606Guide Railing, Median Barrier, and Concrete Barrier

NY · 2026 (Jan) Standard Specifications✓ Full text on BuildSpecBook pages 691–715 Save this section

Ask about Section 606

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

SECTION 606 - GUIDE RAILING, MEDIAN BARRIER, AND CONCRETE BARRIER (Last Revised May 1, 2023)

606-1 DESCRIPTION. This work shall consist of the construction, reconstruction, removal, disposal,

storage, and resetting of highway barrier systems and component parts in accordance with the specifications, standard sheets, manufacturer’s drawings, manufacturer’s directions and contract documents to the lines and grades shown on the plans or established by the Engineer. The types of barrier systems are designated as follows: 3-Cable Guide Railing (TL-2) 4-Cable Mid-Tension Cable Guide Rail and Median Barrier Corrugated Beam Guide Railing and Median Barrier Heavy Post Blocked-Out (HPBO (Mod.)) Corrugated Beam Guide Railing and Median Barrier Box Beam Guide Railing and Median Barrier Concrete Barrier

606-1.01 I-Beam Posts for Existing Highway Barrier. Under this work the Contractor shall furnish and

install I-beam posts and necessary hardware for existing highway barriers in accordance with the plans, specifications, and as directed by the Engineer.

606-1 02

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

606-1.02 Guide Railing with Extra Long Posts. Under this work the Contractor shall furnish and install

guide railing of the type specified with extra long (7 foot) posts in accordance with the contract documents, and as directed by the Engineer.

606-1.03 Retensioning Existing Cable Guide Railing And Median Barrier. Under this work the

Contractor shall retension existing guide rail and median barrier cables in accordance with the Contract Documents.

606-2 MATERIALS. Materials shall meet the requirements specified in the following subsections of

Section 700-- Materials and Manufacturing and ASTM Specifications: Concrete Grouting Material 701-05 Anchoring Materials-Chemically Curing 701-07 Precast Concrete Barrier 704-05 Premolded Resilient Joint Filler 705-07 Joint Filler ASTM D1056 Wire Fabric For Concrete Reinforcement 709-02 Epoxy Coated Bar Reinforcement, Grade 60 709-04 Wood and Timber Posts and Timber Blockouts 710-13 Galvanized Steel Barrier Posts 710-14 Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) 710-17 HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) 710-18 HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy-Absorbing) 710-19 Corrugated Beam Guide Railing and Median Barrier 710-20 Box Beam Guide Railing and Median Barrier 710-21 Cable Guide Railing and Median Barrier. 710-22 Box Beam End Assembly Type III and Box Beam Median Barrier End Assembly, Type C 710-24 Plastic and Synthetic Block-Outs for Heavy Post Guiderail Systems 710-26 Anchor Bolts for Guide Railing 710-28 Galvanized Coatings And Repair Methods 719-01 Reflective Sheeting 730-05 (Materials Designation 730-05.02) Paint for Galvanized Surfaces 708-06 Rolled Steel Channels for Continuity Connections ASTM A36 Steel Plates for Continuity Connections ASTM A36

606-2.01 Steel Hardware. Steel posts, plates, channels, stiffeners, block-outs, angles, brackets, slipbases

and other miscellaneous steel hardware not referenced to or specified by §710-14, §710-20, §710-21, §710-22, §710-24 or other sections of this specification shall be fabricated as shown in the contract plans and documents from steel meeting the requirements of ASTM A36 unless specified otherwise. All components shall be galvanized in accordance with §719-01, Type I or II. Components shall be fabricated prior to galvanizing.

606-2.02 Anchor Bolts. For the purpose of the guide railing specifications, the term anchor bolt will be

used when referring to anchor rods, hooks, or studs.

606-2 03

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 Unless otherwise specified, anchor bolts embedded or grouted in concrete for securing post and railing base plates, or transitioning to concrete walls, parapets, and barriers shall meet the requirements of §710-28. Anchor bolts embedded in concrete anchorage units for terminating guide rail and median barrier systems shall have minimum yield and tensile strength meeting the requirements of ASTM F1554 Grade 36. Anchor bolts, nuts, and washers shall be galvanized in accordance with §719-01, Galvanized Coatings and Repair Methods, Type II, unless indicated otherwise on the plans or Standard Sheets. Grout for anchor bolts shall conform to the requirements of §701-07 or §701-05.

606-2.03 Fasteners. Bolts, nuts and washers shall conform to the following, unless specified otherwise

on the plans, standard sheets, manufacturer’s drawings’, or in the contract documents. Bolts Bolts ASTM A307 Grade A Nuts ASTM A563 Grade A or Better Washers ASTM F436 Bolts, nuts and washers shall be galvanized in accordance with the provisions of §719-01 Galvanized Coatings and Repair Methods, Type II.

606-2.04 I-Beam Posts for Existing Highway Barrier. I-beam posts for existing highway barrier

shall conform to the requirements of §710-14 Galvanized Steel Barrier Posts. Posts shall conform to the details shown on the plans or the latest edition of the standard sheet for the guide railing or median barrier affected. Hardware (nuts, bolts, “J” bolts, offset beams or block-outs, back up plates, washers, and shelf angles) necessary shall conform to the requirements of the current specifications and standard sheets for the highway barrier affected.

606-2.05 Extra Long Guide Rail Posts. Extra long Guide Rail Posts shall conform to the requirements

of §710-14 Galvanized Steel Barrier Posts. The posts shall conform to the details for extra long posts shown on the standard sheets or plans.

606-2.06 Concrete for End Assembly Anchorage Units. Cast-in-place concrete shall be Performance

Engineered Mixture (PEM) Portland Cement Concrete that meets the appropriate mix design requirements specified in Table 2 of Materials Procedure (MP) 501-2 Mix Design and Approval Procedure for Performance Engineered Mixtures – Structural Concrete. Precast concrete anchorage units, when selected as an alternate to cast-in-place units by the Contractor, shall meet the requirements of Section 704-03 Precast Concrete-General.

606-2.07 Concrete Barrier

A.Precast Concrete Barrier. The requirements of §704-05 shall apply
B.Cast-in-Place Concrete Barrier. Concrete shall be Performance Engineered Mixture (PEM) Portland Cement Concrete that meets the appropriate mix design requirements specified in Table 2 of MP 501-2.Reinforcement shall meet the material requirements §606-2 and be of the type and sizes as indicated on the standard sheets and plans.
C.Machine Formed Concrete Barrier. The concrete shall be Performance Engineered Mixture (PEM) Portland Cement Concrete that meets the appropriate mix design requirements specified in Table 2 of MP 501-2. Reinforcement shall meet the material requirements of §606-2 and shall be of the type and sizes as indicated on the standard sheets and plans.

606-2 08

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

606-2.08 Resetting Guide Railing, Median Barrier, Anchorage Unit Assemblies and End

Assemblies. The materials comprising the existing system shall be used if they conform to the materials requirements specified for new guide rail systems and are found to be in satisfactory condition as determined by the Engineer. The Contractor shall supply all new hardware (splice tongues, plates, nuts, bolts, washer, etc.) Replacement materials shall meet the material requirements specified for new guide rail systems. Galvanizing of railing and posts may be repaired in accordance with §719-01, Galvanized Coatings and Repair Methods. HPBO guide railing and median barrier (pre-2013 design) shall be reset as detailed in the current standard sheets, including 12 inch block-outs.

606-2.09 HPBO (Mod.) Corrugated Beam Guide Railing and Median Barrier. The material

requirements of §710-20 Corrugated Beam Guide Railing and Median Barrier shall apply except that posts, block-outs, soil plates, anchor bolts, hardware, and fasteners shall be as detailed on the Standard Sheets. The Wood and Timber Posts and Timber Block-Outs shall conform to §710-13. The Plastic and Synthetic Block-Outs for Heavy Post Guiderail Systems shall conform to §710-26.

606-2.10 Corrugated Beam Guide Rail Transition To Bridge Rail, Concrete Barrier and

Concrete Parapets. Corrugated beam rail sections shall conform to the requirements of §710-20 and as detailed on the Standard Sheets or Bridge Detail Sheets. Thrie beam shall conform to the material specifications of 710-20 and shall be as detailed on the Standard Sheets.. All remaining material shall conform to the requirements of §710-23 except that:

A.Steel tubular block-outs and stiffening channels, where specified, shall conform to ASTM A36.
B.All components shall be galvanized in accordance with §719-01 Galvanized Coating and Repair Methods, Type I or Type II. If required by the plans, the components shall be painted to match the existing railing. Painting shall be done in accordance with Section 657 except that:
1.Painting with rollers will not be permitted.
2.Spray painting will be allowed only if the components are painted at a location, away from the worksite, acceptable to the Engineer.
C.Shop drawings will not be required. Approval of the system will be made by the Engineer.

