 rev. maximum 15 Minutes maximum End of Mixing Agitate 2 -6 rpm Begin Discharge 30 Minutes maximum Completion of Discharge NOTES:
501-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 E. Truck Mixed Concrete. Truck mixed concrete is concrete completely mixed in a truck mixer meeting the requirements of §501 -2.04B.1.b. Truck Mixers, after adding water at the discharge location. Apply §501 -3.03D. Transit Mixed Concrete, except as follows:
501-4 METHOD OF MEASUREMENT. The Engineer will compute the volume of concrete as the
number of cubic yards within the payment lines indicated on the plans or as specified by the Engineer. No deductions will be made for the volume of embedded reinforcement, structural shapes or joint materials. Also, no deductions will be made in concrete pavement for catch b asins, manholes, etc. unless otherwise indicated in the contract documents.
501-5 BASIS OF PAYMENT. Include the cost of furnishing all materials, equipment and labor
necessary to complete the work in the unit price bid for the appropriate items. SECTION 502 - PORTLAND CEMENT CONCRETE PAVEMENT (Last Revised May, 2019)
502-1 DESCRIPTION. Construct a Portland Cement Concrete (PCC) pavement and shoulders, if
required, as detailed in the contract documents.
502-2 Materials
Portland Cement Concrete 501 Chemically Curing Adhesive for Portland Cement Concrete (PCC) 701-14 Pavement Applications Highway Joint Sealants (ASTM D6690, Type IV) 705-02 Premoulded Resilient Joint Filler 705-07 Preformed Elastic Longitudinal Joint Seal 705-10 Preformed Elastic Transverse Contraction and Expansion Joint Seal 705-12 Lubricant for Preformed Elastic Joint Sealer 705-13 Longitudinal Joint Ties 705-14
502-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Transverse Joint Supports 705-15 Wire Fabric for Concrete Reinforcement 709-02 Epoxy Coated Bar Reinforcement, Grade 60 709-04 Quilted Covers (for curing) 711-02 Plastic Coated Fiber Blankets (for curing) 711-03 Polyethylene Curing Covers (white opaque) 711-04 Membrane Curing Compound 711-05 Form Insulating Materials for Cold Weather Concreting 711-07 Water 712-01 If requested, provide the Engineer with any appropriate manufacturer’s details and/or instructions for use of listed materials before use of the product. In addition to meeting the requirements of §701 -14, Chemically Curing Adhesive for Portland Cement Concrete (PCC) Pavement Applications, the material used to anchor longitudinal joint ties, dowels, or other miscellaneous items into hardened concrete must b e a pourable, two -component, 100% solid structural epoxy dispensed:
502-2.01 Concrete. Use Class C concrete furnished in accordance with Section 501, Portland Cement
Concrete – General, when specified. High -Early -Strength (HES) concrete, meeting the requirements of §502 -2.02, may be substituted for closure or short placements, subject to t he Engineer’s approval.
502-2.02 High -Early -Strength (HES) Concrete. Use HES concrete where required in the contract
documents or where the Contractor’s request to use HES concrete is approved by the Engineer. Whether required or requested, design the HES mix to satisfy the opening to traffic time requirements of the project and Table 502 -1, High -Early -Strength Concrete Mix Requirements. Submit the HES concrete mix design to the Engineer. Include admixture bran ds and dosages as well as mixing, transporting, placing, paving, curing, and anticipated strength gain details. Produce and place a 4.0 yd3 (minimum) trial batch at an off -contract location selected by the Contractor and agreed upon by the Engineer. Produce the trial batch using the same materials and processes as those to be used to produce concrete for the contract. Provide the Engineer a 7 -day minimum advance notification of trial batch production. Produce and place the trial batch in the presence of the Engineer, the Regional Materials Engineer, and Materials Bureau personnel. Provide an American Concrete Institute (ACI) Certified Concrete Field Testing Technician, Grade I, or higher, to:
502-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 TABLE 502 -1 HIGH -EARLY -STRENGTH CONCRETE MIX REQUIREMENTS Property Minimum Desired Maximum 28 Day Compressive Strength 4000 psi - - Opening Compressive Strength 2500 psi1 - - Freeze -Thaw Loss (Test 502 -3P, 3% NaCl) - 0.0 % 3.0 % Plastic Air Content 5.0 % 6.5 % 8.0 % Water – Cement Ratio (w/c) - - 0.40 Slump2 - - - NOTES:
502-2.03 Performance Engineered Mixes (PEM). If specified, design a concrete mixture proportioned
to meet the requirements of the contract documents. Procedures for mix approval and acceptance will also be included in the contract documents.
