NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 Requirements (Testing). The Durability Factor of concrete made from lightweight ag gregates, as determined in accordance with ASTM C666, shall not be less than 80 percent.
703-90 for Site Manager Use
703-91 for Site Manager Use
703-99 for Site Manager Use
SECTION 704 - MASONRY UNITS
704-01 Common Brick
SCOPE. This specification covers the material and quality requirements for common brick, made from clay or shale, used in the construction of drainage structures and manholes. TABLE 703-12 LIGHTWEIGHT AGGREGATE REQUIREMENTS (TESTING) Test Method Fine Agg regate Coarse Ag gregate Magnesium Sulfate (NY 703-06P,G). Max. % Loss by Weight after 5 c ycles. 30 - Magnesium Sulfate (NY 703-07P,G). Max. % Loss by Weight after 10 c ycles. - 18/32 (1) Los Angeles Abrasion Test (ASTM C13 1). Max % Loss by Weight (Grading B or C). - 50
704-02 Concrete Brick
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 MATERIAL REQUIREMENTS. Brick shall conform to the requirements of ASTM C32, Grade M S, including t he requirement for saturation coefficient. Common brick may be furnished in any of the designated standard sizes that will produce the required dimensions in the completed structure, and the bricks shall be solid. SAMPLING AND TESTING. Samples, when requested by the Department, shall be randomly selected from production -run material. A minimum of 10 full -size bricks of the same size and style will be required. Samples will be tested for the physical properties id entified in ASTM C32. Tests will be performed in accordance with ASTM 67. BASIS OF ACCEPTANCE. Common brick will be accepted on the basis of a material certification that specifies the product conforms to this specification.
704-02 Concrete Brick
SCOPE. This specification covers the material and quality requirements for concrete brick produced in accordance with the current Materials Procedure for Concrete Masonry QC/QA titled “Procedures for Achieving and Maintaining Concrete Masonry Units Approv ed List Status”. Item 704 -02 can be used in brick masonry construction, altering drainage structures, leaching -basins and manholes (section 604). MATERIAL REQUIREMENTS. Concrete brick shall conform to the requirements of ASTM C936, except as noted herei n. Certain aggregates appear in the Approved List of Sources of Fine and Coarse Aggregates that have use limitations with high alkali Portland Cement. Materials used in the manufacture of concrete brick shall meet the requirements of the following subsect ions: Portland Cement 701-01 Coarse Aggregate 703-02 Mortar Sand 703-03 Grout Sand 703-04 Concrete Sand 703-07 Fly Ash 711-10 Ground, Granulated Blast -Furnace Slag 711-12 Water 712-01 Fly ash or ground, granulated blast -furnace slag may be substituted up to a maximum of 20% by weight of the total amount of cement plus pozzolan in the mix. Pigments used for integral coloring shall meet the requirements of ASTM C979. Other materials may be used in the manufacture as approved by the Director, Materials Bureau. The nominal dimensions of the brick shall be 8 inches long, 4 inches wide, and 2⅔ inches in height.
704-03 Precast Concrete - General
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 BASIS OF ACCEPTANCE. Concrete brick will be accepted on the job site based on the following: • The manufacturer's name must appear on the Department’s Approved List for the item being supplied. • A manufacturer’s certification. An acceptable product evaluation made by the Engineer.
