619-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 SECTION 617 - INVASIVE SPECIES MANAGEMENT
617-1 DESCRIPTION . This work shall consist of the control, eradication and management of invasive
species.
617-2 MATERIALS. As specified in the special specifications.
617-3 CONSTRUCTION DETAILS. As specified in the special specifications.
617-4 METHOD OF MEASUREMENT. As specified in the special specifications.
617-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 618 (VACANT) SECTION 619 - WORK ZONE TRAFFIC CONTROL (Last Revised May , 2023)
619-1 Description
619-1.01 General. Work zone traffic control shall consist of all work necessary to provide for the safe
and efficient movement of traffic through or around work zones, and to protect workers and the public from damage to person and property which may result, directly or indirectly, from any construction work. Work zone traffic control shall be completed under the direction of a trained, competent person, as shown in the contract documents, the MUTCD and as directed by the Engineer. The duration of this work shall be from the date any work is started on the contract site, including mobilization of equipment, signs, offices, and shops until the date of contract final acceptance. Temporary materials and components that are furnished by the Contractor shall remain the property of the Contractor. See Figures 619 -1A and 619 -1B Component Parts of a Typical Highway Work Zone for definitions of terms. Work shall be categorized based on the following work durations:
619-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-1.02 Basic Work Zone Traffic Control. Work shall consist of controlling traffic over a reasonably
smooth traveled way which shall be marked by signs, delineators, channelizing devices, pavement markings, and other devices as shown in the contract documents or as directed by the Engineer. Work after sunset and before sunrise shall include additional requirements for nighttime operations including, but not limited to, a written plan for nighttime operations, additional worker and equipment protection, additional channelizing devices and contract site patrol. The Contractor shall conduct its operations to ensure the safety and convenience of travelers and abutting property owners as well as the safety of all workers on the contract. Travelers include, but may not be limited to motorists, motorcyclists, bicyclists, and pedestrians. Work shall be scheduled to keep the time and distance that existing pavement is removed or substantially disturbed to a minimum and consistent with the physical requirements of the contract. Unless otherwise indicated in the contract documents, the distance over which traffic is maintained on an unpaved surface shall not exceed 1/2 mile at any one time. During seasonal shutdown periods, no part of the highway shall be closed to traffic unless provided for in the contract documents, or the Contractor has submitted , and the Engineer has approved a detailed schedule of operations reflecting a proposal to close the highway to traffic. Basic work zone traffic control shall include the following:
619-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-1 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 L. Flagging and Traffic Control. Work shall consist of furnishing the necessary traffic control equipment and flaggers for adequate traffic control. Portable traffic signal systems authorized by the Engineer may be utilized only on a highway designated as a Restricted Highway.
619-1.03 Basic Work Zone Traffic Control (Daily Operations). Work shall consist of controlling and
protecting traffic during a single work shift as shown in the contract documents, or as directed by the Engineer. The Contractor will not be required to repair or maintain the surface of the traveled way and other roadway features not part of the work, except to repair damage resulting from the Contractor’s operations.
619-1.04 Temporary Business Signs. Work shall consist of furnishing, installing, moving, covering,
maintaining, and removing temporary business signs as shown in the contract documents or as directed by the Engineer.
619-1.05 Covering or Removal of Pavement Markings. Work shall consist of removing or covering
existing permanent pavement markings, interim pavement markings, and temporary pavement markings including, but not limited to: edge lines, lane lines, center lines, crosswalks, stop bars, arrows, symbols, and dia gonal markings in gores and medians as shown in the contract documents or as directed by the Engineer.
619-1.06 Temporary Pavement Markings. Work shall consist of furnishing and applying temporary
pavement markings as shown in the contract documents or as directed by the Engineer. The work for removable pavement tape, removable wet -night reflective tape, temporary overlay markers and removable raised pavement markers shall include removal. Temporary pavement markings are intended for use on any new pavement or milled surface until the subsequent course is placed or interim pavement markings or final pavement markings are installed .
619-1.07 Interim Pavement Markings. Work shall consist of furnishing, applying, and maintaining,
interim pavement markings as shown in the contract documents or as directed by the Engineer. Interim pavement markings are intended for use in diversions, temporary pavement realignments and crossovers, lane shifts and closures, and other traf fic patterns associated with construction activities. Interim pavement markings are intended for use for a given phase or season, for a maximum of 1 year.
619-1.08 Temporary Rumble Strips. Work shall consist of installing, maintaining, and removing
temporary rumble strips at the locations shown in the contract documents or as directed by the Engineer.
619-1.09 Interim Tubular Markers. Work shall consist of furnishing, installing, moving, and
maintaining interim tubular markers attached to the pavement as shown in the contract documents or as directed by the Engineer. Interim tubular markers are typically used for 2 -way, 2 -lane freeway w ork zones and long -term closures where available width is limited.
619-1.10 Portable Variable Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS).
619-1 11
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A. Portable Variable Message Signs (PVMS). Work shall consist of furnishing, installing, operating, maintaining, relocating, and removing PVMS as shown in the contract documents or as directed by the Engineer. PVMS with a pay unit of each shall be provided for the duration of the contract at the general locations specified in the contract documents and in accordance with the Special Note Requirements for Portable Variable Message Signs (PVMS). PVMS with a pay unit of weeks shall be provided at general locat ions and durations in accordance with the Special Note Requirements for Portable Variable Message Signs (PVMS) and the contract documents. PVMS are intended to supplement other traffic control devices by displaying symbolic or word messages but are not to be used alone to replace conventional traffic control devices.
619-1.11 Type III Construction Barricades. Work shall consist of furnishing, installing, moving,
maintaining, and removing Type III construction barricades, with warning lights where specified, as shown in the contract documents or as directed by the Engineer.
619-1.12 Temporary Positive Barrier. Work shall consist of furnishing, installing, moving, maintaining,
and removing approved temporary positive barrier (concrete or steel), including barrier warning lights and transitions to and from guide rail where specified, as shown in the contract documents or as directed by the Engineer.
619-1.13 Temporary Glare Screen. Work shall consist of furnishing, installing, moving, maintaining,
and removing glare screen mounted on a concrete barrier as shown in the contract documents or as directed by the Engineer.
619-1.14 Temporary Impact Attenuator. Work shall consist of furnishing, installing, maintaining,
repairing, moving, and removing temporary impact attenuators as shown in the contract documents or as directed by the Engineer.
619-1.15 Temporary Sand Barrel Arrays. Work shall consist of furnishing, installing, maintaining,
relocating, and removing temporary sand barrel arrays as shown in the contract documents or as directed by the Engineer.
619-1.16 Vehicle Arresting Barrier. Work shall consist of providing vehicle arresting barriers (net -type)
and their anchorages as shown on the Standard Sheets to prevent errant vehicles from entering a closed work area as shown in the contract documents or as directed by the Engineer.
619-1.17 Maintain or Modify Traffic Signal Equipment. Work shall consist of modifying or
maintaining in proper operation, existing, relocated, modified, or newly installed traffic signals as shown in the contract documents or as directed by the Engineer.
619-1.18 Temporary Traffic Signals. Work shall consist of furnishing, installing, moving, maintaining,
and removing temporary traffic signals and necessary components as shown in the contract documents or
619-1 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 as directed by the Engineer. Temporary signals shall be installed only on a highway designated as a Restricted Highway.
619-1.19 Nighttime Operations. Work shall consist of developing a Nighttime Operations and Lighting
Plan; furnishing, installing, operating, maintaining, moving, and removing lighting equipment for nighttime construction operations; constructing devices and adapting equipment to be comp atible with lighting equipment; and furnishing nighttime safety apparel and devices as shown in the contract documents or as directed by the Engineer. Balloon lights, or equivalent lighting, shall be used on nighttime moving operations and are defined as a light source inside a translucent material that produces a low-glare, 360 -degree, diffuse light.
619-1.20 Traffic Control Supervisor. Work shall consist of providing a full -time traffic control
supervisor having adequate training, experience, and authority to implement and maintain all traffic control operations, as shown in the contract documents or as directed by the Engineer.
619-1.21 Temporary Structures and Approaches. Work shall consist of designing, constructing,
maintaining, inspecting, relocating, and removing temporary structures, their approaches and any required appurtenances at the location(s) shown in the contract documents.
619-1.22 Pavement Patching. Work shall consist of providing and installing pavement patching
materials to maintain pavements open to traffic in acceptable condition as shown in the contract documents or as directed by the Engineer.
619-1.23 Mailboxes. Work shall consist of relocating or replacing postal route mailboxes and/or mailbox
supports consistent with U.S. Postal Service requirements, as shown in the contract documents or as directed by the Engineer.
619-1.24 Portable Temporary Rumble Strips. Work shall consist of furnishing, installing, maintaining,
and removing Portable Temporary Rumble Strip (PTRS) Arrays in accordance with the contract documents and as directed by the Engineer.
619-1.25 Automated Flagger Assistance Devices (AFAD). Work shall consist of furnishing, installing,
maintaining, and removing Automated Flagger Assistance Devices (AFAD) in accordance with the contract documents and as directed by the Engineer.
619-1 25
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 FIGURE 619-1A COMPONENT PARTS OF A TYPICAL HIGHWAY WORK ZONE WITH PROTECTIVE VEHICLE
619-1 25
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 FIGURE 619 -1B COMPONENT PARTS OF A TYPICAL HIGHWAY WORK ZONE WITHOUT PROTECTIVE VEHICLE
619-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619.2 MATERIALS.