606-2.11 Vacant.

606-2.12 Vacant

606-2.13 (Vacant)

606-2.14 Transitions Constructed of, or with, Concrete. Concrete transition between concrete

barriers of different shapes and the concrete elements of transitions between metal barriers and concrete barriers shall conform to §606-2.07 Concrete Barrier, A. Precast Concrete Barrier or, with the permission of the Engineer, B. Cast-in-Place Concrete Barrier.

606-3 Construction Details

606-3.01 General. All barrier systems and transitions described by these specifications shall be subject

to the following requirements.

606-3 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

A.Inspection of Rail Elements. Immediately prior to erection, the rail elements shall be inspected for damage. Bends or kinks in the railing, not specifically required by the contract documents, shall constitute sufficient cause for rejection. Straightening of such bends or kinks will not be allowed. Erection of all guide rail, median barrier, transitions and connections shall be subject to the inspection of the Engineer who shall be given all facilities required for a visual inspection of workmanship and materials.
B.Field Galvanizing For Repair. Field galvanizing repair shall be allowed only when the total damaged area on each piece or component is less than 2 percent of the coated surface, or 16 square inches, whichever is less. Any single piece or component with total damaged area greater than the amount specified above shall be rejected and replaced by the Contractor. Field galvanizing repair shall be done in accordance with the requirements of the Repair section of §719-01 Galvanized Coating And Repair Methods.
C.Field Welding. Field welding shall not be permitted unless noted in the contract documents. When specified, welding shall comply with the requirements of the SCM.
D.Erection. Posts, railing, barrier systems, rail transitions, end assemblies, and anchorage units shall be erected as specified in the contract plans or manufacturer’s drawings. Where drilling and grouting is required, Section 586 – Miscellaneous Structural Reconstruction shall apply, unless otherwise approved. Rail mounting height shall be within +/- 1/4 inch of that indicated on the Standard Sheets and plans. Prior to installing guide rail, median barrier, transitions, or end terminals, the Contractor shall determine the locations of all structures, including underground structures, that may be affected by the installation. If there are conflicts between the proposed installation and other structures, the Contractor shall discuss with and recommend to the Engineer alternative locations or types of barrier, transitions, or end terminals that will not be in conflict with the structure. Posts and foundation tube(s) shall be driven unless otherwise specified by the Engineer. The driving shall be accomplished with approved equipment and methods that will leave the posts and foundation tube(s) in their final position, free of any distortion, burring or other damage. When posts and foundation tube(s) are driven through asphalt concrete or a bituminous treated material, the Contractor shall take care to prevent damage to the paved or treated areas. Large holes and voids caused by driving the posts and foundation tube(s) shall be filled and compacted with a bituminous treated material or asphalt concrete similar to that damaged. The small area adjacent to the post and foundation tube(s) disturbed during installation or where gaps exist at the post and foundation tube(s) after pavement repairs shall be sealed with a bituminous material approved by the Engineer. As an alternate to driving posts and foundation tube(s) on unpaved medians and where site conditions are such that driving is not possible, the Contractor shall carefully excavate for all post and foundation tube(s) holes. Post and foundation tube(s) holes and post and foundation tube(s) foundation structures shall be backfilled and backfilled material compacted in accordance with Section 203, Select Granular Fill . On structures, concrete anchors, and paved medians, base plates for posts shall be anchored as shown in the Contract Documents. Alternate construction methods and equipment for drilling and grouting of holes shall be submitted to the Engineer for approval before operations begin. The work of installing the guide railing system when it abuts stabilized shoulder courses shall be coordinated and progressed to provide the least disturbance between the two phases of the work. All posts shall be aligned to a tolerance of 1/4 inch for plumb and grade line. Box beam to be installed on a curved alignment shall be shop bent or shop curved in accordance with Table 606-1. TABLE 606-1 SHOP BENDING AND SHOP MITERING OF BOX BEAM GUIDE

606-3 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 RAILING AND MEDIAN BARRIER Barrier Type Shop Bending Required Shop Mitering Required Box Beam Guide Railing Radius over 20 ft and less than 720 ft Radius of 20 ft or less Box Beam Median Barrier Radius over 30 ft and less than 1525 ft Radius of 30 ft or less When shop bending or shop mitering of box beam guide railing or box beam median barrier is required, the rail element shall be shop-worked to the radius that the barrier will be installed on. Corrugated beam guide railing and median barrier shall require shop curving if the radius is equal to or less than 150 feet. When shop curving of corrugated beam is required, the rail element shall be shop-worked to the radius that the barrier will be installed on.

E.Concrete Anchorage Units. Concrete anchors shall be constructed as detailed on the standard sheets. Excavation shall meet the requirements of §206-3 of the Standard Specifications. The bottom of the anchor shall have a full and even bearing on the surface under it. After the concrete anchor is in place, the excavation shall be backfilled in accordance with Section 203, Select Granular Fill .
F.End Terminals and Assemblies. Installation of all proprietary products shall follow the manufacturer’s instructions. The following shall apply to end terminals or assemblies to be installed under this section.
1.Drawings. For end terminals and end assemblies not shown on standard sheets or detailed in the plans, the Contractor shall submit two copies of the manufacturer’s drawings, modified as necessary to reflect site conditions, to the Engineer for approval prior to ordering any materials required under this section. Drawings of parts not detailed on the plans, but which are necessary to develop the full performance of the end assemblies or terminals shall also be provided. The Contractor shall commence work of installation of end assemblies or terminals only after approval of the above mentioned drawings and authorization from the Engineer to do so.
2.Manuals. In addition to the drawings mentioned above, the Contractor shall deliver to the Engineer two (2) copies of design manuals, installation manuals, parts lists, and maintenance manuals prepared for each type end terminal or assembly being installed but not shown on the standard sheet.
3.Coordination with Other Work. The work of furnishing and installing all types of end assemblies shall be coordinated with the removal of existing impact attenuators or end assemblies, the installation of guide railing or median barrier, or the installation of the object to be shielded, so as to minimize the time that motorists are exposed to the possibility of collision with the shielded object, unprotected ends of barriers, or incomplete end terminals or assemblies. Also, the contractor shall minimize exposure of approaching vehicular traffic to the possibility of impact on the back of the end assembly. Unless modified in the Contract Documents, minimization shall mean seven (7) or fewer calendar days.
4.Traffic Protection. Traffic protection shall be provided as specified in Section 619 Work Zone Traffic Control.
5.Reflective Sheeting. End terminals and assemblies which have a vertical face towards approaching traffic and are located on or closely adjacent to the shoulder shall be provided with reflective sheeting in accordance with Section 2C.65 of the MUTCD. The yellow and black stripe widths shall be 4 inches.

606-3 02

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

606-3.02 Cable Guide Railing and Median Barrier. Beginning with the first post where the rail is

parallel to the edge of pavement, every sixth post in the line of guide rail shall be reflectorized (96 foot spacing for reflectors) except those posts in the approach terminal and intermediate anchorage area, which curve away from the shoulder, or used in a median barrier. The reflector and method of attachment shall be as indicated on the standard sheet.

A.Anchorage Unit Assemblies. After the posts are driven to the specified line and grade, anchor angles and anchor posts shall be adjusted in the field to provide a full and even bearing on the underlying surface.
B.Cable Tensioning. . The Contractor shall install and tension each cable of guide railing and median barrier to the tensions specified for the temperature range prevailing at the time.: For installations requiring spring compensators, properly seat the spring compensation device and then permanently mark the unloaded position. Complete the assembly of the guide railing and set the compensating devices to a spring compression of 3 1/2 inches. Leave the springs at this setting for at least 2 weeks, then set them to the proper setting according to temperature from the data in the table on the standard sheets. For mid-tension cable guide rail, install a turnbuckle on one end of the cable, pull the cable to remove slack, and place a second turnbuckle on the other end. Once the assembly of the run is complete, tension each cable according to temperature from the data in the table on the standard sheets. Measure the tension using a three-point cable tension meter. For high-tension cable systems, follow the manufacturer’s directions.
C.Cable Splicing. The Contractor shall install cable splices in the following manner: Place a splice end over the cable. Twist the cable to separate the three strands. Insert the wedge into the center of the strands, leaving at least one inch of excess cable, and pull the cable back until the wedge is snug to the splice. Pound the wedge into the splice. Crimp at least one wire of the cable over the wedge. Repeat the procedure for the other cable. Connect the two splice ends together.