704-03 Precast Concrete - General
SCOPE. This specification covers the general material and quality requirements for precast concrete items produced in accordance with the current Materials Procedure for precast concrete QC/QA titled “Procedures For Achieving And Maintaining Precast Concrete M anufacturer’s Approved List Status”. It is intended for use in conjunction with the individual item specifications. MATERIAL REQUIREMENTS. The Portland Cement Concrete shall meet the requirements in §501 Portland Cement Concrete – Production, §501 -2.02 and Materials Procedure (MP) 501 -1 Plant Production Requirements and Procedures for Portland Cement Concrete Facilities except as noted herein. The Portland Cement Concrete shall meet the requirements in §501, Portland Cement Concrete - General; §501 -2.02, §501 -2.03 and §501 -3.02 except as noted herein. Cement may be used in conjunction with pozzolans to achieve the required performance characteristics of the concrete mixture. Type 1, 2 or 3 cement may be used. The manufacturer may substitute pozzolans up to a maximum of 20% by weight of the total amount of cement plus pozzolan in the mix. Certain aggregates appear in the Approved List of Sources of Fine & Coarse Aggregates that have use limitations with a high alkali portland cement. When requested, the Materials Bureau may approve this combination when 15 -20% by weight of the cement in the mix is replaced with fly ash. The concrete shall have an air content of 5.0 to 9.0%. Unless noted otherwise in the contract documents, approved fabrication drawings or item specification, the minimum compressive strength of concrete used in precast units shall be 3000 psi @ 28 days. Threaded inserts used to connect reinforcing steel to precast concrete shall be non -corrosive and shall have a tensile capacity of at lea st 50% of the yield strength of the reinforcing steel. The use of galvanized reinforcing in place of specified epoxy coated reinforcing is allowed. If galvanized reinforcing is used, all reinforcing in the unit must be galvanized. The use of galvanized dowels to attach secondary pours, requires all reinforcing in secondary pours to be galvanized. When galvanized wire fabric for concrete reinforcement is used, it shall be galvanized in accordance with ASTM A123. Fabrication, including bending of fabric, shall be performed prior to galvanizing. Additional materials, listed below, shall meet the requirements of the following subsections: Concrete Repair Material 701-04 Concrete Repair Material - High Early Strength 701-12 Bar Reinforcement , Grade 60 709-01 Wire Fabric For Concrete Reinforcement 709-02 Epoxy Coated Bar Reinforcement, Grade 60 709-04 Epoxy Coated Wire Fabric Reinforcement 709-08 Cold -Drawn Wire For Concrete Reinforcement 709-09 Mechanical Connectors for Reinforcing Bar Splices (Epoxy Coated) 709-10 Galvanized Bar Reinforcement 709-11 Quilted Covers (for curing) 711-02 Plastic Coated Fiber Blankets (for curing) 711-03 Polyethylene Curing Covers (White Opaque) 711-04 Membrane Curing Compound (Clear w/Fugitive Dye) 711-05 Burlap 711-06
704-03 Precast Concrete - General
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 Corrosion Inhibitor 711-13 DRAWINGS. Precast concrete units shall be fabricated to conform to the details contained in the plans and contract documents. Fabrication Drawings shall be one of the following:
704-03 Precast Concrete - General
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 bear on the faces of forms, shall be made of, or coated with, non -corrosive material so that no discoloration will show on the face of the units. Chairs, tie wires and other dev ices used to support, position or fasten epoxy coated or galvanized reinforcement shall be made of or coated with a dielectric material. Tack welding or any other welding of specified steel reinforcement will not be allowed. Welding for cage stability wi ll be permitted provided that redundant steel is added in each direction and tied to the cage. The redundant steel shall be thirty (30) bar diameters, minimum, in length and shall be positioned so that the midpoint is located at the weld.
704-03 Precast Concrete - General
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4
704-03 Precast Concrete - General
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 be approved based on a manufacturers certification of compliance with these requirements. Type 6 white cement, meeting the requirements of §701 -01, may be used to achieve the desired color. Coloring pigment shall be added to the conc rete mix per manufacturer’s recommendations, at a dosage rate to achieve the desired color as specified in the contract documents. The manufacturer’s recommended maximum dosage rate shall not be exceeded.
704-03 Precast Concrete - General
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 enclosure to maintain the initial temperature of the concrete. The maximum temperature inside the enclosure during the preset period shall be the initial temperature of t he concrete +10 °F. After the preset period is complete, steam shall be injected into the curing enclosure. The temperature inside the enclosure shall not be increased at a rate greater than 40°F per hour. A moist atmosphere shall be maintained at a tempera ture between 105°F and 185°F for a period of not less than 12 hours. The temperature inside the enclosure shall then be decreased at a rate not exceeding 40°F per hour until the ambient temperature outside the enclosure is reached. The manufacturer shall provide automatic temperatu re recorders to continuously record the curing temperature inside the enclosure.