502-2.04 Load Transfer Dowel Bars. Refer to 705 -15 for Dowel bar requirements. If specified, load
transfer dowel bars other than epoxy coated steel may be required. The material requirements as well as the approval and acceptance procedures will be included in the contract documents.
502-3 CONSTRUCTION DETAILS. Hold a pre -pave meeting 7 to 14 day before the planned start of
paving with the Engineer, any PCC paving and saw cutting subcontractors, and concrete suppliers to coordinate all aspects of paving and inspection, including equipment review, construction me thods, and time and personnel requirements. Construct a smooth, well consolidated, properly finished, textured, and cured pavement to the line and grade depicted in the contract documents, ± 1/4 inch vertically at any location.
502-3.01 Equipment. Provide the Engineer with an equipment list and specifications a minimum of 14
days prior to the planned start of PCC paving. Bring all equipment needed to place, consolidate, finish, texture, cure, saw cut, seal, and test the PCC pavement to the job site a minimum of 1 full work day before its use to allow examination by the Engineer. Repair or replace any equipment found to be defective before or during its use. Discontinue any operation if unsatisfactory results are being obtained. Use of equipment other than described below is subject to the approval of the Director, Materials Bureau.
502-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. Forms. Use straight forms without horizontal joints meeting Table 502 -2, Form Requirements, and equipped with:
502-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Use hand -held vibrators capable of operating through a frequency range of 6,000 - 10,000 vibrations per minute in any location that is not consolidated by internal vibrators attached to the paving equipment.
502-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 H. Air Blasting Equipment. Use equipment with traps or other installed devices that prevent moisture and oil from contaminating the concrete surface. Use a compressor that delivers air at a minimum of 120 cfm and develops a minimum nozzle pressure of 90 psi. Check the compressed a ir stream purity daily with a clean white cloth.
502-3.02 Weather Limitations
502-3.03 Subbase Course. Install a subbase course in accordance with Section 304, Subbase Course,
before placing PCC. If the area is available, extend the prepared subbase course at the same line, grade, and cross slope as the area being paved such that it is at least:
502-3.04 Slipform Paving. Establish a reference system to achieve the specified smoothness level. If
string lines are used, set them by survey and use dual lines whenever possible. Maintain uniform concrete quality and head in front of the paver. Coordinate concrete delivery to maintain continuous forward movement of the paver and avoid excessive delivery truck queues. Keep paver tracks clear of concrete and debris before and during paving. Wet the entire subbase surface without forming puddles or mud immediately before placing concrete. Consolidate the entire concrete placement using internal vibrators attached to the paver. Combine paver forward speed, vibrator frequency, and vibrator depth to consolidate the concrete without segregation, vibrator trails, or contacting the joint assembl ies. Discontinue vibration and tamping if the paver stops. Determine edge slump by extending a 2 foot (minimum) long straightedge over the longitudinal pavement edges. Immediately correct edge slumps greater than 1/4 inch that are between concrete placements and greater than 3/8 inch at free edges and HMA shoulder s.
502-3.05 Fixed Form Paving.
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 with a minimum of 3 pins, each of sufficient length to hold the forms in place without movement during any operation. Lock the forms together such that the form ends are aligned and the joints are tight and smooth. Run the paving equipment atop the forms b efore placing any concrete and recheck form alignment. Reset forms as necessary. Align keyway strips in a smooth, horizontal plane, parallel to the top of the form. Match keyway strips on abutting forms such that a nearly seamless keyway results.