619-2.01 General. All materials used shall comply with the requirements of the following subsections of
Section 700 Materials and Manufacturing , or as established by this section, the applicable Standard Sheets, and the contract documents. Concrete Grouting and Anchoring Material 701-05 Precast Concrete Barrier 704-05 Epoxy Polysulfide Grout 721-03 Traffic Signal Heads 724-04 Removable Raised Pavement Markers 727-02 Epoxy Paint 727-03 Permanent Pavement Tape 727-04 Glass Beads for Pavement Markings 727-05 Removable Pavement Tape 727-06 Removable Wet-Night Reflective Tape 727-07 Permanent Wet-Night Reflective Tape 727-08 Traffic Paint 727-09 Drums 729-01 Cones 729-02 Temporary Tubular Markers 729-03 Vertical Panels 729-04 Stop/Slow Paddles 729-05 Type III Construction Barricades 729-08 Temporary Sign Supports 729-09 Temporary Impact Attenuators - Redirective 729-10 Temporary Impact Attenuators - Gating 729-11 Truck -Mounted and Trailer Mounted Impact Attenuators 729-12 Temporary Sand Barrels 729-13 Vehicle Arresting Systems 729-14 Arrow Panels 729-15 Portable Variable -Message Signs 729-16 Temporary Glare Screens 729-17 Warning Lights 729-18 Automated Flagging Assistance Devices 729-19 Portable Traffic Signals 729-20 Temporary Overlay Markers 729-21 Truck Mounted Variable Message Signs 729-22 Aluminum Sign Panels 730-01 Temporary Plywood Sign Panels 730-02 Temporary Rigid Lightweight Sign Panels 730-03 Retro -Reflective Sign Sheeting 730-05 Temporary Wooden Sign Posts 730-19 Stiffeners, Overhead Brackets and Miscellaneous Hardware 730-22 Fiberglass Reinforced Plastic Sign Panels 730-23 Type A Sign Supports 730-24 Type B Sign Posts 730-25 Note: Signs and panels supplied before March 1, 2023, may be fabricated with NYSDOT approved ASTM D4956 Type III/IV and/or IX retro -reflective sign sheeting based on the sign type.
619-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-2.02 Basic Work Zone Traffic Control.
619-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 1. TMIAs manufactured after December 31, 2019 shall be Manual for Assessing Safety Hardware (MASH) compliant.
619-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. Rigid Sign Panels. Rigid sign panels shall be aluminum, fiberglass, plywood, or lightweight plastic. All construction sign faces on rigid panels shall conform to §730 -05 Retro -Reflective Sign Sheeting NYSDOT Class A sheeting. Characters including letters, numerals, route shi elds, symbols, logos, and borders shall conform to §645 -2.02 Sign Panels -
619-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 N. Contract Site Patrol . (None Specified)
619-2.03 Basic Work Zone Traffic Control (Daily Operations). (None Specified)
619-2.04 Temporary Business Signs . Temporary business signs shall conform to the MUTCD. Sign
panels shall be in accordance with 619 -2.02H.1. Sign Panels, except that the panels shall be white on a blue background. Supplemental arrows, as required, shall be white on a blue background (M5 -1 to M6 -2). Temporary business signs shall be mounted on temporary sign supports .
619-2.05 Covering or Removal of Pavement Markings . Tape used to cover existing pavement
markings shall be non -reflective, pavement marking masking tape, substantially similar in color to the pavement surface, in accordance with §727 -06 Removable Pavement Tape.
619-2.06 Temporary Pavement Markings . Temporary pavement markings shall consist of removable
raised pavement markers in accordance with §727 -02 Removable Raised Pavement Markers, or removable pavement tape in accordance with §727 -06 Removable Pavement Tape , or removable wet-night reflective tape in accordance with §727 -07 Removable Wet -Night Reflective Tape , or traffic paint in accordance with §727 -09 Traffic Paint and §727 -05 Glass Beads for Pavement Markings, or temporary overlay markers in accordance with §729 -21 Temporary Overlay Markers.
619-2.07 Interim Pavement Markings . Interim pavement markings shall consist of traffic paint in
accordance with §727 -09 Traffic Paint and §727 -05 Glass Beads for Pavement Markings , epoxy paint in accordance with §727 -03 Epoxy Paint and §727 -05 Glass Beads for Pavement Markings , removable pavement tape in accordance with §727 -06 Removable Pavement Tape , removable wet-night reflective tape in accordance with §727 -07 Removable Wet -Night Reflective Tape. Interim pavement markings shall be supplemented, where specified, with removable raised pavement markers in accordance with §727 -02 Removable Raised Pavement Markers.
619-2.08 Temporary Rumble Strips.
619-2 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 F. Removing Temporary Rumble Strips. Rumble strip depressions shall be filled in with a 6.3 or a 9.5 asphalt pavement meeting the requirements of Section 40 4, Asphalt Pavements.
619-2.09 Interim Tubular Markers. Interim tubular markers shall be in accordance with §729 -03
Temporary Tubular Markers .
619-2.10 Portable Variable -Message Signs (PVMS) & Truck Mounted Variable Message Signs
(TMVMS). Portable Variable -Message Signs shall be in accordance with §729 -16 Portable Variable - Message Signs (PVMS) . Truck Mounted Variable Message Signs (TMVMS) shall be in accordance with §729 -22 Truck Mounted Variable Message Signs. When a TMVMS is used as an arrow board, it shall comply with 729-15 Arrow Panels .
619-2.11 Type III Construction Barricades. Type III construction barricades shall be fabricated in
accordance with §729 -08 Type III Construction Barricades . All barricades used at night shall be equipped with warning lights in accordance with §729 -18 Warning Lights .
619-2.12 Temporary Positive Barrier. Temporary positive barrier segments shall be precast concrete
units in accordance with the Standard Sheets or steel or concrete barrier meeting the approved Materials Details of the products on the Department’s Approved List. All temporary positive barrier supplied after January 1, 2015, shall be produced in accordance with the requirements of §704 -05 Precast Concrete Barrier and shall have a legible permanent marking. Temporary positive barrier supplied prior to January 1, 2015, which was not produced in accordance with the requirements of §704 -05 Precast Concrete Barrier, shall be material certified in accordance with specific Standard Sheets or Materials Details used for fabrication. Warning lights for temporary barrier shall be in accordance with §729 -18 Warning Lights. Where warning lights are not required, temporary barrier segments shall be delineated using reflective panels covered with §730 -05 Retro -Reflective Sign Sheeting NYSDO T Class A sheeting, approximately 3 x 6 inch, having a minimum area of 18 square inches. Where warning lights are required, barrier need not be delineated with panels. Reflective pavement marking material applied to the face of the barrier shall not, by itself, be considered acceptable delineation. Where transitions between Temporary Positive Barrier and box beam are required, the box beam shall be in accordance with the requirements of §710 -21 Box Beam Guide Railing and Median Barrier. Where required, the Transition End Pieces shall be precast concrete units in accordance with the Standard Sheets and shall be produced in accordance with the requirements of §704 -05 Precast Concrete Barrier with a legible permanent marking. Where transitions between Temporary Concrete Barrier and Corrugated Beam are required, the corrugated beam shall be in accordance with the requirements of §710 -20 Corrugated Beam Guide Railing and Median Barrier
619-2.13 Temporary Glare Screen. Temporary glare screen shall be in accordance with §729 -17
Temporary Glare Screens .
619-2.14 Temporary Impact Attenuator. Temporary impact attenuators shall be in accordance with
§729 -10 Temporary Impact Attenuators - Redirective or §729 -11 Temporary Impact Attenuators - Gating.
619-2.15 Temporary Sand Barrel Arrays. Temporary sand barrels shall meet the requirements of
§729 -13 Temporary Sand Barrels . Sand fill shall meet the material requirements of §703 -06 Cushion Sand or §733 -15 Sand Backfill . Deicing material shall meet the requirements of §712 -03 Sodium Chloride .
619-2.16 Vehicle Arresting Barrier (VAB). Vehicle arresting barriers shall meet the requirements of
§729 -14 Vehicle Arresting Systems . Portland Cement Concrete used for bases shall be Class A or C, in
619-2 17
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 accordance with §501 Portland Cement Concrete – General, except that requirements for automated batching shall not apply.
619-2.17 Maintain or Modify Traffic Signal Equipment. All traffic signal hardware, including but not
limited to wire, cable, conduit, pull boxes, switch packs, modules and relays, detectors, signal heads, poles, and pedestrian push buttons used to maintain proper operation, shall meet the applicable requirements of §680 Traffic Signals . Materials which will be permanently incorporated into the work shall be in accordance with §680 Traffic Signals .
619-2.18 Temporary Traffic Signals. Equipment for temporary traffic signals shall meet the
requirements of Section §680 Traffic Signals , except that used equipment in good operating condition may be furnished, and for which material certifications are not required. All span wire, inductance -loop wire, shielded lead -in cable, traffic signal cable, and other wire used for temporary traffic signals shall be new material. Portable traffic signals shall be in accordance with §729 -20 Portable Traffic Signals . All other equipment for temporary traffic signals shall meet the requirements of §680 Traffic Signals except for the following modifications:
619-2.19 Nighttime Operations. (None Specified)
619-2.20 Traffic Control Supervisor . (None Specified)
619-2.21 Temporary Structures and Approaches . When specific details and materials are shown in the
contract documents for temporary structures and approaches, substitutions or alterations may be permitted if approved by Deputy Chief Engineer (Structures) (DCES). When specific materials are not shown in the contract documents, the Contractor shall assume all liability and responsibility for certifying that all materials required to complete the work conform to the AASHTO Standard Specifications for Highway Bridges or NYSDOT Load and Resistance Factor Design (LRFD) Bridge Design Specifications or NYSDOT Standard Specification, Construction and Materials, unless otherwise approved by the DCES. If the Contractor proposes to fabricate/construct the temporary structure with used materials, the Contractor shall include with his submittal for the temporary structure, documentation that all primary member material meets the physical properties required by the design. In the absence of record plans, or other valid material certification for the used materials, physical testing shall be performed. The type of physical testing and the results of the testing shall be documented and submitted with the design computations. Excluded from the documentation and testing of physical properties provision are proprietary structures.