606-3.03 Box Beam Guide Railing and Median Barrier. Rail sections for tangent runs shall be at least

18 feet long. Rail splices shall be a minimum of 18 inches from the centerline of any post which is to be bolted to the rail.

606-3.04 Weak Post and HPBO (Mod.) Corrugated Beam Guide Railing and Median Barrier In the

erection procedures, the free end of the rail element shall not be allowed to swing free and cantilever around the mounting bolt. The free end shall be supported in a manner approved by the Engineer while the splice bolts and mounting bolts are fastened. Rail splicing shall be as shown on the Standard Sheets.

A.Weak Post Corrugated Beam Guide Railing and Median Barrier. The rail elements shall be installed so the weight of the beam rests on the double nutted support bolt before the 5/16 inch mounting bolts are torqued. Before the final torquing, six of the 5/16 inch mounting bolts in the installation shall be selected at random and with a suitable torque wrench tightened to failure. The six readings shall be averaged, the six failed bolts replaced and all the mounting bolts in the installation torqued to 50% of the average value. Support bolts shall be installed on all the guide rail posts except the three posts adjacent to the anchors.
B.HPBO (Mod.) Corrugated Beam Guide Railing and Median Barrier. HPBO (Mod.) guide railing shall be erected from the approach-end anchorage unit and downstream along the flow of traffic.

606-3 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 HPBO (Mod.) median barrier shall be erected from one of the anchorage sections and shall be completed as the work progresses. HPBO (Mod.) guide railing and median barrier connections to walls or Concrete Barriers shall be as specified on the plans or the Standard Sheets. During non-working hours, no uncompleted anchorage units or heavy posts without rail will bepermitted to be exposed to traffic on either guide railing or median barrier.

606-3.05 Concrete Barrier. Unless specified otherwise in the contract documents the Contractor shall

have the option of providing precast concrete barrier, cast-in-place concrete barrier, or machine formed barrier. No intermixing in any run of barrier will be permitted unless shown otherwise in the contract documents except that precast transition sections and ends may be used with cast-in-place or machine formed concrete barriers. Unless otherwise specified, excavation shall be performed in accordance with §206-3. Granular back fill shall conform to Section 304 and shall match the subbase course type used on the adjacent roadway. Half section concrete barrier shall be erected with the appropriate back-up posts and continuity plates as shown on the Standard Sheets and plans.

A.Precast Concrete Barrier
1.Placement. Immediately prior to installation, the Engineer shall inspect the sections for manufacturing defects or shipment damage. Damaged or defective sections shall be rejected or repaired in accordance with §704-05. Precast Concrete Barrier, Repair. The sections shall be placed in accordance with the contract plans and proposals.
2.Vertical Expansion Joint. Sections shall be separated by 1/2 inch nominal joint openings. The joint opening, at any point in the plane of the joint, shall not vary by more than 1/4 inch. Premolded Resilient Joint Filler conforming to the requirements of §705-07 or Joint Filler conforming to the requirements of ASTM D1056 class 2B1 or 2B2 shall be placed in the joint as shown on the plans, standard sheet or as directed by the Engineer.
3.Dimensional Tolerance.
a.Cross-sectional dimensions shall not vary from the dimensions shown by more than 1/4 inch.
b.The barrier shall not be out of plumb by more than 1/4 inch.
c.Longitudinal dimensions shall not vary from the dimensions shown by more than 1/4 inch per 10 foot of the barrier.
d.When checked with a 10 foot straight edge, irregularities shall not exceed 1/4 inch.
4.Placement Adjacent to Cement Concrete. The barrier shall be separated from cement concrete pavement or shoulders by a ½” thick (± ⅛”) premolded resilient joint filler meeting §705-07. The joint filler shall cover the entire pavement/shoulder face. A joint sealant reservoir ¼” - ½” deep shall be formed or routed in the joint filler. The Contractor shall abrasive blast the barrier and pavement/shoulder in the reservoir, and seal the joint using material meeting §705-02, Highway Joint Sealant, Type IV. Sealing shall be done in accordance with the manufacturer’s instructions, a copy of which shall be provided to the Engineer prior to commencement of work.

606-3 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

B.Cast-in-Place Concrete Barrier
1.Placing. Cast-in-place concrete barriers and footings shall not extend more than 200 feet without an expansion joint. The Contractor shall have the option of placing the cast-in-place concrete barrier with a monolithic cross-section or with a horizontal construction joint at the top of the footing. When the Contractor elects to cast a separate footing, the horizontal joint details must conform to those on the Standard Sheets or in the plans, or the Contractor must prepare joint details and submit them to the Regional Director for approval.
2.Joints
a.Contraction Joints. Cast-in-place concrete barrier shall have contraction joints every 20 feet in both the footing and the stem. When cast separately, the joints in the stem shall line up with the joints in the footing. Contraction joints shall be formed in or saw cut normal to the pavement. The joints shall conform to the dimensions as shown on the plans or Standard Sheets. If the joints are saw cut, they shall be saw cut as soon as no damage to the concrete will result, with a maximum time of 2 hours after the forms are removed to avoid early formation of uncontrolled shrinkage cracks. Clear curing compound shall be promptly applied to the saw cut.
b.Expansion Joints. Expansion joints shall be formed normal to the pavement with Premolded Resilient Joint Filler meeting the requirements of §705-07 and shall provide for expansion of ½ inch. The filler material shall be cut to fully cover and conform to the cross section of the barrier, or to the footer and stem separately if they are cast separately. In addition to the maximum separation of 200 feet, expansion joints shall be located at all immovable objects (bridge substructures, etc.), where shown on the plans, and/or as directed by the Engineer.
c.Construction Joints. When the Contractor’s operations require the use of a construction joint, one of the two following procedures may be used. However, if operations will not resume within 24 hours, only method A may be used.
1.Method A. Construct an expansion joint as detailed in the preceding section.
2.Method B. After initial set has taken place, remove the end form to expose the concrete. Roughen the surface to achieve a good interlock and increased bond area when the concrete operations are resumed. A one-inch strip around the periphery of the end surface should remain undisturbed to serve as a neat, linear contraction joint. The end surface shall be covered with several layers of wetted burlap to prevent drying. All reinforcing steel shall extend beyond the face to provide adequate lapping.
3.Forms. Forms shall be metal and of such construction that there will be minimum interference to inspection for grade and alignment. Forms shall be braced and secured adequately so that no discernible displacement from alignment or grade will occur during placement of concrete.
4.Concrete Placing and Vibrating. Concrete shall be placed in the barrier forms in accordance with the requirements of §555-3.04 Handling and Placing Concrete. Concrete shall be compacted by means of immersion type mechanical vibrators approved by the Engineer. The vibrator shall be inserted into the concrete at one foot intervals. The vibrators shall be of size and weight sufficient to thoroughly vibrate the entire concrete mass without damaging or misaligning the forms or reinforcement.

606-3 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

5.Removal of Forms and Finishing Surfaces. Forms shall be left in place for 24 hours or until, in the judgment of the Engineer, the concrete has sufficiently set so that the forms may be removed without injury to the barrier. Immediately after the forms have been removed, surfaces exposed to view shall have all projections and irregularities carefully removed and all cavities neatly filled with mortar of the proportion used in the concrete. The same brand of cement and the same kind of fine aggregate shall be used for filling cavities as was used in the original concrete mix. Surfaces repaired by plastering will not be allowed.
6.Curing. The median barrier shall be cured using a clear curing compound meeting the requirements of §711-05. The compound shall be sprayed on the concrete surfaces at a min. rate of 1 gal/ 150 sf immediately following form removal.
7.Reinforcement. The Contractor shall incorporate reinforcement as indicated on the standard sheets and plans. All reinforcing steel shall be epoxy coated meeting the requirements of §709-04.
8.Placement Adjacent to Cement Concrete Pavement or Shoulders. The barrier shall be separated from the cement concrete pavement or shoulder by a 1/2 inch wide vertical joint extending down to the bottom of the pavement or shoulder. The joint shall be formed with and contain Premolded Resilient Joint Filler conforming to the requirements of §705-07. A recess of approximately one inch shall be provided at the top of the joint for installation of a backer rod and joint sealant. The joint sealant shall be a silicone sealant appearing on the Department’s Approved List and shall be applied in accordance with the manufacturer’s instructions.
9.Dimensional Tolerance
a.Cross-sectional dimensions shall not vary from the dimensions shown by more than 1/4 inch.
b.The barrier shall not be out of plumb by more than 1/4 inch.
c.Longitudinal dimensions shall not vary from the dimensions shown by more than 1/4 inch per 10 foot of the barrier.
d.When checked with a 10 foot straight edge, irregularities shall not exceed 1/4 inch.
C.Machine Formed Concrete Barrier
1.Weather Limitations. The requirements of §502-3.01 shall apply.
2.Equipment. The slipforming equipment shall be self-propelled and shall be capable of placing, consolidating and finishing concrete to the proper line and grade. The Engineer may require the Contractor to demonstrate that the specific equipment proposed for use is capable of satisfactorily placing the concrete mix. The Contractor shall furnish the manufacturer's data regarding machine operation to the Engineer.
3.Preparation of the Subbase Course. Before any concrete may be placed, the subbase course shall be compacted and fine graded to a tolerance of 1/2 inch of the true grade at any location under the barrier. Whenever possible, as determined by the Engineer, concrete placing operations shall not begin until the subbase course has been fine graded ahead at least 1000 feet.