502-3.06 Joint Construction. The Engineer will inspect the longitudinal joint ties and transverse joint
supports for compliance to the relevant Materials Details before any joint hardware placement is allowed. Construct joints in accordance with the Standard Sheets and approved Mater ials Details. Do not stand on joint hardware. Base final joint layout on construction staging and the actual location of utilities, drainage structures, intersections, tapers, and other irregular areas. Submit a proposed joint layout to the Engineer at least 10 calendar days prior to PCC paving. Obtai n the Engineer’s approval of the joint layout before paving. Inserting dowels and/or longitudinal joint ties into plastic concrete will be considered. Submit a plan to verify dowel and tie locations, depth, and alignment to the Engineer for consideration. Do not insert dowels or ties until the plan is approved by th e Engineer. Make first -stage saw cuts 1/8 inch wide. Make second -stage saw cuts, clean, and seal joints in accordance with §502 -3.12, Sealing Joints.
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Lmax = W min × 1.33 Lmin = W max ÷ 1.33 where : Lmax = maximum transverse joint spacing (slab length) Lmin = minimum transverse joint spacing (slab length) Wmax = maximum slab width across the pavement (load carrying slabs only) Wmax ≤ 13 feet Wmin = minimum slab width across the pavement (load carrying slabs only)
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 2. Transverse Expansion Joints. Construct transverse expansion joints as part of the utility and drainage structure isolation systems depicted in the Standard Sheets or where indicated in the contract documents. Handle and position expansion joint supports in accordance with §502 -3.06A1 , Transverse Contraction Joints. Construct expansion joints using 1/2 inch thick remolded resilient joint filler placed in 1 piece between longitudinal joints. Tightly place and support abutting sections of joint filler such that no concrete infiltrates the joint. Place expansion caps on the dowels as depicted in the Materials Details. Do not tap or hammer the caps onto the dowels. No saw cuts are required in expansion joint construction. Remove the finishing cap, if supplied, after the concrete has developed sufficient strength to prevent damage.
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 3.06, Transverse Joints. (This situation typically occurs near structures that are skewed from perpendicular to the pavement centerline.) Locate hinge joints such that they are equally spaced between other types of transverse joints. Construct hinge joints in accordance with §502 -3.06A1, Transverse Contraction Joints, except the positioning requirements do not apply. Instead, position transv erse hinge joint supports such that the:
502-3 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 In a fixed form operation, construct either a butt or a keyed joint. Drill and anchor one -piece ties as discussed above, or use multiple -piece ties. Apply a corrosion inhibiting coating to the threads of all multiple -piece tie components before assembly. B olt the female portion of the tie to the form prior to paving as depicted in the Standard Sheets. Insert and tighten the male ends before paving the adjacent lane. Ensure all threaded connections are tight. First-stage saw cuts are not required between lanes paved separately.
502-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Place the anchoring material in the back of the hole using a nozzle with sufficient reach. Push the dowel or tie into the hole while twisting such that the air pocket within the hole is heard to burst and the anchoring material is evenly distributed aroun d the bar. Use sufficient amounts of anchoring material such that it slightly extrudes out the hole as the bar is inserted.
502-3.07 Paving Adjacent To Existing Concrete. Wherever paving equipment operates on existing PCC
pavement that is to remain, install bolt -on track covers or rubber tired, flangeless wheels. Remove all debris on the existing PCC pavement in the equipment track. Immediately remove any concrete that spills onto the existing concrete. When paving from (or to) a transverse construction joint or intersecting pavement, use hand -held vibrators to thoroughly consolidate any concrete inaccessible to the paving equipment vibrators. Hand finish these areas with the minimum effort required to pr oduce an acceptable surface. Do not dump the grout box head into the pavement concrete when approaching a construction joint.