619-2 22
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Used material shall not be furnished for fracture -critical members. Mill certifications shall be provided for all fracture critical material. Excluded from these fracture -critical provisions are pedestrian and pre-engineered (fabricated) proprietary structures .
619-2.22 Pavement Patching . In general, asphalt is suitable for all pavement surfaces. During winter
months when asphalt mixture is not available, a bituminous cold-patch material shall be used.
619-2.23 Mailboxes . Materials used shall meet the requirements of the U.S. Postal Service.
619-2.24 Portable Temporary Rumble Strips (PTRS ). PTRS material shall consist of thermoset cast
urethane, engineered polymers, or rubber materials and shall be manufactured for use at temperatures from 0 to 180°F. PTRSs shall be able to withstand vehicles up to 80,000 pounds with minimal dislocation or lateral movement. PTRSs shall be less than one inch in height and consist of a single segment or multiple interlocking sections. Each PTRS shall be capable of being installed without adhesives or bolts. The face of PTRS shall have a non -slip textured surface. PTRS shall be black in color.
619-3 Construction Details
619-3.01 General . The Contractor shall designate a work zone traffic control competent person who has
the primary responsibility and sufficient authority for implementing the work zone traffic control plan and other safety and mobility aspects as necessary. The Contractor’s work zone traffic control competent person shall be appropriately experienced and adequately trained in traffic control operations by recog nized training programs, including the American Traffic Safety Services Association (ATSSA) “Traffic Control Supervisor”, the National Safety Council, unions, or construction industry associations, or by an individual instructor from such a program in acco rdance with the level of decisions that the individual will be required to make, reflecting current industry practices and Department requirements. The Contractor shall generally maintain a traveled way suitable for moving traffic, in accordance with the contract documents and ensure construction equipment, vehicles, and materials are safely stored beyond the clear zone or behind protective barrier du ring non -working hours so as not to constitute a hazard to vehicles, bicycles and pedestrians. Construction operations shall be conducted to ensure a minimum of delay to traffic. Stopping traffic for more than 5 minutes shall not be permitted unless specif ically authorized in the contract documents or in writing by the Engineer. All operations shall be carried out in a manner that provides workers with safe access to the worksite and protects workers, pedestrians, and bicyclists from moving traffic. If the work zone affects the movement of pedestrians, pedestrian access and walkways shall be provided. If the work zone affects an accessible and detectable pedestrian facility, the accessibility and detectability shall be maintained along the alternate pedestri an route. The work zone traffic control competent person shall routinely inspect all work zone traffic control equipment and devices to make sure they are in a safe operating condition in accordance with §619 -3.02N Contract Site Patrol . Unless otherwise noted, temporary items supplied in accordance with this section shall remain the property of the Contractor. Where pedestrians are not prohibited from the street or highway, pedestrian traffic shall be maintained to allow their safe passage as shown in the contract documents. Where sidewalks, walkways, or shoulders must be temporarily closed to facilitate constru ction operations, safe pedestrian passage shall be maintained on at least one side of the roadway at all times, unless other temporary pedestrian accommodations are provided in the contract documents or are approved by the Engineer. Where pedestrian access is prohibited, workers shall not cross or enter travel lanes open to traffic . The requirements in this section refer to posted speed limits. If prevailing or operating speeds for a highway exceed the preconstruction posted limits, the contract documents may direct the Contractor to assume that the preconstruction posted speed limits are different than posted.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-3.02 Basic Work Zone Traffic Control . The Contractor shall control traffic so that a person who has no knowledge of conditions may safely and with a minimum of discomfort and inconvenience ride, drive, or walk, day or night, over all or any portion of the highway and/or structure under constru ction where traffic is to be maintained. The Contractor shall cease operations and restore the traveled way to safe operating condition during any specific periods listed in the contract documents, at such times as traffic renders conditions unsafe to continue work, and during periods of darkness (before sunrise or after sunset), fog, snow or rain, high winds, or other inclement weather that renders conditions unsafe to continue work, for either the traveling public or the workers. The Engineer will determine when traffic or weather conditions ren der work operations unsafe.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 For expressways where the posted speed limit is 45 mph or higher, the Contractor shall not leave milled or grooved pavement for more than 7 calendar days before placement of the next pavement course. The Contractor shall keep the traveled way, sidewalks, and walkways free of construction materials and foreign objects that fall from vehicles or equipment. Materials spilled by, dropped from, or tracked by traffic or by any vehicle used in the Contractor’s operations along or across any public traveled way shall be removed immediately. The Contractor shall keep all surface drainage facilities operative at all times. Positive drainage shall be provided at all times, even during grading operations and periods of accumulated plowed snow, to adequately drain the traveled way and the remainder of the right -of-way areas. Maintaining positive drainage shall include cleaning of drainage grates on roadway pavements. Cleaning of drainage structures and drainage pipes of material not deposited due to the Contractor’s operations will be paid for separately. Repair of drainage structures will be paid for separately. Dust control measures shall be applied to control dust resulting from traffic on unpaved surfaces and from Contractor operations on or adjacent to the roadway. Dust control shall be adequate to prevent dust which hinders driver visibility, or which creates a nuisance condition for property owners and residents adjacent to the contract. Dusty conditions resulting from the Contractor’s operations may be corrected by the use of calcium chloride and/or water. If used, water shall be distributed uniformly using a suitable spray head or spray bar. TABLE 619-1 REQUIRED TREATMENT FOR TRANSVERSE BUMPS Height of Bump (in) Anticipated Exposure Time (Calendar Days) Posted Speed ≤ 45 mph Posted Speed > 45 mph 1 to 6 ≤ 7 6:1 10:1 > 7 15:1 30:1
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 pedestrian facilities, temporary sidewalks or walkways, or alternate paths. Where a sidewalk is closed, it shall be marked with a Type III construction barricade and a SIDEWALK CLOSED (R9 -9) sign. Advance warning signs and directional guidance shall be provided to direct pedestrians to alternate paths and crosswalks and to alert motorists. Where bus service is maintained, the Contractor shall provide suitable areas or locations for the loading and unloading of passengers. Potentially hazardous areas adjacent to sidewalks, walkways, or other areas used by pedestrians shall be protected to prevent pedestrian intrusion in accordance with §107 -05F. Restricted Areas . Open sidewalks and walkways shall be maintained and kept smooth and free from holes, obstructions, and tripping hazards. Surfaces shall consist of pavement, firmly compacted granular material, or other surfaces noted in the contract documents or approved by the Engineer. The width of the temporary facility shall match that of the existing facility where practicable. When it is not possible to meet the minimum width of 5 ft. for the entire length of the facility, a 5 ft. by 5 ft. passing space should be prov ided every 200 ft. Construction materials, vehicles, equipment, debris, temporary sign supports, or other materials shall not be placed or stored on open sidewalks or walkways unless expressly shown in the contract documents or approved by the Engineer. Where bicycles are not prohibited from the highway, adequate accommodations for bicyclists shall be maintained in the travel lanes, on the shoulder, or on alternate paths or facilities.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 pedestrian traffic is maintained, unless a temporary barrier is installed, or other means are used to ensure that vehicles, bicyclists, and pedestrians are not exposed to the unprotected edge of a bridge. During non -work hours when traffic is being maintained on the facility, all temporary ends (free ends) of guide rail, median barrier and bridge rail shall be temporarily terminated and marked with a channelizing drum or object marker equipped with a Type A flashing warning light. Corrugated beam guide rail and median barrier, and heavy -post, blocked -out, corrugated beam guide rail and median barrier shall be temporarily terminated by having the exposed ends (free ends) dropped to the ground and pinned. The approach ends of box beam guide rail, median barrier and bridge rail shall be temporarily terminated with box beam guide rail end assemblies utilizing two splice plates and the proper number of bolts per connection. No posts for anchorages will be required. Special temporary splice plates are required to adapt box beam guide rail end assemblies to box beam median barriers. During any overnight period when existing guide rail or median barrier is temporarily removed, the Contractor shall install channelizing devices in the location where the guide rail or median barrier was removed in accordance with §619 -3.02J.6. Removed Existing Guide Rail or Median Barrier .