704-03 Precast Concrete - General
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4
704-04 Concrete Block (Slope Paving)
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 SAMPLING AND TESTING. Sampling and testing shall be done by the precast manufacturer in accordance with Materials Bureau requirements contained in the current Materials Procedure for precast concrete. MARKING. All precast units shall be clearly marked with permanent waterproof paint. Unless noted otherwise in the item specification, units shall be marked on an inside or back surface which wil l not be exposed to view after installation. The following information shall be included: Name or trademark of the manufacturer. Date of manufacture. Unique piece identification number. NYSDOT Contract number. FINAL PRODUCTION INSPECTION. A final prod uction inspection shall be performed by the precast manufacturer on every precast unit produced for the Department. An inspection will be considered satisfactory when it verifies that the precast unit is in compliance with the appropriate Department speci fications. The specific requirements and procedures for the inspection are contained in the precast manufacturer’s Department approved Quality Control Plan. SHIPPING. Upon completion of a satisfactory final production inspection the precast unit may be shipped from the manufacturing location except that units produced between the dates of October 31st and April 1st shall not be shipped for a minimum of 72 hours following the completion of casting. BASIS OF ACCEPTANCE. Precast units will be accepted a t the job site based on the following: The manufacturer’s name must appear on the Department’s Approved List for the item being supplied. A manufacturer’s certification. An acceptable product evaluation made by the Engineer.
704-04 Concrete Block (Slope Paving)
SCOPE. This specification covers the material details and quality requirements for concrete block for use in concrete block slope paving and produced in accordance with the current Materials Procedure for Concrete Masonry QC/QA titled “Procedures for Achieving an d Maintaining Concrete Masonry Units Approved List Status”. MATERIAL REQUIREMENTS. Certain aggregates appear in the Approved List of Sources of Fine and Coarse Aggregates that have use limitations with high alkali Portland Cement. Materials used in the manufacture of concrete block shall meet the requirements of the following subsections: Portland Cement 701-01 Coarse Aggregate 703-02 Mortar Sand 703-03 Grout Sand 703-04 Concrete Sand 703-07 Fly Ash 711-10 Ground, Granulated Blast -Furnace Slag 711-12 Water 712-01 Fly ash or ground granulated blast furnace slag may be substituted for up to a maximum of 20% by weight of the total amount of cement plus pozzolan in the mix. Pigments used for integr al coloring shall meet the requirements of ASTM C979. Other materials may be used in the manufacture as approved by the Director, Materials Bureau.
704-05 Precast Concrete Barrier
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4
704-05 Precast Concrete Barrier
SCOPE. This specification covers the material and quality requirements for precast concrete barrier used in highway applications, precast concrete barrier for structures, and precast temporary concrete barrier. MATERIAL REQUIREMENTS. The Material Requirements contained in 704 -03 Precast Concrete - General shall apply except as noted herein. Concrete mixtures used under this specification shall have a maximum cement content of 750 lbs per cubic yard. Unless noted otherwise in the contract documents or approved fabrication drawings, the compressive strength of concrete used in precast concrete barrier shall be as follows: Concrete Barrier 3,000 psi (minimum) @ 28 days Concrete Barrier for Structures 5,000 psi (minimum) @ 28 days Temporary Concrete Bar rier 3,000 psi (minimum) @ 28 days All reinforcing steel for Concrete Barrier and Concrete Barrier For Structures shall be epoxy coated meeting the requirements of 709 -04 Epoxy Coated Bar Reinforcement, Grade 60. All reinforcing steel for Temporary Con crete Barrier shall meet the requirements of 709 -01 Bar Reinforcement, Grade 60. DRAWINGS. The drawing requirements contained in 704 -03 Precast Concrete - General shall apply except as noted herein. Concrete Barrier and Temporary Concrete Barrier shall u se dimensions as shown on the Standard Sheets. Concrete Barrier for Structures shall use dimensions as shown on the Bridge Design (BD) Sheets. FABRICATION. The fabrication requirements contained in 704 -03 Precast Concrete - General, as well as the follo wing shall apply. • Cross -sectional dimensions shall not vary from the dimensions shown by more than 1/4 inch . • Barrier shall not be out of plumb by more than 1/4 inch .