502-3.08 Plastic Thickness Determination. Provide the Engineer with a round, rigid, nonaluminum
probe, having a 1/8 inch diameter. The Engineer will determine the plastic concrete thickness by inserting the probe and measuring the insertion depth. The Engineer will check thickness at least every 150 feet of paving and at least 2 feet from the placement edge. Keep several probes at the project. The minimum measured plastic thickness must be equal to ( -1/4 inch) or greater than the thickness required in the contract documents. Areas not meeting minimum thickness will be treated in accordance with §502 -3.14, Damaged or Defective Concrete. If 2 consecut ive measurements do not meet minimum thickness, stop paving and reestablish the paving operation to achieve acceptable thickness.
502-3.09 Finishing. Provide an ACI certified concrete flatwork finisher to supervise finishing. Provide
proof of ACI flatwork certification to the Engineer. Mechanically finish the pavement after consolidation and strike off. Use machine mounted finishers such as full -width finishing pans, transverse oscillating screeds, longitudinal floats, pan floats or separate pieces of equipment such as tube floats. Corre ct bumps with a 16 foot straight edge or bump cutter specifically made for finishing concrete. After mechanical finishing, hand finish the pavement to correct and seal minor imperfections. Hand finish with magnesium floats, lutes, and/or trowels. Use work bridges to hand finish concrete inaccessible from the pavement edge. Keep hand finishing to a minimum. Do not use excess mortar or discarded concrete to fill low areas. Do not add water to the concrete surface to close imperfections. Do not trowel bleed water into the surface. Stop paving or reformulate the concrete mix if surface imperfections that require additional water to close routinely occur. Ensure the saw cut operator can locate joint sealant locations between separate, adjacent placements. This may be accomplished with a small radius (1/4 inch) edger along the edge of the second placement.
502-3.10 Texturing. Immediately after finishing and prior to applying the curing compound, texture the
concrete surface using one of the following procedures in accordance with the contract documents. Apply longitudinal tining if no texturing method is designated in the cont ract documents. Additional requirements, such as Mean Texture Depth measured by a sand patch test or a profiler may be performed to check texturing adequacy. For a closed drainage system, provide an 8 - 12 inch blank in the texture along the pave ment edges to enhance drainage to catch basins.
502-3 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 inch deep with minimal dislodging of aggregate. Do not make multiple tine passes in the same area. Keep tines 2 - 4 inches from the placement edges. Keep the tines free of hardened concrete.
502-3.11 Curing. Apply curing compound no later than 5 minutes after texturing. The Engineer may stop
paving if curing lags beyond the time limits noted. Cure Class C concrete placed between June 1 and September 15 for 4 days, minimum. Cure Class C concrete placed between September 16 and May 31 for 6 days, minimum. Cure HES or alternate mixes in accordance with Materials Bureau requirements based on the Contractor -submitted mix design and the trial batch evaluation.
502-3.12 Sealing Joints. Seal joints in accordance with the Standard Sheets.
First-stage saw cuts may be temporarily left unfilled if a placement is only subjected to occasional construction traffic, such as pickup trucks or cars. In this case , ensure debris does not enter the joints.
502-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 A. Temporarily fill unsealed first -stage cuts with jute or backer rod if a placement is:
502-3 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 down the free concrete edges. Wash the resulting slurry from the pavement and joint immediately after making second -stage saw cuts and/or bevels. Second -stage saw cuts may be delayed for convenience, but do not leave second -stage saw cuts unsealed or unfilled while open to any traffic. Temporarily fill second -stage saw cuts with jute or backer rod if (1) they are exposed to any traffic before cleani ng and sealing or (2) weather conditions are not favorable for timely (within 2 calendar days) cleaning and sealing, whether or not they are exposed to any traffic. Clean the joints by pressure washing before sealing. Use (1) a 900 psi minimum pressure and (2) a maximum pressure such that no damage occurs to the concrete. Manually dislodge debris remaining in the joint after cleaning, and reclean the joint. Within 24 hours of pressure washing, air blast the joint to remove any debris from the cut and dry the exposed faces. Reclean the joint if it rains between cleaning and sealing. Do not allow any traffic on the pavement between cleaning and sealing. Install the sealant in accordance with the Manufacturer’s written instructions. Lubricate the concrete, the sealer, or both before installation such that the lubricant fully covers the sealer/concrete interface, but not the top of the sealer. Install one piece of transverse joint sealer in a compressed condition across the full pavement width, including concrete shoulders, and down the vertical saw cut at the free edge. Cut the longitudinal sealer where it crosses a transverse joint. Do not sp lice the longitudinal sealer between transverse joints. Seal the intersection between longitudinal and transverse sealers with lubricant. Install the sealer such that it is not stretched more than 5%, nor compressed more than 2%, of the minimum theoretical length. Check the installation for stretch and compression by installing sealers in 5 transverse joints and removing the sealer immediate ly after installation and checking the length. An alternate method for checking stretch and compression, where applicable, may be performed by premarking or precutting the sealer to length prior to installation. If the measurement of any of these 5 sealers exhibits stretching in excess of 5% or compression in excess of 2%, modify the installation method to meet the requirements or discontinue installation. Once sealing operations begin, remove 1 joint per 100 in the presence of the Engineer to check stretch and compression. If the sealer is found to be stretched in excess of 5% or compressed in excess of 2%, remove the sealer material from successive joints in both directions until sealers are found that meet the stretch and compression requirements. Replace all joints sealers found with excess stretch or compression. Replace joint sealers removed and found to meet the stretch and compression requirements.