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. More Than One Hour Operation. Barrier vehicles used in a stationary operation that occupies a location for more than one hour should be unoccupied . The u noccupied vehicle shall be positioned parallel to traffic, parking brake set, placed in 2nd gear (Manual transmissions /engine off) or Park / Neutral (Automatic transmissions) and have the front wheels aligned with the lane striping and lane to maintain la ne discipline and to stay in lane if struck. ba. One Hour or Less Operation. Barrier vehicles used in a stationary operation that occupies a location for one hour or less shall be occupied . For an occupied vehicle, the operator shall remain in the vehicle with the safety belt and headrest properly adjusted, parking brake set whenever possible, keep the wheels aligned with the lane striping and lane to maintain lane discipline and to stay in lane if struck. cb. Use of Protective Vehicle Light (PVL) as a Barrier Vehicle. The use of a Protective Vehicle Light (PVL) as a Barrier Vehicle(s) is limited to Non -freeway roadways where the posted speed limit is ≤ 40 mph. dc. Use of Protective Vehicle Heavy (PVH) as a Barrier Vehicle. The use of a Protective Vehicle Heavy (PVH) as a Barrier Vehicle(s) is appropriate on all roadway types. A Protective Vehicle Heavy (PVH) shall be used on roadways with a posted speed limit ≥ 45 mph. Barrier vehicles shall be moved, if necessary, as the work progresses. The roll ahead distance (distance a vehicle is located in advance of the first workers or hazard) shall be based on Table
011-04 Roll Ahead Distance for Protective Vehicles as shown on Standard Sheet 619 -011.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 covered or removed when they no longer indicate actual conditions. The Contractor shall provide measures to protect workers during placement and removal of construction signs adequate for the prevailing speed, volume of traffic and roadway geometry where the work is to occur. Such protection may include, but is not limited to, the use of flaggers, spotters, and shadow vehicles equipped with truck -mounted or trailer mounted attenuators. Where pedestrian access is prohibited, workers shall not cross or enter travel lanes open to traffic. All signs shall be kept clean, mounted at the required height on acceptable supports, and installed in the proper position, alignment, and orientation so as to give maximum visibility. Construction signs will be evaluated for acceptability in accordance with the American Traffic Safety Services Association (ATSSA) Quality Guidelines for Work Zone Traffic Control Devices . When auxiliary panels are mounted above or below a warning or regulatory sign, they shall not cover any part of the warning or regulatory sign. Signs shall be placed so that each sign is visible at night, at the desired distance, without being obscured b y another sign, existing features on the highway, or foliage. The faces of stored signs shall not be visible to traffic in any direction, regardless of the orientation of the sign.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 mounting. Rigid sign panels shall have a minimum mounting height of 5 feet, or a minimum mounting height of 7 feet, where pedestrians or parked vehicles are present. For signs incorporating an auxiliary panel below the primary panel, the minimum mounting heights shall be 4 feet and 6 feet, respectively. For pedestrian, regulatory, and guide signs the minimum mounting height shall be 4 feet. Flexible panel and lightweight rigid panel signs shall be mounted at the same height as rigid panel signs, except they may be mounted, when approved by the Engineer, as low as 1 foot when all the following conditions are met:
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 5. Special Use Work Zone Signs. Special use work zone signs shall be installed in accordance with the contract documents. Reduced regulatory speed limits in work zones shall be posted in accordance with contract documents with SPEED LIMIT signs (R2 -1) supplemented with WORK ZONE plaques (G20 - 5aP) of the same width mounted above the speed limit signs. The work zone plaques shall be placed on the same post and as the speed limit signs. REDUCED SPEED LIMIT AHEAD sign(s) (W3-5) shall be posted in advance of the first speed limit sign reducing the speed limit in a work zone. All reduced regulatory speed limit signs shall be installed on both sides of expressways and freeways. When traffic is reduced to a single lane, reduced regulatory speed limit signs should be installed only on the right side of the highway. Reduced regulatory speed limit signs shall be placed within the work zone activity area at a maximum spacing of ½ mile. Reduced regulatory speed limit signs shall be completely covered or removed, and preconstruction posted speed limit signs shall be uncovered or replaced, after a work zone activity area is restored. A work zone plaque shall not be mounted above preconstruction posted speed limit signs within a work zone. The END WORK ZONE SPEED LIMIT signs (R2 -12) or the preconstruction posted speed limit sign (R2 -1) shall be posted 100 ft beyond the end of a work zone activity area having a reduced regulatory speed limit. An END HIGHER FINES sign (R2 -11) shall be placed 200 feet beyond the END WORK ZONE SPEED LIMIT sign. If the regulatory speed is maintained throughout the work activity area, an END ROAD WORK (G20 -2) sign shall be placed a minimum of 80’ and a maximum of 400’ past the end of the downstream taper. For short, intermediate, and long term operations, and where shown in the contract documents, the Contractor shall install BE PREPARED TO STOP (W3 -4) signs to inform oncoming traffic of potential stopped, queued or very slow conditions. Each BE PREPARED TO STOP sign shall be mounted on a temporary sign support. For approaches on expressways and freeways with three lanes or more, both sides of the approach shall be signed unless the median is too narrow to fit the sign and the support. When used for a short or intermediate term operation, the BE PREPARED TO STOP (W3-4) sign shall be placed halfway between the first two advance warning signs. A PVMS may be used to supplement but not replace the required sign. For long term operations, the BE PREPARED TO STOP signs shall be posted approximately ½ mile in advance of the anticipated end of the queue. If the end of the queue is beyond the sign, the sign location shall be adjusted for the subsequent work day until the desired advance warning reflects typical conditions for that location. If the resulting adjustment places the sign in advance of the first warning sign, the Contractor shall also furnish and place a ROAD WORK (W20 -1) sign approximately 1,000 feet in advance of the BE PREPARED TO STOP signs. XX miles is the total expected length of work to be completed within a work day. A supplement distance plaque W7 -3a NEXT XX MILES shall be used with the first advance warning sign when the distance between the advance warning signs and the work area becomes greater than 2 miles as a result of the following situations:
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 G20- 1 sign shall be placed every two miles indicating the distance to the farthest work location.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Channelizing device application is summarized in Table 619 -2A Channelizing Device Application for Short -Term Stationary Work Zones and Table 619 -2B Channelizing Device Application for Intermediate -Term and Long -Term Stationary Work Zones . Where permitted, the Contractor may opt to substitute interim tubular markers or Type III construction barricades for other channelizing devices at no additional cost to the State.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 4. Roadway Intersections and Commercial Driveway Radii. The Contractor shall use drums, or extra tall cones to delineate roadway intersections and commercial driveways. The Contractor may also use standard cones, tall cones, and temporary tubular markers for short term work zones during daylight hours only. The spacing between channelizing devices shall not exceed 6 feet. Reduced spacing near roadway intersections and commercial driveways may be necessary to provide clear guidance. Vertical panels oversized vertical panels, and Type III barricades shall not be used. A non -signalized intersecting roadway shall be delineated by a new series of channelizing devices, and the series will start with one drum equipped with a Type A flashing warning light, placed along the primary roadway after the intersection.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 TABLE 619 -2A CHANNELIZING DEVICE APPLICATION FOR SHORT -TERM STATIONARY WORK ZONES Maximum Device Spacing (center to center) MUTCD compliant Channelizing Device Work Zone Provisions Drums Standard Cones Tall Cones Extra Tall Cones Temporary Tubular Markers Interim Tubular Markers Vertical Panels Oversized Vertical Panels Type III Barricades Short -Term Stationary Work Zones involve daytime work that occupies a location for more than one hour and up to a single daylight period Shoulder/Merging/Shifting Tapers < 40 mph 20 ft. X X X X X X ≥ 40 mph 40 ft. X X X X X X One-Lane Taper for Alternating Two-Way Traffic 20 ft. X X X X X X Longitudinal Lane or Shoulder Closure w/Workers 40 ft. X X X X X X Longitudinal Lane or Shoulder Closure w/No Workers 80 ft. X X X X X X Freeway / Expressway Gores 20 ft. X X X X X X O Marking for Transverse Bumps 1 N/A X2 X2 X2 Transverse Device within Closed Traffic Lane and/or 800 ft X X X X X X O Roadway edge exposed with no Edgeline or Permanent Delineators 200 ft. X X X X X O Roadway Intersection or Commercial Driveway Radii 6 ft. X X X X X Residential Driveway Radii 6 ft X X X X X Removal of existing guide rail Shoulder width ≥ 4 ft. 80 ft. X X X X X X O Shoulder width < 4 ft. 40 ft. Pavement Drop offs > 2 in. and < 24 in. See Table 619-3 Drop off ≥ 24 in. within 10 ft. of active travel way; Posted speed ≤ 45 mph; Drop off Length ≤ 100 ft.; Not to last longer than 1 work shift 20 ft. X X X Closed Roads N/A X Closed Sidewalks N/A X NOTES: X = Allowed Blank = Not Allowed O = Optional at Contractor's expense 1 - A Type 1 Object Marker may be used in lieu of channelizing device 2 - Channelizing devices shall be equipped with a flashing warning light
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 TABLE 619 -2B CHANNELIZING DEVICE APPLICATION FOR INTERMEDIATE -TERM AND LONG -TERM STATIONARY WORK ZONES Maximum Device Spacing (center to center) MUTCD compliant Channelizing Device Work Zone Provisions Drums Standard Cones Tall Cones Extra Tall Cones Temporary Tubular Markers Interim Tubular Markers Vertical Panels Oversized Vertical Panels Type III Barricades Intermediate -term and Long -Term Stationary Work Zones involve work that occupies a location for more than 1 daylight period or nighttime work that occupies a location for more than 1 hour Shoulder/Merging/Shifting Tapers <40 mph 20 ft. X X ≥ 40 mph 40 ft. X X One-Lane Taper for Alternating Two-Way Traffic 20 ft. X X Longitudinal Lane or Shoulder Closure w/Workers 40 ft. X X X X Longitudinal Lane or Shoulder Closure w/No Workers 80 ft. X X X X Freeway / Expressway Gores 20 ft. X X X X O Marking for Transverse Bumps 1 N/A X2 X2 X2 Transverse Device within Closed Traffic Lane and/or 800 X X X X X O Roadway edge exposed with no Edgeline or Permanent Delineators 200 ft. X X X X X O Roadway Intersection or Commercial Driveway Radii 6 ft. X X Residential Driveway Radii 6 ft. X X Removal of existing guide rail shoulder width ≥ 4 80 ft. X X X X X X O shoulder width < 4 40 ft. Pavement Drop offs > 2 in. and < 24 in. See Table 619-3 Drop off ≥ 24 in. within 10 ft. of active travel way; Posted speed ≤45 mph; Drop off Length ≤ 100 ft.; Not to last longer than 1 work shift 20 ft. X X X Two-Lane Two -Way Operations on expressways and freeways at along curves 20 ft. X X O along tangents 40 ft. Two-Lane Two -Way Operations on expressways and freeways between Crossovers 40 ft. X X X X X X Closed Roads N/A X Closed Sidewalks N/A X NOTES: X = Allowed Blank = Not Allowed O = Optional at Contractor's expense 1 - A Type 1 Object Marker may be used in lieu of channelizing device. 2 - Channelizing devices shall be equipped with a flashing warning light.