704-06 Precast Concrete Wall Units and Precast Concrete Cribbing
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 • Longitudinal dimensions shall not vary from the dimensions shown by more than 1/4 inch per 10 feet of barrier. • When checked with a 10 foot straight edge, irregularities shall not exceed 1/4 inch . SAMPLING AND TESTING. The Sampling and Testing requirements contained in 704 -03 Precast Concrete - General shall apply. MARKING. The Marking requirements contained in 704 -03 Precast Concrete - General shall apply except as noted herein. Concrete Barrier and Concrete Barrie r For Structures shall be marked on one end of each barrier segment such that they will not be exposed to view after installation. Temporary Concrete Barrier shall be marked with “NYSDOT” in place of a Department contract number. In addition, each Temporar y Concrete Barrier segment shall be permanently marked with a manufacturer’s identification and a date of manufacture in a manner that will remain legible throughout its service life. The date, at a minimum, shall contain the month and year. Permanent mark ings shall be placed in a consistent location on the top, bottom, or one end of each segment. Imprinting the required information a minimum of 1/4 inch into the concrete surface will be considered an acceptable permanent marking. Paint will not be consider ed a permanent marking. If permanent markings are located on the bottom of the segment, paint markings matching the permanent markings shall be placed on one end of each segment to facilitate field inspection. FINAL PRODUCTION INSPECTION. The Final Produ ction Inspection requirements contained in
704-03 Precast Concrete - General shall apply.
SHIPPING. The Shipping requirements in 704 -03 Precast Concrete - General shall apply. BASIS OF APPROVAL. Designs for permanent, standard Concrete Barrier other th an those shown on the Standard Sheets will not be approved. Concrete Barrier for Structures designs may be proposed, and if found acceptable, will be placed on the Approved List. Evidence shall be provided that the proposed anchorage system has been succes sfully tested in accordance with the procedural directives issued by the DCES. Temporary Concrete Barrier designs other than those shown on the Standard Sheets may be proposed, and if found acceptable, will be placed on the appropriate Approved List based on their deflection and fixity (pinned or unpinned). Evidence shall be provided that the temporary concrete barrier, with the proposed joint system and anchorage, is MASH compliant. Additionally, the submitted design must include details of a barrier seg ment that can connect between the proposed system and NYSDOT’s generic Temporary Concrete Barrier. BASIS OF ACCEPTANCE. The Basis of Acceptance requirements contained in §704 -03 Precast Concrete - General shall apply.
704-06 Precast Concrete Wall Units and Precast Concrete Cribbing
SCOPE. This specification covers the material and fabrication requirements of precast co ncrete wall units and precast concrete cribbing for prefabricated wall systems. MATERIAL REQUIREMENTS. The Material Requirements contained in §704 -03 shall apply. DRAWINGS. The Drawing requirements contained in §704 -03 shall apply. FABRICATION. The Fabrication requirements contained in §704 -03 shall apply.
704-07 Dry Cast Concrete Wall Units
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 SAMPLING AND TESTING. The Sampling And Testing requirements contained in §704 -03 shall apply. MARKING. The Marking requirements contained in §704 -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production Inspection requirements contained in §704 -03 shall apply. SHIPPING. The Sh ipping requirements contained in §704 -03 shall apply. BASIS OF ACCEPTANCE. The Basis Of Acceptance requirements contained in §704 -03 shall apply.
704-07 Dry Cast Concrete Wall Units
SCOPE. This specification covers the material details and quality requirements for dry cast concrete wall units produced in accordance with the current Materials Procedure for Concrete Masonry QC/QA titled “Procedures for Achieving and Maintaining Concrete Masonr y Units Approved List Status”. MATERIAL REQUIREMENTS. Provide dry cast concrete wall units meeting the style and color requirements in the contract documents. Certain aggregates appear in the Approved List of Sources of Fine and Coarse Aggregates that ha ve use limitations with high alkali Portland cement. Use materials, meeting the following requirements, in the manufacture of dry cast concrete wall units : Portland Cement 701-01 Coarse Aggregate 703-02 Mortar Sand 703-03 Grout Sand 703-04 Concrete Sand 703-07 Fly Ash 711-10 Ground, Granulated Blast -Furnace Slag 711-12 Water 712-01 Fly ash or ground, granulated blast -furnace slag may be substituted for up to a maximum of 20% by weight of the total amount of cement plus pozzolan in the mix. Use integral coloring pigments, when required, meeting the requirements of ASTM C979. Other materials may be used in the manufacture as approved by the Director, Materials Bureau.