502-3.13 Pavement Protection. Protect the pavement and appurtenances from traffic and construction
operations. Protect the work and provide for traffic as indicated in the contract documents.
502-3.14 Damaged or Defective Concrete. The Engineer will identify all areas of damaged and
defective concrete. Submit a repair plan for the damaged or defective concrete to the Engineer for approval. Repair or replace all damaged or defective concrete in accordance with the approved repair plan. Damage and defects include, but are not limited to, cracking, spalling, poor consolidation, out of specification materials, or imperfections caused by inadequate pavement protection, traffic, and/or construction practices. Slipformed concrete with inadequate plastic thickness as described in §502 -3.08, Plastic Thickness Determination, will be rejected in 150 foot segment lengths.
502-3.15 Hardened Surface Tolerance. After the concrete has hardened sufficiently, test each travel
lane, including ramps, with straight edges laid both longitudinally and transversely. Do not measure transverse deviations across longitudinal joints. The Engineer will mark longitudinal devi ations in the pavement surface exceeding 1/4 inch in 15 feet and transverse deviations exceeding 1/4 inch in 10 feet. Diamond grind these deviations in accordance with § 505-3.02, Bump Grinding, such that they do not exceed these parameters when retested.
502-3 16
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Shoulders and other areas not routinely exposed to traffic must meet 1/4 inch in 10 feet both longitudinally and transversely.
502-3.16 Opening to Traffic
502-3 Pavement Opening Requirements.
If these conditions are not met, test 3 additional cylinder pairs at a later time, provided the appropriate numbers of additional cylinders were cast. If the above conditions are not met after additional testing, or, if the required number of additional cy linders were not cast, open the pavement in accordance with the nonreduced time frames of §502 -3.16A, Construction Traffic, and §502 -3.16B, General Traffic.
502-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 D. HES Concrete. Open HES concrete pavements to construction traffic or general traffic based on the requirements of Table 502 -3 Pavement Opening Requirements, and if the joints have been addressed in accordance with §502 -3.12, Sealing or Filling Joints.
502-4 METHOD OF MEASUREMENT. The Engineer will measure the following quantities for items
incorporated into the finished pavement:
502-4.01 PCC Pavement, Unreinforced. The work will be measured for payment as the number of cubic
yards of unreinforced PCC pavement placed based on the payment lines shown in the contract documents, to the nearest cubic yard. Deductions will be made for catch basins, manholes, or other simi lar pavement obstructions requiring either mesh reinforced or heavily reinforced placements.
502-4.02 PCC Pavement, Mesh or Heavily Reinforced. The work will be measured for payment as the
number of cubic yards of reinforced concrete placed. No deductions will be made for drainage and utility structures or other similar pavement obstructions within the placement.
502-4.03 Transverse Joints. The work will be measured for payment as the number of feet of transverse
joints constructed that contain load transfer devices.