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 K. Pavement Edge Drop -Off Protection. A drop -off is an abrupt difference in surface elevation of more than 2 inches at approximately 1V:3H or steeper. In the absence of adequate Traffic Control Plans in the contract documents, the Contractor shall submit alternate Traffic Control Plans to the Engineer for approval at least 30 calendar days prior to proposed work which will create a drop -off of over 24 inches within 10 feet from the edge of the traveled way for durations longer than one shift. The Contractor shall provide pavement edge drop -off protection in accordance with Table 619 -3 Pavement Edge Drop -Off Protection. Channelizing devices used to mark drop -offs shall be placed, as practicable, to not reduce the available travel lane width, at the elevation of the open travel lane in order to provide maximum target value and visibility for motorists. A drop -off of greater than 24 inches within 10 feet from the edge of the traveled way to remain at the end of the work shift shall be separated from traffic with temporary or permanent barrier. For posted speed limit of 45 mph and less, a drop -off of great er than 24 inches within 10 feet from the edge of the traveled way that is 100 feet or less in length will be allowed with channelizing devices consisting of drums, extra tall cones, or oversized vertical panels only at a maximum spacing of 20 feet for sho rt durations not to exceed one work shift. Unless otherwise noted in the contract documents, the Contractor shall begin work to eliminate unprotected drop -offs created by contract work within 7 calendar days of the completion of the work creating the drop -off. Work shall continue in a timely manner until such time as the unprotected drop - off condition is eliminated. Where pavement edge lines are not provided, channelizing devices shall be preceded by a NO SHOULDER (W8 -23) sign, repeated at all ramps and roadway intersections. Signs shall be repeated every ½ mile and supplemented with a NEXT [X] MILES (W7 -3aP) plaque w here applicable. Where pavement edge lines are provided, channelizing devices shall be preceded by SHOULDER DROP -OFF (W8 -17) signs, repeated at all ramps and roadway intersections. Signing shall be repeated every ½ mile and supplemented with NEXT [X] MILES (W7 -3aP) plaque where applicable. TABLE 619 -3 PAVEMENT EDGE DROP -OFF PROTECTION Drop -Off Height Edge Line Pavement Markings Drum Spacing (feet) Vertical Panel Spacing (feet) Tubular Marker Spacing (feet) Tall Cone Spacing (feet) Signs DROP -OFF AT OR WITHIN SHOULDER AREA Within 4 ft. from Travel Lane 2 – 6 in. Yes 100 100 N/A N/A Shoulder Drop -off No 40 40 N/A N/A No Shoulder 6 - 24 in. Yes 40 40 N/A N/A Shoulder Drop -off No 20 20 N/A N/A No Shoulder More than 4 ft. from Travel Lane 2 – 6 in. Yes 200 200 100 100 Shoulder Drop -off No 100 100 40 40 No Shoulder
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 6 - 24 in. Yes 40 40 N/A N/A Shoulder Drop -off No 40 40 N/A N/A No Shoulder DROP -OFF OUTSIDE OF SHOULDER EDGE Shoulder width ≤ 4 ft. 2 – 6 in. Yes 100 100 N/A N/A Shoulder Drop -off No 100 100 N/A N/A No Shoulder 6 - 24 in. Yes 40 40 N/A N/A Shoulder Drop -off No 40 40 N/A N/A No Shoulder Shoulder width > 4 ft. 2 – 6 in. Yes 200 200 100 100 Shoulder Drop -off No 100 100 40 40 No Shoulder 6 - 24 in. Yes 100 100 40 40 Shoulder Drop -off No 40 40 N/A N/A No Shoulder
619-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 equipped with an emergency air horn to alert workers of errant vehicles or other dangerous situations. Where flaggers are not within sight of each other, each flagger shall be equipped with a communication device, such as portable phone or two -way radio. T he communication device shall only be used to communicate with other flaggers, other workers, or supervisor(s) regarding the flagging operations. Where the distance between flaggers is more than ½ mile or where shown in the contract documents, the Contract or shall use pilot cars to lead lines of vehicles through the work zone. The standard signaling device for flagging operations, where one or more flaggers are controlling a single stream of traffic or two alternating streams of traffic in opposite directions, shall be STOP/SLOW signal paddles. Red signal flags may be used where display of the STOP and SLOW faces in opposite directions may be inappropriate or misleading.
619-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A minimum of 7 calendar days prior to initial deployment of the AFAD system, the Contractor shall submit a traffic control plan to the Engineer, for review and approval, detailing AFAD operation including a list of competent flaggers trained to operate the AFAD. AFADs shall be used only on two -lane two -way or single lane one -way roadways. AFADs shall not be used where there are intersections and/or commercial driveways or where construction operations within the controlled highway segment frequently disrupt traffic flow. Appropriate flagger apparel and equipment shall be maintained near each AFAD to facilitate flagging in the event of a malfunction or operational need due to frequent disruptions of traffic flow. The Contractor shall immediately provide traff ic control with flaggers if a AFAD malfunctions; fails to properly or adequately control traffic; creates congestion, queues or gridlock which cannot be remedied by timely on -site adjustments to the signal operation; or is otherwise inadequate. A competent flagger, who has been trained on the operation of the AFAD, shall operate and not leave the AFAD(s) unattended at any time. The flagger shall have an unobstructed view of the AFAD(s) and approaching traffic in both directions at all times. The distance between AFADs shall not exceed ½ mile. Work zones utilizing AFADs shall comply with Standard Sheet 619-309. Red/Yellow lens AFAD shall have a STOP HERE ON RED (R10 -6) sign installed on the right - hand shoulder at least 8 ft in advance of the AFAD wh ere vehicles are expected to stop. A portable traffic signal may be used, at the Contractor’s option, as an AFAD. A Signal Ahead symbol (W3 -3) sign shall replace the BE PREPARED TO STOP sign. An 18 inch wide removable stop line with a STOP HERE ON RED (R10 -6) sign shall be installed at inte nded stopping point. The Engineer may waive the requirement for a stop line if the roadway is unpaved or it is otherwise impractical to install a stop line and the STOP HERE ON RED sign is in place. When the work no longer necessitates use of the AFAD or portable traffic signal, the units shall be removed or turned off and moved out of view from the traveled way. Specified AFAD’s may be replaced with human flaggers for a time period of no longer than 24 hours.
619-3.03 Basic Work Zone Traffic Control (Daily Operations). The Contractor shall control traffic in
accordance with §619 -3.02 Basic Work Zone Traffic Control paragraphs A. Surface Condition; C. Maintain Public Access; D. Maintain Existing Roadside Signs; F. Construction Vehicles; G. Barrier/Shadow Vehicles; H. Construction Signs; I. Arrow Panels; J. Channelizing Devices; L. Flagging;
619-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 obstructions including traffic control devices, construction equipment, and materials at the end of each work shift.
619-3.04 Temporary Business Signs. The Contractor shall provide temporary business signs (NYI8 -4)
mounted on temporary sign supports to identify business entrances in accordance with the contract documents. Entrances shall be identified by only a single sign. Temporary business signs shall be mounted at a minimum height of 7 feet, and at a location that will guide traffic seeking access to the business, but where they will not interfere with traffic flow or other traffic control devices.
619-3.05 Covering or Removal of Pavement Markings. The Contractor shall remove or cover existing
permanent pavement markings, interim pavement markings and temporary pavement markings, as indicated in the contract documents or directed by the Engineer, to accommodate traffic pattern changes by covering the mar kings with preformed removable pavement marking masking tape, or by removing the markings. Masking tape shall be placed in blocks to prevent the underlying shape of pavement marking symbols or letters from being confused with existing markings.
619-3.06 Temporary Pavement Markings. The Contractor shall install and maintain temporary
pavement markings in accordance with the contract documents, using patterns and colors shown in the MUTCD to establish temporary traffic pattern(s) during construction on any pavement, including milled or grooved surface, resurfaced, new pavement, or other paved surface without pavement markings, for a maximum of 14 calendar days. Within 14 calendar days after placement, the Contractor shall either (1) install the succeeding pavement course or (2) install the remaining temporary pavement markings including edge lines, stop bars, and simple crosswalks, with no hatching. Pavements whi ch will be open to traffic shall be properly
619-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 marked before being opened, before nightfall, or before the end of the work day, whichever is soonest, except areas that are open during the work shift and delineated with channelizing devices or flaggers. Traffic paint need not be removed before placing a subsequent course. Removable pavement tape, removable wet -night reflective tape, temporary overlay markers and removable raised pavement markers shall be removed before placing a subsequent course at no ad ditional cost to the State. Temporary pavement marking stripes shall be a minimum of 4 inches in width. Temporary pavement markings shall be applied to a clean, dry pavement in accordance with the manufacturer’s recommendations. Hatch lines and symbols will not be required as tempora ry pavement markings unless required by the contract documents. Traffic paint pavement markings shall be applied at a minimum wet film thickness of 20 mil, immediately followed by an application of glass beads, at a rate of 6 lb/gal of paint. Where specified, removable raised pavement markers shall be used to supplement line pavement markings. The raised markers shall not be a substitute for line pavement markings, letters, or symbols. Removable raised pavement markers spaced every 5 feet may be used to supplement line pavement markings. Two removable raised pavement markers spaced at each end of the 2 foot marking may be used to supplement a 2 foot broken line pavement marking. If unanticipated weather or other conditions prevent the application of temporary pavement markings, the Contractor shall apply 2 foot removable pavement tape markings or temporary overlay markers at 40 foot spaces at no additional cost to the State, for a maximum of 3 days until such time as temporary pavement markings may be applied, or the next pavement course is installed.