704-08 Brick Sidewalk and Driveway Pavers
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 SAMPLING AND TESTING. When samples are requested by the Department, they will be randoml y selected from production -run material. A minimum of 5 samples, prepared by the manufacturer in accordance with ASTM C140, will be required for compression testing. A minimum of five samples, prepared by the manufacturer in accordance with ASTM C1262, wil l be required for freeze/thaw testing. Samples will be tested for compressive strength in accordance with ASTM C140. Samples will be tested for freeze/thaw durability in accordance with ASTM C1262. BASIS OF ACCEPTANCE. Dry cast concrete wall units will be accepted on the job site based on the following: • The manufacturer's name and block style must appear on the Department’s Approved List for the item being supplied. • A manufacturer’s certification. • Conformance to the approved material detail drawing(s). An acceptable product evaluation made by the Engineer.
704-08 Brick Sidewalk and Driveway Pavers
SCOPE. This specification covers the material and quality requirements for brick pavers made from extruded fire clay or shale for use in brick paving. MATERIAL REQUIREMENTS. Brick pavers shall conform to the requirements of ASTM C902, Class SX, Type I. Brick pavers shall be the shape, size, and color shown in the contract documents. SAMPLING AND TESTING. Samples, when requested by the Department, shall be randomly select ed from production -run material. A minimum of 10 full -size bricks of the same size and style will be required. Samples will be tested for the physical properties identified in ASTM C902. Tests will be performed in accordance with ASTM C67. BASIS OF AC CEPTANCE. Brick sidewalk and driveway pavers will be accepted on the basis of a material certification that specifies the product conforms to this specification.
704-09 Stone Blocks
SCOPE. This specification covers the material and quality requirement s for stone blocks for use in Grouted Stone Block Paved Sidewalks and Driveways. MATERIAL REQUIREMENTS. Stone blocks shall be new or used granite or other stone as specified. The blocks shall be sound and durable, reasonably uniform in quality and textu re throughout, free from shale, excess mica, seams, scaling or evidence of disintegration. Color shall be as specified. Samples of stone blocks shall be submitted to and be approved by the Engineer prior to beginning of work. The blocks shall be rectang ular in shape, with the following approximate dimensions: 8 - 12 inches in length, 3 - 5 inches in depth, unless otherwise specified or approved, and so dressed that they may be laid with a maximum of 1 1/4 inch joints or as specified. All blocks shall ha ve one reasonably smooth split face with no projections or depressions over 1/4 inch . Cutting of blocks to meet the pattern requirements will be permitted subject to the approval of the Engineer. BASIS OF ACCEPTANCE. Stone blocks shall be inspected, by the Engineer, for dimensional and color compliance upon arrival at the project location. Blocks not in compliance with the contract documents may be rejected by the Engineer.
704-10 Split -Faced Concrete Brick
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4
704-10 Split -Faced Concrete Brick
SCOPE. This specification covers the materia l details and quality requirements for split faced concrete brick for use in facing structural walls and produced in accordance with the current Materials Procedure for Concrete Masonry QC/QA titled “Procedures for Achieving and Maintaining Concrete Masonr y Units Approved List Status”. MATERIAL REQUIREMENTS. Split -faced concrete brick shall conform to the requirements of ASTM C90, except as noted herein. The shape, size, and color of split -faced concrete brick shall be as shown in the contract documents. T he splitting operation shall leave relatively sharp, straight and parallel edges. Certain aggregates appear in the Approved List of Sources of Fine and Coarse Aggregates that have use limitations with high alkali Portland Cement. Materials used in the ma nufacture of split -faced concrete brick shall meet the requirements of the following subsections: Portland Cement 701-01 Coarse Aggregate 703-02 Mortar Sand 703-03 Grout Sand 703-04 Concrete Sand 703-07 Fly Ash 711-10 Ground, Granulated Blast -Furnace Slag 711-12 Water 712-01 Fly ash or ground, granulated blast -furnace slag may be substituted for up to a maximum of 20% by weight of the total amount of cement plus pozzolan in the mix. Pigments use d for integral coloring shall meet the requirements of ASTM C979. Other materials may be used in the manufacture as approved by the Director, Materials Bureau. SAMPLING AND TESTING. When samples are requested by the Department, they will be randomly selec ted from production -run material. A minimum of 10 full -size, split -faced bricks of the same size and style will be required. Five samples will be tested for compressive strength and five for absorption, in accordance with ASTM C140. The manufacturer shall be responsible for having brick tested for linear drying shrinkage in accordance with ASTM C90. A copy of the test report shall be included with the samples submitted to the Department for compression and absorption testing. BASIS OF ACCEPTANCE. Split -faced concrete brick will be accepted on the job site based on the following: • The manufacturer's name must appear on the Department’s Approved List for the item being supplied. • A manufacturer’s certification. An acceptable product evaluation made by the En gineer.