606-3 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

4.Reinforcement. The Contractor shall incorporate reinforcement as indicated on the standard sheets and plans. All reinforcing steel shall be epoxy coated meeting the requirements of §709-04.
5.Placing Operations
a.Central and Transit Mixed Concrete. The provisions of §501-3.034 AC and BD shall apply for Central Mixed and Transit Mixed Concrete respectively, except that water may be added at the point of deposition to maintain the desired slump. The water addition may be made at any time after the beginning of the discharge until approximately two-thirds (2/3) of the load, as determined by the Engineer, has been discharged. After the water addition the concrete shall be mixed at least 30 revolutions in the mixing range. When the water additions made after discharge the total number of revolutions shall not be more than 190.
b.Truck Mixed Concrete. The provisions of §501-3.034 CE shall apply except that after the initial slump has been achieved, water may be added to the mixture one additional time to maintain the desired slump. The water addition may be made anytime after the beginning of discharge until approximately two-thirds (2/3) of the load, as determined by the Engineer, has been discharged. After the water addition, the concrete shall be mixed at least 30 revolutions in the mixing range. The slipforming equipment shall have as nearly a continuous forward movement as possible to provide uniform progress with stopping and starting of the equipment held to a minimum. Any edge slump resulting from slipforming operations in excess of 1/4 inch, as measured from the top surface of the median barrier, exclusive of edge rounding, shall be corrected before the concrete has hardened. Concrete supply shall be sufficient to produce a continuous, completely shaped barrier. If concrete placement is interrupted for a period of time where the delay will affect the quality and structural integrity of the barrier, the contractor shall terminate his operations by one of the following procedures. The Engineer shall determine when the slipform operation is to be terminated. Method A. Construct a cast in place expansion joint system as detailed on the standard sheets. Method B. Remove existing unset concrete to a vertical score line with hand tools. The vertical surface resulting from the removed concrete shall remain reasonably rough and unfinished to facilitate interlock and increased bond area when concrete operations are to be resumed. The vertical surface shall be touched up with hand tools, as directed by the Engineer, to correct unacceptable voids, tears and lack of consolidation resulting from the concrete removal. The surface shall be covered with several layers of wet burlap to prevent drying. All reinforcing steel shall extend beyond the face to provide adequate lapping. Concreting operations may resume at the terminated face when the terminated portion has achieved enough rigidity to withstand the sequence of operations it will be subjected to without sustaining damage. All loose or unacceptable concrete and material shall be removed from the terminated face as directed by the Engineer. Concrete barrier damaged as a result of the contractor's operations shall be repaired to the satisfaction of the Engineer. Termination of slipform operations at the end of the day for an uncompleted run shall be by method A or B above.

606-3 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

6.Curing. The median barrier shall be cured using a clear curing compound meeting the requirements of §711-05. The compound shall be sprayed on the concrete surface immediately following the placing operation at a min. rate of 1 gal/ 150 sf.
7.Placement Adjacent to Cement Concrete Pavement or Shoulders. The barrier shall be separated from the cement concrete pavement or shoulder by a 1/2 inch wide vertical joint extending down to the bottom of the pavement or shoulder. The joint shall be formed with and contain Premolded Resilient Joint Filler conforming to the requirements of §705-07. A recess of approximately one inch shall be provided at the top of the joint for installation of a backer rod and joint sealant. The joint sealant shall be a silicone sealant appearing on the Department's Approved List and shall be applied in accordance with the manufacturer's instructions.
8.Contraction Joints. Contraction joints shall be formed or saw cut normal to the pavement. The spacing shall be every 20 feet, as shown on the plans or as ordered by the Engineer. The joints shall conform to the dimensions as shown on the plans or standard sheets. If the joints are saw cut, they shall be saw cut as soon as no damage to the concrete will result, with a maximum time of 8 hours. The clear curing compound shall be reapplied at the saw cut.
9.Expansion Joints. Machine formed concrete barriers shall not extend more than 400 feet without an expansion joint. Expansion joints shall be formed normal to the pavement with Premolded Resilient Joint Filler meeting the requirements of §705-07 and shall provide for expansion of 1/2 inch. The filler material shall be cut to conform to the cross section of the barrier. The expansion joints shall be located at all immovable objects (bridge substructures, etc.), where shown on the plans, and/or as directed by the Engineer. Expansion joints shall not be required at regular intervals unless shown on the plans.
10.Tolerances. All concrete barrier produced by this method shall conform to the following tolerances:
a.Placing Tolerances
1.Bar Reinforcement Cover 0 to + 1/2 inch.
2.Width (top) 0 to + 1/4 inch.
3.Width (base) 0 to + 1/2 inch.
b.Dimensional Tolerance
1.Cross-sectional dimensions shall not vary from the dimensions shown by more than 1/4 inch.
2.The barrier shall not be out of plumb by more than 1/4 inch.
3.Longitudinal dimensions shall not vary from the dimensions shown by more than 1/4 inch per 10 foot of the barrier.
4.When checked with a 10 foot straight edge, irregularities shall not exceed 1/4 inch.

606-3 06

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

11.Defects. Defects are divided into two categories Minor defects and major defects. Minor defects in the barrier may be repaired in the field. Major defects shall be cause for rejection of the section, or the section shall be repaired in the manner directed by the Engineer.
a.Minor Defects. Minor defects are defined as holes, honeycombing or spalls which are 6 inches or less, in diameter, and which do not expose the outermost surface of the steel reinforcement. Surface voids 5/8 inch, or less, in diameter and 1/4 inch, or less, in depth are not considered defects and they do not require repair.
b.Major Defects. Major defects are defined as:
1.Any defect which does not meet the definition of a minor defect.
2.Minor defects which, in aggregate, comprise more than five percent (5%) of the surface area of the barrier section.
12.Repair. Repair of hardened concrete shall be as follows:
a.Minor Defect Repair. Repair shall be made with a material meeting the requirements of §701-04 or §701-12. Methods of repair shall be acceptable to the Engineer. The color of the repaired portion shall match as nearly as practicable, the color of the surrounding concrete. Repaired portions shall exactly match shape requirements. The repaired portion shall withstand a moderate blow from a 16 ounce hammer.
b.Major Defect Repair. Major defect repair shall be preapproved by the Engineer.
13.Hand Finishing. The Contractor shall make provisions to allow hand finishing, when directed by the Engineer, on all surfaces. Hand finishing, if done shall be done immediately after the passage of the slipforming equipment. Curing compound shall be applied only after hand finishing has been completed at any particular location.
14.Transitions and Tapered End Sections. Transitions and tapered end sections shall be either cast-in-place or precast, at the Contractor’s option.”

606-3.06 Resetting Guide Railing, Median Barrier and Precast Concrete Barrier. The Contractor

shall remove, store, clean and reset railing, posts, and precast concrete barrier as shown on the plans or as directed by the Engineer. The Contractor shall remove designated existing guide railing, median barrier and precast concrete barrier and neatly store them at locations approved by the Engineer. The work shall be done in a workmanlike manner so as to salvage all usable parts. The reset guide railing and/or median barrier shall be placed in accordance with the requirements of §606-3.01 General and the subsection for each specific system. Unless otherwise specified by the designer, all existing hardware, i.e., post bolts, J- bolts, splice bolts, etc., shall be replaced with new hardware. Cable systems shall be retensioned and all existing splice couplings and wedges shall be replaced. HPBO guide railing and median barrier (pre-2013 design) shall be reset as detailed in the current standard sheets, including 12 inch block-outs. The existing block-outs shall become the property of the Contractor.