619-3.07 Interim Pavement Markings. Work shall consist of furnishing, applying, and maintaining
interim pavement markings as shown in the contract documents or as directed by the Engineer. The work for removable tape, removable wet -night reflective tape, temporary overlay markers and removable raised
619-3 08
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 pavement markers shall include removal. Interim pavement markings are intended for use in diversions, temporary pavement realignments and crossovers, lane shifts and closures, and other traffic patterns associated with construction activities. Interim pave ment markings are intended for use for a given phase or season, for a maximum of 1 year.
619-3.08 Temporary Rumble Strips. The Contractor shall install temporary rumble strips in three sets
of 6-strip patterns with 10 foot between individual strips. The type of strip installed will be at the Contractor’s option, except that sawcut or milled -in strips shall not be installed on new top course surfaces or existing surfaces that will not be paved over. Where there is no usable shoulder, or the shoulder is less than 3 feet wide, the rumble strips s hould be ended 3 feet short of the edge of usable pavement. On curbed roadways, rumble strips should end a minimum of 3 feet from the curb in order not to interfere with drainage. Rumble strips shall typically be placed in advance of each of the last three long-term advance warning signs such that drivers are alerted in time to see and read the signs. Rumble strips will typically be installed for a minimum of one week.
619-3 09
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3.09 Interim Tubular Markers. The Contractor shall install interim tubular markers in accordance
with the contract documents. The Contractor shall attach interim tubular markers to the pavement in a manner that prevents them from being moved or dislodged by traffic. Interim tubular mar kers shall be installed on pavement that has been cleaned to remove pavement markings, oil, dirt, or other debris or substances that may interfere with a proper bond. Attachment to the pavement shall be by mechanical faste ner or by adhesive, in accordance with the manufacturer’s recommendations. Bonding agents shall be of sufficient amount or size to ensure proper bonding of the base to the pavement. Interim tubular markers removed or damaged by the Contractor’s operations or by traffic shall be replaced immediately, so that positive separation is maintained between opposing lanes of traffic at all times. Damaged reflective sheeting on interim tubular markers shall be replaced before nightfall as necessary to maintain adequate visibility of the markers. In cases where only isolated individual markers
619-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 are lost or damaged, and adequate visibility is maintained by the remaining markers, replacement will not be required until more than 3 consecutive markers, or 25 percent of all markers within ½ mile have been damaged or lost. The replacement of markers da maged or lost by traffic, where the Contractor has demonstrated reasonable effort to collect the costs from the person(s) responsible for damage will be considered extra work.
619-3.10 Portable Variable Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS). The Contractor shall provide, operate, and maintain PVMS & TMVMS as indicated in the contract documents until the progress of work no longer requires their use. The Contractor shall relocate or reorient PVMS with a pay unit of each, if necessary, up to 4 t imes per year as conditions dictate, at no additional cost to the State. The Contractor shall provide, operate, and maintain PVMS with a pay unit of weeks at the general locations and duration stated in the contract documents and in accordance with the Special Note Requirements for Portable Variable Message Signs (PVMS). There shall be no extra payment due for each relocation or reorientation of TMVMS. On the P VMS & TMVMS, the message to be displayed shall be as required by the contract documents and may change on a daily basis or more frequently as conditions dictate. NYSDOT’s Variable Message Sign Guidelines shall be reviewed to ensure compliance with Chapter 5 - Messages. If the contract requires a NTCIP compliant PVMS, the Contractor shall provide the Engineer with the model, manufacture date and manufacturer of the NTCIP compliant PVMS the Contractor plans to use from the Approved List. After delivery to the work site, th e Contractor shall allow the Regional Transportation Management Center (TMC) to conduct operations and communications tests on one or more samples supplied by the Contractor. The testing will determine if the proposed PVMS meets the TMC’s operational requi rements by demonstrating remote communications to and from the TMC using NTCIP compliant operating software. TMVMS do not require NTCIP compliant communications. The message to be displayed shall be as required by the contract documents or as directed by t he Engineer. PVMS specified with cellular communications shall be equipped with control software compatible with the current computer operating system used in the Engineer’s Field Office. PVMS with Cellular Communications Option shall have cellular telephone service pr ovided by the Contractor. The Contractor shall supply the Engineer with two copies of operating instructions for the PVMS and the control software. The Contractor shall supply the Engineer with a copy of control software a minimum of 14 calendar days prior to installation of the first unit. Electronic copies of software instructions are acceptable. PVMS shall be placed so that the base of the message panel is at least 7 feet above the adjacent pavement surface and aligned to provide optimum viewing by approaching motorists. The Contractor shall supply the Engineer with an accurate log of the text of all messages and times messages were displayed monthly, not later than the 15th of the following month. The log of messages may be either a listing in a manual register or printouts from the control software. The Contractor shall inform the Engineer of PVM S and TMVMS locations and update as they are relocated and removed. The PVMS shall be protected from unauthorized use. All cabinet doors shall be secured and/or padlocked, and default manufacturer’s passwords shall be changed. Additional security measures shall be implemented as needed.
619-3.11 Type III Construction Barricades. Type III construction barricades shall be installed at all
locations where a highway, bridge, ramp, or other segment of the roadway is closed to traffic. Type III construction barricades shall be maintained upright, in proper alignment and orientation. If ballast is used to maintain alignment and position of the barricade, it shall consist of dry sand contained in a closed waterproof bag and shall be placed at ground level. Barricade rails shall be oriented such that the stripes slope downward toward the side on which traffic is to pass. If traffic may pass to either side, adjacent barricades shall be arranged such that the stripes slope downward toward each side starting at the center. Where no passage is intended or permitted, the stripes shall slope downward toward the center of the barricade or barricades.
619-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 At night, each Type III construction barricade used to close a roadway, a segment of a roadway or a sidewalk shall be equipped with one flashing warning light.
619-3.12 Temporary Positive Barrier. Temporary Positive Barriers are categorized by their standard
MASH TL -3 (pickup truck) deflection and their deflection reduction measures (pinning and or box -beam - stiffening). The barriers that satisfy a given deflection category are shown on the Departme nt’s Approved List for Temporary Positive Barriers. The system chosen and the segment length used must be capable of meeting the curvatures indicated in the Plans. The Engineer will inspect temporary barrier segments upon delivery. Any barrier segment having damage and/or defects in the segment and/or joint connections will be rejected if the performance of the barrier may be affected. Temporary positive barrier segments shall be fastened together to form a continuous string. When joined together, the barrier segments shall form a smooth and continuous barrier. Any segments damaged or misaligned shall be corrected or replaced. The connec tions shall conform to the approved details for the particular barrier. Tapered end sections shall not be used in traversable medians, gores, or other areas where impacts on a tapered end section could allow vehicles to penetrate opposing or adjacent lanes of traffic. Where the posted speed limit is 45 mph or higher, a tempora ry impact attenuator or temporary sand barrel array shall be provided on approach ends of temporary positive barrier when the offset from the edge of the traveled way to end of the barrier is less than 12 feet and will be paid for separately. Where space is available, approach ends of the barrier string shall be flared away from the traveled way at the taper rate shown in Table 619 -4 Flare Rates for Positive Barrier and terminated in a tapered end section, embedded in a slope, or otherwise prot ected against impact by errant vehicles. The Contractor shall install temporary barrier where indicated, and of the deflection Category indicated in the contract documents. Where pinning is indicated for the given barrier, the pinning shall be in conformance with the pinning requirements indicate d in the Approved List. Where pins extend above the top surface of the barrier anchor recess, they shall be covered with plastic or rubber. TABLE 619-4 FLARE RATES FOR TEMPORARY POSITIVE BARRIER POSTED PRECONSTRUCTION SPEED LIMIT (mph) 30 40 50 55 65 TEMPORARY POSITIVE BARRIER 8:1 11:1 14:1 16:1 20:1 BOX BEAM OR HEAVY POST CORRUGATED BEAM 7:1 9:1 11:1 12:1 15:1 TABLE 619-5 GUIDE RAIL AND NYSDOT TEMPORARY CONCRETE BARRIER STANDARD** DEFLECTION DISTANCES BARRIER TYPE POST SPACING (ft) DEFLECTION DISTANCE (ft) CABLE GUIDE RAIL 16 11.0* 12 9.5* 8 8.0* 4 7.0* CORRUGATED W -BEAM (WEAK POST) GUIDE RAIL 12.5 8.0 6.25 6.0 4.16 5.0 CORRUGATED W -BEAM (HEAVY POST BLOCKED OUT) 6.25 4.0 3.12 2.0 BOX BEAM GUIDE RAIL 6.0 5.0 3.0 4.0 CORRUGATED W -BEAM 12.5 7.0
619-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 (WEAK POST) MEDIAN BARRIER 6.25 5.0 CORRUGATED W -BEAM (HEAVY POST) MEDIAN BARRIER 6.25 2.0 BOX BEAM MEDIAN BARRIER 6.0 3.0 NYSDOT TEMPORARY CONCRETE BARRIER Unpinned 3.25** Box-Beam -Stiffened 2.2** Pinned 0.8** * Note: NCHRP 350 Standard Deflection caused by a 4,400 -lb test vehicle traveling 62 mph impacting the barrier at a 25° angle **Note: Standard Deflections are those assumed to occur with a Standard TL-3 Impact. MASH Standard Impact is produced by a 5,000 -lb test pickup traveling 62 mph impacting the barrier at a 25° angle. The temporary concrete barrier stiffened with box beam shall be installed at least 50 feet prior to, be continuous through, and extend at least 50 feet beyond the area requiring limited deflection, wherever practicable. Where space limits extending the string of barrier stiffened with box beam, one segment at either end of the string shall be pinned with 4 pins on the construction, or non -traffic, side. At any transition between pinned and unpinned portions of a temporary positive barrier run, to provide a gradual change in fixity, one piece of barrier shall be partially pinned using 2 pins on the construction side of the barrier. The partially pinned pi ece shall be included in the measurement of pinned barrier. Pins shall have the following minimum embedment lengths: • Bridge Decks and Cement Concrete Pavement 5 in. • Flexible Pavement 18 in. • Unpaved Areas 30 in. After removal of the barrier, pin holes created in the surface shall be filled, unless that area will be further disturbed. Holes in flexible pavement shall be filled with warm or cold mix top course asphalt material rodded in 3” lifts. Holes in portland cement concrete pavement or structural decks shall be filled with material meeting the requirements of §701 -05 Concrete Grout Material or §721 -03 Epoxy Polysulfide Grout . Holes in unpaved area shall be filled with sand backfill.