704-11 Precast Concrete Coping
SCOPE. This specification covers the material and quality requirements for precast concrete coping. MATERIAL REQUIREMENTS. The Material Requirements contained in §704 -03 shall apply. DRAWINGS. The Drawing requirements contained in §704 -03 shall apply.
704-12 Concrete Block
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 FABRICATION. The Fabrication requirements contained in §704 -03 shall apply except as noted herein. Coping shall be produced with a dense, smooth, uniform finished surface without rubbing or additional treatment. Corners shall have a maximum radius of 1/8 inch and g rinding will not be allowed. Coping shall be removed from the forms and handled in a manner that will prevent chipping of the edges and faces of the concrete.
704-12 Concrete Block
SCOPE. This specification covers the material and quality requirements for concrete block for use in structural walls and produced in accordance with the current Materials Procedure for Concrete Masonry QC/QA titled “Procedures for Achieving and Maintaining Concrete Masonry Units Approved List Status”. MATERIAL REQUIREMENTS. Concrete block shall conform to the requirements of ASTM C90 except as noted herein. The shape, size, and color of concrete block shall be as shown in the contract documents. Certain aggregates appear in the Approved List of Sources of Fine and Coarse Aggregates that have use limitations with high alkal i Portland Cement. Materials used in the manufacture of concrete block shall meet the requirements of the following subsections: Portland Cement 701-01 Coarse Aggregate 703-02 Mortar Sand 703-03 Grout Sand 703-04 Concrete Sand 703-07 Fly Ash 711-10 Ground, Granulated Blast -Furnace Slag 711-12 Water 712-01
704-13 Precast Concrete Driveway and Sidewalk Pavers
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 Fly ash or ground, granulated blast -furnace slag may be substituted for up to a maximum of 20% by weight of the total amount of ceme nt plus pozzolan in the mix. Pigments used for integral coloring shall meet the requirements of ASTM C979. Other materials may be used in the manufacture as approved by the Director, Materials Bureau. SAMPLING AND TESTING. When samples are requested by th e Department, they will be randomly selected from production -run material. A minimum of 10 full -size concrete blocks of the same size and style will be required. Five samples will be tested for compressive strength and five for absorption, in accordance wi th ASTM C140. The manufacturer shall be responsible for having block tested for linear drying shrinkage in accordance with ASTM C90. A copy of the test report shall be included with the samples submitted to the Department for compression and absorption tes ting. BASIS OF ACCEPTANCE. Concrete block will be accepted on the job site based on the following: • The manufacturer's name must appear on the Department’s Approved List for the item being supplied. • A manufacturer’s certification. • An acceptable product e valuation made by the Engineer .
704-13 Precast Concrete Driveway and Sidewalk Pavers
SCOPE. This specification covers the material details and quality requirements for precast concrete pavers used for driveway and sidewalk paving and produced in accordan ce with the current Materials Procedure for Concrete Masonry QC/QA titled “Procedures for Achieving and Maintaining Concrete Masonry Units Approved List Status”. MATERIAL REQUIREMENTS. Precast concrete pavers shall meet the requirements of ASTM C936 excep t as noted herein. The shape, size, and color of precast concrete pavers shall be as shown in the Contract documents. Certain aggregates appear in the Approved List of Sources of Fine and Coarse Aggregates that have use limitations with high alkali Portlan d Cement. Materials used in the manufacture of precast concrete pavers shall meet the requirements of the following subsections: Portland Cement 701-01 Coarse Aggregate 703-02 Mortar Sand 703-03 Grout Sand 703-04 Concrete Sand 703-07 Fly Ash 711-10 Ground, Granulated Blast -Furnace Slag 711-12 Water 712-01 Fly ash or ground, granulated blast -furnace slag may be substituted for up to a maximum of 20% by weight of the total amount of cemen t plus pozzolan in the mix. Pigments used for integral coloring shall meet the requirements of ASTM C979. Other materials may be used in the manufacture as approved by the Director, Materials Bureau.