502-4.04 Longitudinal Joints. The work will be measured for payment as the number of feet of
longitudinal joints satisfactorily constructed that contain longitudinal joint ties.
502-4.05 Sealing Transverse Joints. The work will be measured for payment as the number of feet of
transverse joints sealed, excluding preformed sealers turned down at the pavement edges.
502-4.06 Sealing Longitudinal Joints. The work will be measured for payment as the number of feet of
longitudinal joints satisfactorily sealed.
502-5 Basis of Payment
502-5.01 This subsection is intentionally blank.
502-5.02 PCC Pavement, Unreinforced. Include the cost of all labor, material, and equipment necessary
to perform the work, including first -stage saw cuts, in the unit price bid for PCC Pavement, Unreinforced. No payment will be made for areas that do not meet minimum plastic thickness requir ements.
502-5.03 PCC Pavement, Mesh or Heavily Reinforced. Include the cost of all labor, material, and
equipment necessary to satisfactorily perform the work, including first -stage saw cuts, in the unit price bid for PCC Pavement, Mesh or Heavily Reinforced. No payment will be made for areas that do not meet minimum plastic thickness requirements.
502-5 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 502-5.04 Transverse Joints. Include the cost of all labor, material, and equipment necessary to perform the work in the unit price bid for Transverse Joints.
502-5.05 Longitudinal Joints. Include the cost of all labor, material, and equipment necessary to perform
the work in the unit price bid for Longitudinal Joints. Placing the inside shoulder and inside lane simultaneously, at the Contractor’s option, will not generate a Significant Cha nge in the Character of Work. No additional payment will be provided for the additional number of longitudinal joint ties associated with:
502-5.06 Sealing Transverse Joints. Include the cost of all labor, material, and equipment necessary to
perform the work in the unit price bid for Sealing Transverse Joints.
502-5.07 Sealing Longitudinal Joints. Include the cost of all labor, material, and equipment necessary to
perform the work in the unit price bid for Sealing Longitudinal Joints. Placing the inside shoulder and inside lane simultaneously, at the Contractor’s option, will not generate a Signifi cant Change in the Character of Work. Payment will be made under: Item No. Item Pay Unit 502.RCF L PCC Pavement Cubic Yard R – Pavement Reinf. C – Concrete Class F – Friction Type L–Load Transfer 0 – Unreinforced 1 – Class C 1 – Type 1 0 – Epoxy coated 1 – Mesh Reinforced 2 – Performance 2 – Type 2 2 – Heavily Reinforced 3 – HES 3 – Type 3 9 – Type 9 502.91 Transverse Joints Foot 502.9110 Longitudinal Joints Foot 502.9201 Sealing Transverse Joints – Preformed Elastic Joint Sealer Foot 502.9210 Sealing Transverse Joints – Highway Joint Sealant Foot 502.9301 Sealing Longitudinal Joints – Preformed Elastic Joint Sealer Foot 502.9310 Sealing Longitudinal Joints – Highway Joint Sealant Foot SECTION 503 - PORTLAND CEMENT CONCRETE FOUNDATION FOR PAVEMENT (Last Revised May, 2019)
503-1 DESCRIPTION. Construct a portland cement concrete (PCC) foundation for pavements and
shoulders, if required, as detailed in the contract documents.
503-2 Materials.
Apply the requirements of §502 -2 Materials.
503-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 503-3 CONSTRUCTION REQUIREMENTS. Apply the requirements of §502 -3 Construction Details except as modified herein.
503-3.01 Placement of Reinforcement. Place bar reinforcement around utilities, drainage structures, and
other projections into the pavement as depicted in the Standard Sheets for PCC Pavements. Use telescoping manholes when required by the contract documents in accordance with §502 -3.06C, Utility and Drainage Structure Isolation Joint Systems and Telescoping Manholes.