619-3 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 All warning lights shall be kept clean, properly aligned, and in operating condition. Batteries shall be replaced as necessary. Where channelizing devices with Type A flashing warning lights are not provided immediately preceding a run of barrier to be marked with warning lights, the first warning light on that run of barrier shall be a Type A warning light.
619-3 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Standard Sheets or shall provide an overlap of corrugated beam extending upstream past four segments of the downstream end of the Temporary Concrete Barrier. When corrugated beam is required to be bolted to the Temporary Concrete Barrier, or the Contractor elects to do so, the necessary positions for the bolts shall be located on the Temporary Concrete Barrier and drilled in the field. The terminal rail piec es or W -Beam End Pieces thus bolted shall be removed and become the Contractor’s property when the Temporary Concrete Barrier is removed. After removal of the Temporary Concrete Barrier, any rail and posts removed to facilitate placement of the Temporary C oncrete Barrier transition shall be promptly replaced with new posts and new or acceptable reset corrugated beam guide rail
619-3.13 Temporary Glare Screen. Temporary glare screen shall be installed in accordance with the
manufacturer’s instructions. All components of the glare screen shall be maintained in a safe and functional condition. Damaged components shall be repaired or replaced. If blades are utilized, the blades shall be spaced and angled to provide approximately a 22E headlight cutoff angle. The screen shall not overhang the face of the barrier and shall not cover delineation or lights. The screen shall be kept plumb and properl y positioned on the barrier, with reflectorization securely affixed to the screen. Cleaning of the reflectorization shall be by a method that does not damage the paddles, reflectorization or barrier, and is not hazardous to traffic. The Contractor shall remove and dispose of the temporary glare screen upon completion of the contract or when it is no longer required. Upon removal of the temporary glare screen, there shall be no protrusions remaining on the top face of the barrier. Bolt holes or other damage to permanent barrier from glare screen installation shall be repaired by the Contractor at no additional cost to the State.
619-3.14 Temporary Impact Attenuator. The Contractor shall install temporary impact attenuators in
accordance with the contract documents, the manufacturer’s instructions, and materials details. The Contractor shall provide the Engineer a copy of the manufacturer’s materials details and instal lation instructions a minimum of 7 calendar days prior to use, to allow verification of the attenuator supplied and proper installation. The selection of the manufacturer and model of temporary impact attenuator shall be at the Contractor’s option, provided the attenuator supplied is of the type indicated, gating or redirective; shields the hazard; and fits in the location without encroachment into travel lanes or required offsets. The Contractor shall maintain temporary impact attenuators for continuous operation. If an attenuator is out of operation, the Contractor shall immediately mark the hazard with drums, vertical panels and or extra tall cones until repairs are made or a new attenuator is installed. The Contractor shall promptly begin repairs to damaged attenuators, and shall complete repairs to a damaged attenuator or mitigate the hazard within 1 work day. Attenuators damaged beyond repair shall be replaced within 3 work days . When temporary impact attenuators are removed or moved to another location, the Contractor shall restore the location to match the surrounding area.
619-3.15 Temporary Sand Barrel Arrays. The Contractor shall install sand barrel arrays in accordance
with the patterns shown on the Standard Sheet or a NCHRP 350 approved pattern and fill the barrels with sand to provide the desired module weight, plus or minus 5 percent. Units that will be in use between November 1 and March 31 shall have sodium chloride, as dry rock salt, equal to 3% - 5% by weight of the sand, thoroughly mixed into the sand to prevent fr eezing. The sand shall be placed in the modules loose, not in bags or sacks. If the contract documents indicate that the site necessitates securing of the modules, the work shall be performed as recommended by the manufacturer. The Contractor shall maintain sand barrel arrays for continuous 24 hour operation. If an array is out of operation, the Contractor shall immediately mark the hazard with drums, vertical panels and or extra tall cones until repairs are made or new module(s) are installed. The Contractor shall promptly begin
619-3 16
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 repairs to damaged arrays, and shall complete repairs to a damaged array or mitigate the hazard within one work day.
619-3.16 Vehicle Arresting Barrier (VAB). Vehicle arresting barriers (VAB) shall be installed in
accordance with the contract documents and the manufacturer's instructions and materials details. The Contractor shall provide the Engineer a copy of the manufacturer’s materials details and installation instructions a minimum of 5 work days prior to use, to allow verification of the barrier supplied and proper insta llation. The deceleration area behind the VAB shall be kept clear of workers, vehicles, or stored materials. The Contractor shall provide for periodic surveillance of each VAB by workers or by electronic device. The Contractor shall maintain vehicle arresting barrier for continuous operation. If a barrier is out of operation, the entire barrier shall be restored within 4 hours after the incident, or prior to the next shift the barrier will be used. No work may be progressed in an unprotected area, and the hazard shall be eliminated or minimized, until restorations have been completed. The VAB, except anchorages, shall be dismantled and removed prior to reopening the road to traffic. After the last day of use, if directed by the Engineer, temporary anchorages shall be removed, and disturbed areas shall be restored to match the surroundin g area.
619-3.17 Maintain or Modify Traffic Signal Equipment. Traffic signals shall be maintained in proper
operation, including the maintenance of all features of the traffic signal operation in effect and operating at the time any work begins on the contract. Traffic -actuated phases shall remain actuated, and signa ls operating within signal systems shall remain coordinated with the remainder of the system unless otherwise approved by the Engineer. Except for emergencies, no changes in the signal operation or timi ng shall be made without prior approval by the Engineer. If emergency conditions dictate a change in the operation, the Engineer shall be notified by the start of the next work day. Unless otherwise approved by the Engineer, an altered signal operation mus t be returned to the original signal operation within 24 hours. The Contractor shall maintain in operation all equipment including signal heads, supports, cable, wiring, span -wire-mounted signing, controllers, master controllers, detector systems, conflict and current monitors, relays, switch packs, and all other acces sory and necessary equipment. Maintenance shall also include the repair and replacement of existing detector loops, paid for separately. The Contractor shall have capable traffic signal repair personnel on call 24 hours a day, seven days a week, and shall provide to the Engineer a single telephone number for contacting them. If for any reason a signal is not functioning properly, the Contra ctor shall commence work on the signal within 2 hours of notification. If directed by the Engineer, the Contractor shall notify the appropriate police agency for traffic control operations. If the police agency cannot or will not provide traffic control, t he Contractor shall provide flaggers at locations specified by the Engineer within the 2 -hour time period. The Contractor shall continue the flagger services until the signal is in proper operation. A flagger warning (W20 -7 or W20 -7a) sign shall be used on all approaches to an intersection controlled by flaggers. If the malfunction is in the equipment supplied by the State, due to an area wide power outage, or due to a localized power outage beyond the Contractor’s control, the Contractor shall notify the Engineer and, if directed by the Engineer, provide flaggers until the malfunction is corrected or State personnel take over. Such flagging operations in excess of 4 hours for the first call and for any subsequent call will be considered extra work. The Contractor shall provide the Engineer, on a monthly basis, with a record of all maintenance calls received and responded to, as well as a record of all corrective action taken by the Contractor.
619-3 18
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3.18 Temporary Traffic Signals. The Contractor shall install temporary traffic signals in
accordance with the contract documents and the MUTCD. The Contractor shall maintain traffic signal systems, including traffic detectors, in proper operation until approved removal, and be responsibl e for its continuous 24 -hour operation except for reasonable shutdown during relocation and transfer operations. Substitution of temporary traffic signals for flaggers shall be at no additional cost to the State. If for any reason a signal does not function as required, the Contractor shall commence repair work on this signal within 2 hours after notification of a malfunction. In the event flashing operation occurs, all signal faces shall show flashing red indicati ons. Flashing operation of a signal is considered a malfunction. The Contractor shall provide an adequate number of flaggers to control traffic at each malfunctioning traffic signal, in accordance with '619 -3.02L. Flagging and Traffic Control until the sig nal is restored to proper operation. If the malfunction is due to an area wide power outage or due to a localized power outage beyond the Contractor’s control, the Contractor shall notify the Engineer and, if directed by the Engineer, provide flaggers until the malfunction is corrected or Sta te personnel take over. Flagging operations in excess of 4 hours for the first maintenance call shall be paid for as extra work.