606-3.07 Resetting Guide Railing and Median Barrier (New Posts). The construction details of §606-

3.06 shall apply, except that the Contractor shall furnish and install new posts and remove the old posts from the site.

606-3.08 Removing and Storing Guide Railing, Median Barrier, and Precast Concrete Barrier. The

Contractor shall remove designated existing guide railing, median barrier and precast concrete barrier and neatly store the component parts in separate piles at locations designated for future pick up by Department

606-3 09

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 forces, or its designee. The work shall be done in a workmanlike manner so as to salvage all usable parts. Unusable material shall be disposed of by the Contractor.

606-3.09 Removing and Disposing of Guide Railing, Median Barrier, Concrete Barrier, Guide

Posts, Guide Rail Posts, and Median Barrier Posts. The Contractor shall remove designated existing guide railing, median barrier, concrete barrier, guide posts, guide rail posts, and median barrier posts and remove them from the site of work. Holes shall be backfilled with a suitable material and compacted in a manner approved by the Engineer.

606-3.10 Posts for Existing Highway Barrier. Posts for existing highway barrier shall be installed at

the locations indicated in the contract documents or where directed by the Engineer. The driving shall be in accordance with the requirements of §606-3.01 and the applicable standard sheet(s). All hardware necessary for mounting the rail elements or cable to the post shall be supplied by the Contractor. New heavy post block-outs shall be supplied to replace damaged or unusable block-outs. S3x5.7 posts installed as intermediate posts to reduce post spacing on weak post corrugated beam guide railing and median barrier shall not be attached to the rail element. Intermediate posts installed on box beam guide railing shall not be attached to the box beam unless indicated otherwise on the Standard Sheets or project plans. All reflectors, delineators, reference markers, or other items, which are to remain in place, that are damaged by or during the Contractor's operations shall be replaced by the Contractor unless indicated otherwise on the Standard Sheets or project plans.

606-3.11 Retensioning Existing Cable Guide Railing and Median Barrier. Cable guide rail and

median barrier shall be retensioned in accordance with the cable tensioning requirements of §606-3.02.

606-3.12 Resetting Anchorage Unit Assemblies and End Assemblies for Guide Rail and Median

Barrier. The Contractor shall remove, store, clean and reset existing anchorage units and terminals for Guide Railing and Median Barrier as shown on the plans or as directed by the Engineer. The anchorage units and terminals shall be reset and placed in accordance with the requirements of §606-3.01 General. Any anchor blocks that will not remain in use in their existing location are to be removed and the holes backfilled as detailed in §606-3.13 The Contractor shall take care so reusable parts are not damaged by their operations. Any parts damaged in handling and placing shall be replaced by the Contractor. Unusable material shall be disposed of by the Contractor. Surface areas disturbed during the removal operations shall be reestablished, as nearly as possible, to match the adjacent surfaces to remain.

606-3.13 Removing and Storing Anchorage Unit Assemblies and End Assemblies for Guide Railing

and Median Barriers The construction details of §606-3.08 shall apply. However, concrete anchor blocks shall be completely removed, and the resulting holes backfilled. If the center of the anchor block is inboard from a line six feet beyond the theoretical shoulder break, the Contractor shall backfill with material meeting the requirements of §733-04 compacted in 6-inch lifts. If the center of the anchor block is more than six feet past the shoulder break, the backfill material and compaction shall be replaced in kind, character and condition, compacted in 6-inch lifts. Other excavation and backfill shall conform to the requirements outlined in §606-3.01E. Roadway edge drains damaged due to the Contractor’s operations shall be repaired or replaced at no additional cost to the State.

606-3.14 Removing and Disposing Anchorage Unit Assemblies and End Assemblies for Guide

Railing and Median Barriers. The construction details of §606-3.13 shall apply except the anchor blocks and terminals become the property of the Contractor and shall be removed from the project.

606-3 15

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

606-3.15 Box Beam Guide Rail Transition to Concrete Barrier. The contractor shall construct a guide

rail transition from concrete barrier to box beam guide rail at the locations indicated and as detailed on the contract plans. The work shall conform to the requirements of §606-3.01.

606-3.16 Corrugated Beam Guide Rail Transition to Bridge Rail, Concrete Barrier and Concrete

Parapets. The contractor shall construct corrugated beam guide transitions to bridge rail, concrete barrier and/or concrete parapets at the locations and as detailed on the contract plans. The requirements of §606- 3.01 shall apply together with the following: Railing shall be erected so that the rails are parallel to the roadway, except in those sections where it is necessary to vertically transition the highway barrier to the bridge railing, or barrier. Bending or curving of rail elements in order to fit alignment requirements in the field shall not be permitted. The Engineer may order some bending or curving to allow for necessary minor adjustments. The Contractor shall exercise care in attaching the guide rail to the bridge rail so as not to damage the rails, posts, or joints, or splices. Any damage to the material attributable to the Contractor's operation shall require that the material be repaired, or replaced. The decision to repair, or replace, shall rest solely with the Engineer.

606-3.17 Vacant.

606-3.18 Vacant

606-3.19 Transitions Constructed of, or with, Concrete. Transitions constructed of concrete and the

concrete elements of transitions constructed of metal components and concrete elements shall be constructed at the locations indicated in the contract documents, or those indicated by the Engineer, in accordance with these specifications, the contract documents, and the directions of the Engineer. The shapes indicated on the Standard Sheets are standard. The Deputy Chief Engineer (Design) will consider other shapes for approval. §606-3.05 Concrete Barrier, A. Precast Concrete Barrier and B. Cast-in-Place Concrete Barrier shall apply.

606-4 Method of Measurement

606-4.01 Cable, Corrugated Beam or Box Beam Guide Railing and Median Barrier. The quantity to

be measured for payment will be in feet to the nearest foot of guide railing or median barrier installed, measured along the axis of the railing and between its pay limits as shown on the plans and/or standard sheets. The quantity to be measured for payment will be in feet to the nearest foot of shop bent or shop mitered guide railing or median barrier installed. If the guide railing does not terminate at an anchorage unit, end assembly, or transition to another type of barrier, but is anchored to a structure, the railing will be measured up to the structure. When installing new or replacement runs containing stretches with or consisting entirely of reduced post spacings, the following payment factors shall be applied to the prices bid per foot for the normally spaced guide rail. TABLE 606-2 PAYMENT FACTORS FOR GUIDE RAIL AND MEDIAN BARRIER POST SPACING Payment Factors >> 1.0 1.1 1.3 1.4 1.6 1.8 1.9 Rail Types ↓↓ Post Spacing Center to Center in Feet & Inches 3-Cable 16’ 12’ -- 8’ -- -- 4’ Mid-Tension Cable 10’ -- -- 5’ -- -- -- Box Beam 6’ -- 3’ -- -- -- --

606-4 02

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 Weak-Post Corrugated 12’-6” -- -- 6’-3” 4’-2” -- 3’-1½” HPBO 6’-3” -- -- -- -- 3’-1½”

606-4.02 Anchorage Units, End Assemblies and Transitions for Guide Railing or Median Barrier.

Anchorage units, end assembly units and transitions between various highway guide railing and median barrier systems will be measured by the actual number of units installed in accordance with the plans, standard sheets, manufacturer’s drawings, manufacturer's directions and/or as directed by the Engineer. The payment limits for the Box Beam Guide Rail End Assembly Type III and Box Beam Median Barrier End Assembly, Type C will be separated by a distance of 50 feet extending along the end assembly from the front of the Nose Assembly to a point 50 feet removed. These payment limits apply regardless of whether the Type III End Assembly or Type C End Assembly employs crushable fiberglass elements or beam bursting type mandrels to absorb the energy of the impacting vehicle. The limits of payment for the Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) will extend a distance of 100 feet from the outer end of the terminal. At that point, payment will begin for corrugated beam guide railing. The limits of payment for HPBO (Mod.) Corrugated BeamGuide Railing End Terminal (Energy- Absorbing) will extend a distance of 50 feet from the outer end of the terminal. At that point, payment will begin for heavy post blocked-out corrugated beam guide railing. The limits of payment for HPBO (Mod.) Corrugated BeamMedian Barrier End Terminal (Energy- Absorbing) will extend a distance of 50 feet from the outer end of the terminal. At that point, payment will begin for heavy post blocked-out corrugated beam median barrier.