704-14 PRECAST CONCRETE P ANEL UNITS (Mechanically Stabilized Earth System)
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 SAMPLING AND TESTING. When samples are requested by the Department, they will be randomly selected from production -run material. A total of 15 precast concrete pavers of the same size and style will be required. Five samples will be tested for c ompressive strength and five for absorption, in accordance with ASTM C140. Five samples will be tested for freeze/thaw durability in accordance with NYSDOT test methods. BASIS OF ACCEPTANCE. Precast concrete driveway and sidewalk pavers will be accepted o n the job site based on the following: • The manufacturer's name must appear on the Department’s Approved List for the item being supplied. • A manufacturer’s certification. An acceptable product evaluation made by the Engineer.
704-14 PRECAST CONCRETE PANE L UNITS (Mechanically Stabilized Earth System)
SCOPE. This specification covers the material and quality requirements for precast concrete panel units used to construct a mechanically stabilized earth system. MATERIAL REQUIREMENTS. The Material Requirements contained in §704 -03 shall apply except as noted herein. Unless noted otherwise in the contract documents or approved fabrication drawings the concrete used to fabricate panel units shall have a minimum compressive strength of 5000 psi @ 28 days. Reinforcing steel shall be epoxy coated meeting the requirements of §709 -04 or §709 -08. Embedded items shall be as detailed on the fabrication drawings. Acceptance of embedded items will be based on manufacturer’s certification, unless otherwise directed by the Materials Bureau. When steel embeddments are required, they shall be galvanized to §719 -01. DRAWINGS. The drawing requirements contained in §704 -03 shall apply. FABRICATION. The Fabrication requirements contained in §704 -03, along with the following, shall apply.
704-15 Precast Concrete Pavement Slab Systems
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4
704-15 Precast Concrete Pavement Slab Systems
SCOPE. This specification covers material and fabrication requirements for precast concrete pavement slab systems. Approved systems can be supplied by any manufacturer appearing on the Department’s Approved List entitled “Precast Concrete Manufacturers Approve d for QC/QA Production – Groups 1 & 6,” provided they obtain approval from the system designer.
704-15 Precast Concrete Pavement Slab Systems
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 SYSTEM APPROVAL. For Approved List consideration, the system designer must submit the following information to the Materials Bureau. After the Materials Bure au reviews the submitted information, the system designer will be required to perform a trial installation as detailed herein.
704-15 Precast Concrete Pavement Slab Systems
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4
704-15 Precast Concrete Pavement Slab Systems
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 MATERIAL REQUIREMENTS. Apply §704 -03, Precast Concrete – General, except as noted herein.
704-16 Thru 704 -22 for Site Manager Use
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 B. Curing. When membrane curing compound is the selected curing method and the slabs are exposed to sunlight while curing, use a white pigmented membrane curing compound from the Department’s Approved List instead of a clear compound with fugitive dye. SAMPLING AND TESTING. Apply §704 -03, Precast Concrete - General. MARKING. Apply §704 -03, Precast Concrete - General. FINAL PRODUCTION INSPECTION. Apply §704 -03, Precast Concrete - General. SHIPPING. Apply §704 -03, Precast Concrete - General. BASIS OF ACCEPTANCE. Apply §704 -03, Precast Concrete – General, and the following: • The system must appear on the Department’s Ap proved List entitled “Precast Concrete Pavement Slabs Systems (§704 -15).” • Written approval from the system designer to use the approved system if the manufactu rer is not the system designer.