503-3.02 Joints. Transverse joint supports are not required for contraction joints. Saw cut skewed
contraction joints at a “6 on 1” skew across the pavement (approximately 10° from perpendicular to the centerline) before uncontrolled cracking occurs. Saw cut in accorda nce with the first -stage saw cut details in the Standard Sheets. Use a maximum joint spacing of 20 feet and a minimum spacing that satisfies the geometric requirements of §502 -3.06A, Transverse Joints. Center utilities and drainage structures between saw cuts. Skewed joints may be cut at the same angle across the pavement or chevron -shaped with the vertex at a longitudinal joint between separate placements. Maintain the same technique once selected. Construct transverse construction joints perpendicular to the centerline in accordance with §502 -3.06A3, Transverse Construction Joints. Construct longitudinal joints in accordance with §502 -3.06B, Longitudinal Joints.
503-3.03 Finishing. Hand finish the pavement to correct surface irregularities.
503-3.04 Testing the Surface. Immediately after placement, test the entire longitudinal center of each
travel lane with a 10 feet, minimum, long straight edge laid longitudinally. Immediately correct any surface irregularity exceeding 3/8 inches in 10 feet.
503-3.05 Texturing. Immediately after testing the surface, apply an aggressive transverse broom finish.
503-3.06 Curing. Cure in accordance with §502 -3.11 Curing, except the impervious membrane method,
i.e., curing compound, is not permitted.
503-3.07 Sealing Joints. Typically, no joint sealing is required in the PCC foundation course. Seal
skewed contraction joints in accordance with §502 -3.12A, Sealing Transverse Contraction Joints – Highway Joint Sealant, if a construction delay occurs that prevents the placement of the final pavement course until the subsequent construction season.
503-4 Method of Measurement.
503-4.01 Portland Cement Concrete Foundation for Pavement. The work will be measured for
payment as the number of cubic yards of Portland Cement Concrete Foundation for Pavement based on the payment lines shown in the contract documents. No deductions will be made for catch basins, manholes, or other similar pa vement obstructions.
503-4.02 Constructing Longitudinal Joints. The work will be measured for payment as the number of
feet of longitudinal joints constructed.
503-5 Basis of Payment.
503-5.01 Portland Cement Concrete Foundation for Pavement. Include the cost of all labor, material,
and equipment necessary to satisfactorily perform the work in the unit price bid for Portland Cement Concrete Foundation for Pavement. No payment will be made for areas that do not meet minimum plastic
503-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 thickness requirements as described in §502 -3.08, Plastic Thickness Determination. No additional payment will be made for Contractor -requested HES concrete mixes.
503-5.02 Constructing Longitudinal Joints. Include the cost of all labor, material, and equipment
necessary to perform the work in the unit price bid for Constructing Longitudinal Joints. Payment will be made under: Item No. Item Pay Unit 503.1010 PCC Foundation for Pavement, Class C Cubic Yard 503.1011 PCC Foundation for Pavement, Class F Cubic Yard 503.1012 PCC Foundation for Pavement, HES Concrete Cubic Yard 503.9110 Constructing Longitudinal Joints in Foundation Pavement Foot SECTION 504 VACANT SECTION 505 – DIAMOND GRINDING (New Section May, 2019)
505-1 DESCRIPTION. Diamond grind portland cement concrete (PCC) or asphalt surfaces in
accordance with the contract documents.
505-2 MATERIALS. Provide the Engineer with a list of equipment and their specifications at least 7
days before the planned start of diamond grinding. Maintain the equipment in proper working order. Immediately replace any out -of-round wheels. Do not use equipment that c auses raveling, aggregate fractures, or joint deterioration.
505-2.01 Production Diamond Grinding Equipment. For projects having grinding quantities over
3,000 yd2, use a self -propelled machine specifically designed for grinding that meets the following:
505-2.02 Bump Grinding Equipment. Use equipment meeting §505 -2.01 Production Diamond
Grinding Equipment, except the equipment must weigh at least 17,000 pounds. This equipment may only be used for grinding quantities of 3,000 square yards, or less.
505-3 Construction Details.
505-3.01 General. Provide at least one 10 -foot straightedge and one 15 -foot straightedge to the Engineer
before paving begins. Diamond grind longitudinally, beginning and ending at lines normal to the