606-4.03 Concrete Barrier and Terminal Sections. The quantity of concrete barrier sections measured

for payment will be the number of feet placed in accordance with the plans and specifications, measured along the axis of the barrier. The quantity of concrete barrier terminals will be measured by the actual number of units installed in accordance with the plans, standard sheets, and/or as directed by the Engineer

606-4.04 Resetting Guide Railing, Median Barrier and Precast Concrete Barrier. The quantity of

reset guide railing or median barrier measured for payment will be the number of feet reset in accordance with the specifications, plans and as directed by the Engineer, exclusive of anchorage units and end assemblies. If the guide railing is anchored to a structure instead of an anchorage unit or end assembly, measurement will be made up to the structure. The quantity of reset precast concrete barrier measured for payment will be the number of feet placed in accordance with the plans and specifications measured along the axis of the barrier between its extreme outer limits.

606-4.05 Resetting Guide Railing and Median Barrier (New Posts). The Method of Measurement of

§606-4.04 will apply.

606-4.06 Removing and Storing Guide Railing, Median Barrier and Precast Concrete Barrier. The

quantity of removed and stored guide rail and median barrier measured for payment will be the number of feet removed in accordance with the specifications, plans, and as directed by the Engineer, exclusive of anchorage units and end assemblies. If the guide rail or median barrier is anchored to a structure, measurement will be made up to the structure. The quantity of removed and stored precast concrete barrier measured for payment will be the number of feet removed in accordance with the specifications and plans, measured along the axis of the barrier between its extreme outer limits.

606-4.07 Removing and Disposing of Guide Railing, Median Barrier and Concrete Barrier. The

quantity of guide rail and median barrier measured for payment will be the number of feet of railing and posts removed and disposed of in accordance with the specifications and plans, exclusive of anchorage units and end assembly components that would not be used in the middle of a continuous run. The

606-4 08

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 quantity of concrete barrier measured for payment will be the number of feet removed and disposed of in accordance with the specifications and plans measured along the axis of the barrier between its extreme outer limits and including any backup posts.

606-4.08 Removing and Disposing of Guide Posts, Guide Rail Posts, and Median Barrier Posts. The

quantity to be measured for payment will be the number of posts removed and disposed of in accordance with the specifications and plans and as directed by the Engineer.

606-4.09 Resetting Anchorage Unit Assemblies and End Assemblies for Guide Railing and Median

Barrier This work shall be measured by the number of anchorage units and/or terminals reset in accordance with the requirements of the contract documents.

606-4.10 Removing and Storing or Disposing of Anchorage Unit Assemblies and End Assemblies

for Guide Railing and Median Barrier. This work shall be measured by the number of Anchorage Units or End Assemblies properly removed and stored for pick up by others or removed and disposed of in accordance with the contract documents and to the satisfaction of the Engineer

606-4.11 Retensioning Existing Cable Guide Railing and Median Barrier. Quantity measured for

payment will be the number of sections retensioned. A section shall consist of the length of cable guide rail or median barrier running between two concrete anchorage units.

606-4.12 Vacant.

606-4.13 Corrugated Beam Guide Rail Transition to Bridge Rail, Concrete Barrier and Concrete

Parapets. Measurement will be taken as the actual number of transition units installed in accordance with the plans and specifications.

606-4.14 Box Beam Guide Rail Transition to Concrete Barrier. Measurement will be taken as the actual

number of transition units installed in accordance with the specifications, plans and standard sheets.

606-4.15 Vacant

606-4.16 Posts for Existing Highway Barrier. Posts for existing highway barrier will be measured by

the actual number of posts installed in accordance with the contract documents and as directed by the Engineer.

606-4.17 Transition between Concrete Sections. Transitions will be measured by the actual number of

units installed in accordance with the plans, standard sheets and/or as directed by the Engineer.

606-5 Basis of Payment

606-5.01 Guide Railing, Median Barrier, Concrete Barrier and Terminal Sections; Various Types.

The unit price bid for the above work shall include the cost of all labor, equipment and material necessary to complete the work, including the cost of any repairs required, and the costs of bending any rail element to the required curvature. Payment for corrugated guide rail and median barrier, or bent box beam guide rail, will be determined using the payment factors for the various typical post spacings listed in Table 606-2. Payment will be the sum of the products obtained by multiplying the unit price bid for a rail or median barrier by the payment factors listed in Table 606-2 for the relevant post spacings and multiplying each of those products by the length of rail having that given post spacing.

606-5 02

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 Payment for mitered box beam and median barrier with 6 foot post spacings will be made at the unit prices bid. If a reduced post spacing of 3 feet is used for mitered box beam guide rail, the payment will be determined by multiplying the unit price bid by a payment factor of 1.1for the length installed. When posts are driven through asphalt concrete or bituminous treated material, any repairs to damage paved or treated areas shall be at the Contractor's expense. Progress payments will be made when the metal railing and/or metal barrier is erected in the position and manner indicated on the standard sheets and in a manner approved by the Engineer, exclusive of bituminous repair and final alignment. Payment will be made, at the unit price bid, for 90% of the measured quantity erected. The balance of the quantity erected will be paid for upon proper repair to the bituminous surfaces and alignment of the metal railing and/or metal barrier to the specified tolerances.

606-5.02 End Assembly, End Anchorage Units and Transitions for Guide Railing and Median

Barrier. The unit price bid for each end assembly, end anchorage unit or transition shall include the cost of furnishing all labor, materials and equipment necessary to complete the work, including the necessary concrete, excavation, backfill, reflectorization, object markers when required at driveways and vehicle openings, and spring cable assembly (compensating device) and/or steel turnbuckle cable end assembly required for cable guide rail.

606-5.03 Resetting; Removing and Storing; Removing and Disposing; of Guide Railing, Median

Barrier and Concrete Barrier. The unit price bid per foot for the above work items shall include the cost of furnishing all labor, equipment and materials necessary to complete the work and restore the system to full operating capacity. Any materials damaged due to Contractor's operation shall be replaced by him and the cost shall be included in the price bid for this item. Payment for resetting guide rail and median barrier shall include the unit price bid multiplied by the measured quantity multiplied by the payment factor for the various typical post spacings listed in Table 606-2, except that posts required to reduce the post spacing from the original post spacing shall be paid for under the appropriate I-beam post for existing highway barrier item.

A.Progress payments for resetting guide rail, median barrier and precast concrete barrier will be made as follows:
1.25% of the unit price bid for the quantity of guide rail, median barrier or precast concrete barrier removed and stored in accordance with the provisions of §606.3-06 Resetting Guide Railing, Median Barrier and Precast Concrete Barrier.
2.65% of the unit price bid for the measured quantity of guide railing, median barrier or precast concrete barrier cleaned and reset in accordance with the provisions of §606-3.06.
3.The balance of the unit price bid for the quantity of the guide railing, median barrier or concrete barrier will be paid upon repair to the bituminous surfaces damaged by the resetting operations.
B.Progress payments for removing and disposing or storing of guide railing, median barrier or concrete barrier will be made as follows:
1.75% of the unit price bid for the measured quantity of guide railing, median barrier or concrete barrier removed and stored or disposed of as specified.

606-5 04

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

2.The balance of the unit price bid for the measured quantity of guide railing and/or median barrier removed and stored or disposed of as specified will be paid when any voids have been backfilled and disturbed areas are reestablished to the satisfaction of the Engineer.

606-5.04 Removing and Disposing of Guide Posts, Guide Rail Posts and Median Barrier Posts. The

unit price bid per post for the above work items shall include the cost of furnishing all labor, equipment and material necessary to complete the work.

606-5.05 Resetting; Removing and Storing; Removing and Disposing; of Anchorage Unit

Assemblies and End Assemblies for Guide Railing and Median Barrier. The unit price bid for each of these items shall include the cost of furnishing all labor, equipment and material necessary to complete the work including excavation and backfill. If the Contractor elects to install new concrete anchors, in lieu of removing and resetting the existing ones, the cost of furnishing and installing the new anchor as well as the cost for necessary adjustments to the existing one shall be included in the price bid for these items.

A.Progress payments for resetting anchorage units and terminals for guide rail and median barrier will be made as follows:
1.25% of the unit price bid for the quantity of anchorage units and/or terminals removed and stored in accordance with the provisions of §606-3.12 Resetting Anchorage Units and Terminals for Guide Rail and Median Barrier.
2.65% of the unit price bid for the quantity of anchorage units and/or terminals cleaned and reset in accordance with the provisions of §606-3.12 Resetting Anchorage Units and Terminals for Guide Rail and Median Barrier.
3.The balance of the unit bid price for the quantity of anchorage units reset upon the reestablishment of surface areas disturbed.
B.Progress payments for removing and storing or removing and disposing of anchorage units and/or terminals for guide railing and/or median barriers will be made as follows:
1.75% of the unit price bid for the quantity of anchorage units and/or terminals removed and stored or disposed of as specified.
2.The balance of the unit price bid for the quantity of anchorage units and/or terminals removed and stored or disposed of as specified will be paid upon the establishment of surface areas disturbed.