704-16 Thru 704 -22 for Site Manager Use
704-23 Precast Concrete Street Pavers
SCOPE. This specification covers the material and quality requirements for precast concrete pavers used for street paving and produced in accordance with the current Materials Procedure for Concrete Masonry QC/QA titl ed “Procedures for Achieving and Maintaining Concrete Masonry Units Approved List Status”. MATERIAL REQUIREMENTS. Precast concrete pavers shall meet the requirements of ASTM C936 except as noted herein. The shape, size, and color of precast concrete pave rs shall be as shown in the contract documents. Minimum thickness for precast concrete street pavers shall be 3 1/8 inches. Certain aggregates appear in the Approved List of Sources of Fine and Coarse Aggregates that have use limitations with high alkali Portland cement. Materials used in the manufacturing of precast concrete pavers shall meet the requirements of the following subsections: Portland Cement 701-01 Coarse Aggregate* 703-02 Mortar Sand* 703-03 Grout Sand* 703-04 Concrete Sand* 703-07 Fly Ash 711-10 Ground, Granulated Blast -Furnace Slag 711-12 Water 712-01 *Aggregates . For precast concrete pavers or equivalent products placed in concrete highway wearing surfaces, use aggregate from a source or sources on the “Approved List of Sources of Fine and Coarse Aggregate.” All aggregate must be approved for use in concrete. Fine aggregate, natural or manufactured sand, must meet the requirements of §703-01, Fine Aggregate. Crushed stone, crushed gravel, or crushed slag from a coarse aggregate source must meet the requirements of §703-02, Coarse Aggregate. Aggregate friction requirements : Sample and test aggregate for friction characteristics according to the procedures of Ma terials Method 28 “Friction Aggregate Control and Test Procedures”, PCC Sand.
704-24 Precast Concrete Panels
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 The Engineer will identify pavement areas, if any, represented by failing samples according to the procedures of Materials Method 28 “Friction Aggregate Control and Test Procedu res.” Aggregate must contain at least 25.0% acid -insoluble residue in the plus No. 30 size fraction and in the minus No. 30, plus No. 200 size fraction. If more than one source of aggregate is used, aggregate from each source must meet the acid -insoluble residue requirements. Fly ash or ground, granulated blast -furnace slag may be substituted up to a maximum of 20% by weight of the total amount of cement plus pozzolan in the mix. Pigments used for integral coloring shall meet the requirements of ASTM C979. Other materials may be used in the manufacture as approved by the Director, Materials Bureau.
704-24 Precast Concrete Panels
SCOPE. This specification covers the material and fabrication requirements for precast concrete panels. MATERIAL REQUIREMENTS. The Material Requirements contained in §704 -03 shall apply. DRAWINGS. The Drawing requirements contained in §704 -03 shall apply. FABRICATION. The Fabrication requirements contained in §704 -03 shall apply. SAMPLING AND TESTING. The Sampling And Testing requirements contained in §704 -03 shall apply. MARKING. The Marking requirements contained in §704 -03 shall apply. FINAL PRODUCTION INSPECTION. The Final Production Inspection requirements contained in §704 -03 shall apply. SHIPPING. The Shipping requirements contained in §704 -03 shall apply. BASIS OF ACCEPTANCE. The Basis Of Acceptance requirements contained in §704 -03 shall apply.
704-99 for Site Manager Use
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 700 STANDARD SPECIFICATIONS (USC) May 1, 202 4 VOLUME 4 704-99 FOR SITE MANAGER USE SECTION 705 - JOINT MATERIALS (Last Revised January, 20 20)
705-01 Preformed Cork Joint Filler
SCOPE. This specification contains the material requirements pertaining to preformed cork joint filler. GENERAL. The Joint Filler shall be of the dimensions shown on the plans or listed in the specifications. Each pi ece shall be plainly marked with the manufacturer's name. MATERIAL REQUIREMENTS. Preformed Cork Joint Filler shall conform to the requirements of ASTM D1752, Type III (Self -expanding Cork). BASIS OF ACCEPTANCE. Acceptance of this material will be based on the manufacturer's certification of compliance with these specification requirements.
705-02 Highway Joint Sealants
SCOPE. This specification covers the material requirements for highway joint sealants. Highway joint sealants are hot -applied joint and crack sealants for use in sealing joints and cracks in Portland Cement Concrete (PCC) and Asphalt pavements. MATERIAL REQUIR EMENTS. Highway joint sealants must meet the following requirements:
705-03 Preformed Rubber Joint Filler
SCOPE. This specification contains the material requirements pertaining to preformed rubber joint filler. GENERAL. The joint filler shall be of the di mensions shown on the plans or in the specifications. MATERIAL REQUIREMENTS. Preformed Rubber Joint Filler shall conform to the requirements of the Standard Specifications for ASTM D1752, Type (Sponge Rubber), except that the use of reclaimed rubber or factice will be permitted.