606-5.06 Vacant

606-5.07 Corrugated Beam Guide Rail Transition to Bridge Rail, Concrete Barrier and Concrete

Parapets. The unit price bid per guide rail transition shall include the cost of all labor, materials, and equipment necessary to satisfactorily complete the work, including back-up posts, connections and hardware.

606-5.08 Box Beam Guide Rail Transition to Concrete Barrier. The unit price bid per guide rail

transition shall include the cost of all labor, equipment, and material necessary to satisfactorily complete the work, including back-up posts, necessary rail curvature, splices, connections and hardware.

606-5 09

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3

606-5.09 Vacant

606-5.10 Posts for Existing Highway Barrier The unit price bid for posts for existing highway barrier

shall include the cost of furnishing all labor, equipment, and material necessary to complete the work. Removal of damaged posts and hardware is included in other items of work. When posts are driven through asphalt concrete or bituminous-treated material, any repairs to damaged paved or treated areas shall be at the Contractor's expense.

606-5.11 Retensioning Existing Gable Guide Railing and Median Barrier. The unit price bid for

retensioning a section of cable guide railing or median barrier shall include the cost of all labor, materials and equipment necessary to complete the work.

606-5.12 Transition between Concrete Sections. The unit price bid per concrete transition shall include

the cost of all labor, equipment, and material necessary to satisfactorily complete the work, including back-up posts, connections and hardware. Payment will be made under: Item No. Item Pay Unit 606.01 3-Cable Guide Railing (TL-2) Foot 606.0101 3-Cable Guide Railing (TL-2) With Extra Long Posts Foot 606.010605 4-Cable Mid-Tension Cable Guide Rail with 5 feet Post Spacing Foot 606.010610 4-Cable Mid-Tension Cable Guide Rail with 10 feet Post Spacing Foot 606.0201 Anchorage Unit for 3-Cable Guide Railing (TL-2) Each 602.0202 Anchorage Units for 4-Cable Mid-Tension Cable Guide Railing Each 606.020101 4-Cable Mid-Tension Departure End Cable Terminal Each 606.020102 4-Cable Mid-Tension Approach End Cable Terminal Each 606.0310 Anchorage Units for Cable Median Barrier Each 606.10 Box Beam Guide Railing Foot 606.100002 Box Beam Guide Railing (Shop Bent or Shop Mitered) Foot 606.100003 Box Beam Guide Railing (Shop Mitered) Foot 606.1001 Box Beam Guide Railing With Extra Long Posts Foot 606.100102 Box Beam Guide Railing with Extra Long Posts (Shop Bent or Shop Mitered)Foot 606.100103 Box Beam Guide Railing with Extra Long Posts (Shop Mitered) Foot 606.11 Box Beam Median Barrier Foot 606.110002 Box Beam Median Barrier (Shop Bent or Shop Mitered) Foot 606.110003 Box Beam Median Barrier (Shop Mitered) Foot 606.120101 Box Beam End Piece Each 606.120102 Box Beam Guide Railing End Assembly Type I Each 606.120103 Box Beam Guide Railing End Assembly Type I with 18 ft Extension Each 606.120201 Box Beam Guide Railing End Assembly Type IIA Each 606.1203 Box Beam End Assembly Type III Each 606.1401 Box Beam Median Barrier End Assembly, Type A Each 606.1402 Box Beam Median Barrier End Assembly, Type B Each 606.1403 Box Beam Median Barrier End Assembly, Type C Each 606.17 Corrugated Beam Median Barrier Foot 606.170001 Corrugated Beam Median Barrier (Shop Curved) Foot 606.18 Weak-Post, Corrugated Beam Guide Rail Foot 606.180001 Weak-Post, Corrugated Beam Guide Rail (Shop Curved) Foot 606.1801 Weak-Post, Corrugated Beam Guide Rail

606-5 12

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 With Extra Long Posts Foot 606.180101 Weak-Post, Corrugated Beam Guide Rail With Extra Long Posts (Shop Curved) Foot 606.22 Anchorage Units for Corrugated Beam Guide Railing Each 606.2201 Anchorage Units for Corrugated Beam Guide Railing Buried In Back Slope Each 606.220102 4-Cable Mid-Tension Approach End Cable Terminal (MASH-Compliant) Each 606.0202 Anchorage Units for 4-Cable Mid-Tension Cable Guide Railing Each 606.23 Anchorage Units for Corrugated Beam Guide Railing (Driveways, Walkways, and Other Openings) Each 606.24 Anchorage Units for Corrugated Beam Median Barrier Each 606.26 Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) Each 606.27 HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) Each 606.2701 HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.270101 HPBO (Mod.) Corrugated Beam Guide Railing (Shop Curved) Foot 606.2702 HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts Foot 606.270201 HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts (Shop Curved) Foot 606.2703 Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.2704 Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Buried in Back Slope Each 606.28 HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy-Absorbing) Each 606.2801 HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.280101 HPBO (Mod.) Corrugated Beam Median Barrier (Shop Curved) Foot 606.2802 Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier Each 606.3001 Concrete Barrier Type A (Optional) Foot 606.3002 Concrete Barrier Type B (Optional) Foot 606.3003 Concrete Barrier Type C (Optional) Foot 606.3004 Half Section Concrete Barrier (Optional) Foot 606.3005 Concrete Barrier - Mounting Block Section Each 606.3011 Concrete Barrier Type A (Precast) Foot 606.3012 Concrete Barrier Type B (Precast) Foot 606.3013 Concrete Barrier Type C (Precast) Foot 606.3014 Half Section Concrete Barrier (Precast) Foot 606.3021 Concrete Barrier Type A (Cast-in-Place) Foot 606.3022 Concrete Barrier Type B (Cast-in Place) Foot 606.3023 Concrete Barrier Type C (Cast-in Place) Foot 606.3024 Half Section Concrete Barrier (Cast-in Place) Foot 606.3031 Concrete Barrier Type A (Machine Formed) Foot 606.3032 Concrete Barrier Type B (Machine Formed) Foot 606.3033 Concrete Barrier Type C (Machine Formed) Foot 606.3034 Half Section Barrier (Machined Formed) Foot 606.3041 Single-Slope Concrete Median Barrier (Optional) Foot 606.3042 Single-Slope Concrete Median Barrier (Precast) Foot 606.3043 Single-Slope Concrete Median Barrier (Cast-in-Place) Foot 606.3044 Single-Slope Concrete Median Barrier (Machine Formed) Foot 606.3045 Single-Slope Concrete Median Barrier (Ramped Terminal) Each 606.3051 Single-Slope Concrete Median Barrier - Wide (Optional) Foot 606.3052 Single-Slope Concrete Median Barrier - Wide (Precast) Foot

606-5 12

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 606.3053 Single-Slope Concrete Median Barrier - Wide (Cast-in-Place) Foot 606.3054 Single-Slope Concrete Median Barrier - Wide (Machine Formed) Foot 606.3061 Single-Slope Concrete Half Section Barrier (Optional) Foot 606.3062 Single-Slope Concrete Half Section Barrier (Precast) Foot 606.3063 Single-Slope Concrete Half Section Barrier (Cast-in-Place) Foot 606.3064 Single-Slope Concrete Half Section Barrier (Machine Formed) Foot 606.3110 Embedded Low-Profile Concrete Barrier, TL-2 Feet 606.3111 Embedded Low-Profile Concrete Barrier, TL-2 – Left Terminal Each 606.3112 Embedded Low-Profile Concrete Barrier, TL-2 – Right Terminal Each 606.3113 Free-standing Low-Profile Concrete Barrier, TL-2 Feet 606.3114 Free-standing Low-Profile Concrete Barrier, TL-2 – Terminal Each 606.4701 I-Beam Posts for Existing Cable Median Barrier Each 606.48 Retensioning Existing Cable Guide railing or Median Barrier Each 606.4801 I-Beam Posts for Existing 3-Cable Guide Railing Each 606.4803 Extra Long I-Beam Posts for Existing 3-Cable Guide Railing Each 606.4805 I-Beam Posts for Existing Corrugated Beam Guide Railing Each 606.4806 Tube Posts for Existing 4-Cable Mid-Tension Approach End Terminal Each 606.4807 Extra Long I-Beam Posts for Existing Corrugated Beam Guide Railing Each 606.4809 I-Beam Posts for Existing Box Beam Guide Railing Each 606.4811 Extra Long I-Beam Posts for Existing Box Beam Guide Railing Each 606.4813 I-Beam Posts for Existing Corrugated Beam Median Barrier Each 606.4815 I-Beam Posts for Existing Box Beam Median Barrier Each 606.4818 I-Beam posts for Existing HPBO (Mod.) Corrugated Beam Guide Railing Each 606.4820 Extra Long I-Beam Posts for Existing HPBO (Mod.)Corrugated Beam Guide Railing Each 606.4822 I-Beam Posts for Existing HPBO (Mod.) Corrugated Beam Median Barrier Each 606.4824 Extra Long I-Beam Posts for Existing HPBO (Mod.) Corrugated Beam Median Barrier Each 606.50 Resetting Cable Guide Railing Foot 606.5010 Resetting Cable Median Barrier Foot 606.5048 Resetting Cable Guide Railing (New Posts) Foot 606.5049 Resetting Cable Median Barrier (New Posts) Foot 606.51 Resetting Corrugated Beam Guide Railing Foot 606.5148 Resetting Corrugated Beam Guide Railing (New Posts) Foot 606.52 Resetting Corrugated Beam Median Barrier Foot 606.5248 Resetting Corrugated Beam Median Barrier (New Posts) Foot 606.53 Resetting Box Beam Guide Railing Foot 606.5348 Resetting Box Beam Guide Railing (New Posts) Foot 606.54 Resetting Box Beam Median Barrier Foot 606.5448 Resetting Box Beam Median Barrier (New Posts) Foot 606.5501 Resetting HPBO Corrugated Beam Guide Railing (New 12 in. Blockouts) Foot 606.5601 Resetting HPBO Corrugated Beam Median Barrier (New 12 in. Blockouts) Foot 606.57 Resetting Precast Concrete Barrier Foot 606.5710 Resetting Precast Concrete Barrier- Half Section Foot 606.58 Resetting HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.5801 Resetting HPBO (Mod.) Corrugated Beam Guide Railing (New Posts) Foot 606.5810 Resetting HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.581001 Resetting HPBO (Mod.) Corrugated Beam Median Barrier (New Posts) Foot 606.5901 Resetting Anchorage Units for Cable Guide railing or Median Barrier Each 606.5910 Resetting Anchorage Units for Corrugated Beam Guide Railing or Median Barrier Each

606-5 12

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 606.5920 Resetting Box Beam Guide Rail Turned-Down Terminal Each 606.5921 Resetting Box Beam Guide Rail Energy-Absorbing Terminal Each 606.5930 Resetting Box Beam Median Barrier End Assembly--Type A Each 606.5931 Resetting Box Beam Median Barrier End Assembly--Type B Each 606.5941 Resetting Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.5946 Resetting Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier Each 606.60 Removing and Storing Cable Guide Railing Foot 606.6010 Removing and Storing Cable Median Barrier Foot 606.61 Removing and Storing Corrugated Beam Guide Railing Foot 606.62 Removing and Storing Corrugated Beam Median Barrier Foot 606.63 Removing and Storing Box Beam Guide Railing Foot 606.64 Removing and Storing Box Beam Median Barrier Foot 606.65 Removing and Storing Precast Concrete Barrier Foot 606.6510 Removing and Storing Precast Concrete Barrier-Half Section Foot 606.66 Removing and Storing HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.67 Removing and Storing HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.6910 Removing and Storing Anchorage Units for Corrugated Beam Guide Railing and Median Barriers Each 606.6911 Removing and Storing Weak- and Heavy-Post Corrugated Beam Terminals Each 606.6920 Removing and Storing Box Beam Guide Railing End Assembly Each 606.6932 Removing and Storing Box Beam Median Barrier End Assembly-Type C Each 606.6941 Removing and Storing Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing Each 606.6946 Removing and Storing Anchorage Units for HPBO(Mod) Corrugated Beam Median Barrier Each 606.70 Removing and Disposing Cable Guide Railing Foot 606.7010 Removing and Disposing Cable Median Barrier Foot 606.71 Removing and Disposing Corrugated Beam Guide Railing Foot 606.7101 Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing Foot 606.72 Removing and Disposing Corrugated Beam Median Barrier Foot 606.7201 Removing and Disposing HPBO (Mod.) Corrugated Beam Median Barrier Foot 606.73 Removing and Disposing Box Beam Guide Railing Foot 606.74 Removing and Disposing Box Beam Median Barrier Foot 606.75 Removing and Disposing Concrete Barrier Foot 606.7510 Removing and Disposing Concrete Barrier-Half Section Foot 606.76 Removing and Disposing of Guide Posts, Guide Rail Posts, and Median Barrier Posts Each 606.79 Removing and Disposing Anchorage Units for Cable Guide railing or Median Barrier Each 606.7910 Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier Each 606.7911 Removing and Disposing Weak- and Heavy-Post Corrugated Beam Energy-Absorbing Terminals Each 606.7920 Removing and Disposing Box Beam Guide Rail Turned-Down Terminal Each 606.7921 Removing and Disposing Box Beam Energy-Absorbing Terminal Each 606.7930 Removing and Disposing Box Beam Median Barrier End Assembly-Type A Each 606.7931 Removing and Disposing Box Beam Median Barrier

606-5 12

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 End Assembly--Type B Each 606.7932 Removing and Disposing Box Beam Median Barrier End Assembly-Type C Each 606.7941 Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing Each 606.7946 Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Median Barrier Each 606.8101 Guide Rail Transition Weak-Post Corrugated Beam to Box Beam Guide Rail (One or Two Way Operation) Each 606.8201 Guide Rail Transition Box Beam to Weak-Post Corrugated Beam Guide Rail (One Way Only) Each 606.83 Guide Rail Transition Box Beam to 3-Cable (One or Two-Way) Each 606.84 Guide Rail Transition 3-Cable to Box Beam (One-Way Only) Each 606.8401 Guide Rail Transition Box Beam to Mid-Tension Cable (One Way Only) Each 606.8501 Median Barrier Transition Weak-Post Corrugated Beam to Box Beam Each 606.86 Guide Rail Transition Corrugated Beam to Thrie Beam Each 606.8701 Corrugated Beam Guide Railing Transition Assembly Two Rail Steel Bridge Railing Each 606.8702 Corrugated Beam Guide Railing Transition Assembly Four Rail Steel Bridge Railing Each 606.8703 Corrugated Beam Guide Railing Transition Assembly Discontinuous Steel Bridge Railing Each 606.8704 Corrugated Beam Guide Railing Transition Assembly Concrete Parapets, or Concrete Barrier Each 606.8801 Transition from Box Beam Guide Rail to Jersey-shaped Concrete Barrier (One- or Two-Way Operation) Each 606.8802 Transition from Jersey-shaped Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8803 Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) Each 606.8804 Transition Between Single Slope Half Section Concrete Barrier and Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8805 Transition Between Box Beam Median Barrier and Single Slope Concrete Median Barrier Each 606.8806 Transition from Box Beam Guide Rail to Full-Section Single-Slope Concrete Barrier (One- or Two-Way Operation) Each 606.8807 Transition from Full-Section Single-Slope Concrete Barrier to Box Beam Guide Rail (One Way - Trailing End of Barrier) Each 606.8901 Transition: HPBO (Mod.) Corrugated Guide Railing to Beam Box Beam Guide Railing Each 606.8902 Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Weak Post Corrugated Beam Guide Railing Each 606.8903 Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Single Slope Concrete Half Section Barrier Each 606.8904 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Beam Box Beam Median Barrier Each 606.8905 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Weak Post Corrugated Beam Median Barrier Each 606.8906 Transition: HPBO (Mod.) Corrugated Beam Median Barrier to Single Slope Concrete Median Barrier Each 606.9001 Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier Each

607-1 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 606.9002 Transition between Wide and Normal Single Slope Concrete Median Barrier Each 606.9003 Transition between Half-Section and Full-Section Single Each Slope Concrete Barrier (Left Pocket) 606.9004 Transition between Half-Section and Full-Section Single Each Slope Concrete Barrier (Right Pocket)

Get an email when 606 changes

New York revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications (US Customary Units), 2026 (Jan) Edition. Pages 691–715 of 1,489. View official source ↗

Ask about this section

Scoped to New York Standard Specifications (Construction and Materials), Section 606 — Guide Railing, Median Barrier, and Concrete Barrier. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.