619-3.19 Nighttime Operations . Work occurring after sunset and before sunrise will be considered
nighttime operations. A nighttime operations meeting shall be held prior to the start of any nighttime operations. For static and moving operations, the Contractor shall implement a lighting plan and provide illumination throughout the work areas. For moving operations, the Contractor shall mount lighting to construction equipment that consists of balloon lights, or equivalent lighting that illuminates the work area with low glare for oncoming traffic and enhances visibility of the equipment from al l directions. The Contractor should maintain traffic in a single lane during nighttime moving operations on freeways.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 All workers involved in nighttime operations shall wear protective helmets and nighttime apparel in accordance with §107 -05A. High Visibility Apparel at all times. All signs, Stop/Slow paddles, and red flags used to warn/alert/control traffic shall be retr oreflective. Flaggers shall use a flashlight with red glow cone/ red LED baton for flagging in non -illuminated flagger stations during nighttime operations. Where the Contractor implements a mobile lighting plan, PPE shall meet ANSI Class 3. The Contractor shall equip workers on foot with a personal active safety system which enhances the visibility of the worker from all directions, such as a powered hardhat light ring or an illuminated safety vest. ANSI Class E gaiters or pants are required to meet ANSI Class 3 if ANSI Class 2 vests are used. The Contractor shall provide the Department with the same personal active safety systems and ANSI Class 3 garments for Department inspectors and pertinent field office staff. When workers on foot are passing between illuminated work areas, the Contractor shall provide personal headlamps or flashlights producing a minimum of 5 foot -candles at the ground to navigate their p ath if hardhat light rings do not provide this function and illumination. Vehicles operating on the pavement of a closed roadway or travel lane shall display rotating amber beacons or flashing LED beacons at all times. Vehicles using headlights, except for rollers and vehicles retrieving channelizing devices, shall travel facing in the same direction as adjacent traffic in order to avoid glare and confusion to drivers. The Contractor shall meet the following additional requirements for work zone traffic control during nighttime operations.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 8. Means to ensure visibility of personnel and equipment involved with the set -up and removal of work zone traffic control devices.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 directions, to sufficiently illuminate the work area, enhance visibility of the equipment from all directions, and to carry out the work safely and accurately: all rollers, pavers, milling machines, material transfer vehicles, crack and seat equipment, and other miscellaneous equipment utilized for the moving operation that could be a hazard if not illuminated. There shall be a minimum of one balloon light mounted to each piece of equipment. Pavers and large milling machines should be equipped with a minimu m of two balloon lights. Mechanical sweepers shall have forward -facing lights and tack trucks shall have rearward - facing lights, consisting of balloon lights, or equivalent low glare lighting visible from all directions, supplemented with flood lights as r equired. Balloon lighting, or equivalent, equipment shall be sufficiently ballasted and durable to withstand the anticipated weather conditions and vibrations from the host equipment.
619-3 19
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 a. Illumination for moving operations . Equipment -mounted balloon lights, or equivalent low glare lighting visible from all directions, shall provide illumination to a minimum of 5 foot - candles measured at the work surface for 20 feet from the equipment on sides where workers generally work. Bal loon lights or equivalent lighting shall be located to optimally illuminate the work area and enhance equipment visibility, mounted at a minimum height of 10 feet above the ground, and temporarily relocated as necessa ry to not interfere with overhead obstructions. Other types of equipment -mounted light sources shall be used as supplemental illumination around the equipment, where necessary, to carry out the work safely and adequately. The hopper, auger, and screed area s of pavers shall be uniformly illuminated. The operator’s controls on all machines shall be illuminated. Tack shall be illuminated as it is applied. In areas throughout the entire zone of mobile operations without existing roadway lighting, light towers shall be located at maximum intervals of 500 feet. The Contractor shall provide illumination to a minimum of 5 foot-candles at locations where miscellaneous or incidental tasks, such as saw cutting, are performed. The illumination shall be accomplished via floodlights or balloon lights (or equivalent) mounted to a truck, cart, or terrain vehicle, tow behind trailer lights, lights on light stands, or other suitable means. No tasks shall be performed without adequate illumination. The Contractor shall furnish adequate illumination for Department construction inspection and quality assurance. The illumination shall be accomplished via floodlights or balloon lights (or equivalent) mounted to a truck, cart, or terrain vehicle, tow behi nd trailer lights, lights on light stands, or other suitable means. The Contractor shall furnish and maintain illumination equipment. The Contractor shall provide a minimum of 10 foot -candles in locations where the Department’s representatives will perform tasks such as core drilling, density testing, and concrete testing.
619-3 20
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-3.20 Traffic Control Supervisor. When indicated in the contract documents, the Contractor shall
provide a dedicated traffic control supervisor having adequate training, experience, and authority to implement and maintain all traffic control operations. The traffic control supervisor shall not be assigned other duties that interfere with performance as a traffic control supervisor. The traffic control supervisor shall be adequately trained in traffic control operations by recognized training programs, including the American Traffic Safety Services Association “Traffic Control Supervisor”, the National Safety Council, unions, or const ruction industry associations, or by an individual instructor from such a program. Traffic control supervisors not competent to the satisfaction of the Engineer shall be replaced immediately. During setup and removal of lane closures and other traffic control setups, the traffic control supervisor shall be assisted by additional workers as necessary. The traffic control supervisor shall patrol the contract area to ensure that conditions on the site are adequate for public safety and convenience at all times, to monitor worker safety from intrusions into the work area, and to ensure that the work adheres to the provisions for work zone traffic control. The traffic control supervisor shall ensure signs, channelizing devices, barricades, barrier, impact attenuators and other traffic control devices are adjusted and maintained as necessary. The Contractor shall provide workers to install, maintain, adjust, and remove traffic control devices as requir ed by the work operations. When the work does not require closure of an active lane, roadway, or ramp; when no construction operations occur within 30 feet of active traffic lanes; and when there is no delivery of materials or equipment; the Engineer may waive the requirements for a traffic control supervisor.
619-3.21 Temporary Structures and Approaches. The Contractor shall design, construct, maintain,
relocate, and remove temporary structures and their approaches at the location(s) shown in and in accordance with the contract documents. The Contractor shall install temporary structures and their approach es, including any required earth support structures and any necessary appurtenances, in a manner and sequence that interference with and inconvenience to the traveling public and abutting properties is kept to a minimum. The Contractor shall be responsible for the workmanship, upkeep, and safety of all temporary structures and approaches.
619-3 21
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 When specific details are not included in the contract documents, or when the Contractor receives approval to deviate from the contract documents, the Contractor shall design all elements of the temporary structure and approaches including the railing syst em, on the structure and its approaches. The design of temporary structures and their approaches shall be in conformance with the NYSDOT Load and Resistance Factor Design (LRFD) Bridge Design Specifications, the only design live load shall be HL -93, in addition to any anticipated construction or pedestrian loading. Alternatively, the design shall be in conformance with the NYSDOT Standard Specifications for Highway Bridges, the minimum design live load shall be AASHTO HS 20. Exception, any structure, and approaches that are expected to be in servi ce for more than 5 years, shall be designed as a permanent structure in accordance with the NYSDOT Load and Resistance Factor Design (LRFD) Bridge Design Specifications. The bridge rail shall be designed for loads commensurate with those specified for TL -2 unless a higher level is shown in the project plans. The Contractor shall also be responsible for designing, furnishing, and installing the transition from bridge rail t o highway rail for the temporary structure. All design computations and associated working drawings shall bear the stamp and signature of a Professional Engineer and shall be submitted to the DCES for review. Design for non -highway temporary bridges shall be in accordance with AASHTO specifications for the design codes, loading, railing/barrier, ADA requirements and vertical clearance it is intended to serve or as specified in the project plans. All fabrication and construction of a temporary structure shall conform to the AASHTO Standard Specifications for Highway Bridges, Division II or the AASHTO LRFD Bridge Construction Specifications, except as modified herein. Fabrication shall be performed by a fabricator that is certified by AISC for the type of work being performed. For fracture -critical member (FCM) work, the fabricator shall also have an FCM endorsement through AISC. The Contractor shall notify the DCES of the fabrication schedule at lea st 21 calendar days prior to commencement of any non -pre-engineered proprietary shop fabrication. All welding required for the fabrication of temporary steel structures shall be performed in accordance with the provisions of the NYS Steel Construction Manual. The Contractor is responsible for furnishing and installing any stone fill slope protection in accordance with Section 620 used to guard against erosion and/or scour of the end slopes and all temporary substructures. The type of the fill slope protection shall be as shown in the contract plans and paid under Item 619.05nn. If the bridge connects sidewalk at each end of the bridge, payment for all approach sidewalk and earthwork necessary to connect the temporary structure with the existing sidewalk system shall be as shown in the contract plans and paid under Item 619.05nn. Load rating calculations for the temporary structure shall bear the stamp and signature of a professional Engineer and shall be submitted to the DCES for review. Load ratings shall be computed using the Load Factor Design (LFD) or Allowable Stress Design (ASD) methodology. The Inventory and Operation load ratings shall be based on an AASHTO HS -20 live loading. Additionally, if the structure was designed using the NYSDOT LRFD Bridge Design Specifications, the load ratings shall also be computed by the Load a nd Resistance Factor Rating (LRFR) method. LRFR ratings shall be provided at the Inventory and Operating levels as rating factors of the AASHTO HL -93 live load. All Load Ratings shall be calculated in accordance with AASHTO’s The Manual for Bridge Evaluation . Prior to beginning construction of any temporary structure designed by the Contractor, the Contractor shall submit detailed plans and calculations to the DCES for review and approval in accordance with §585 -3.03 Working Drawings . The review by the DCES, does not and shall not relieve the Contractor of the responsibility for the adequacy and design of the temporary structures and approaches. Prior to opening a temporary structure to traffic, the structure shall be inspected by a Professional Engineer who shall certify in writing to the Engineer that the structure was constructed in accordance with the design. The Contractor shall have the temporary structure inspected, under the direction of a Professional Engineer, by a person familiar with bridge construction at least once a month. On or before each anniversary of the opening of a temporary structure that has been open to traffic for
619-3 22
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 one year or more, the structure shall be inspected by a Professional Engineer, who shall certify in writing that:
619-3.22 Pavement Patching. The Contractor shall place paving materials suitable to provide temporary
pavement patches on paved surfaces where vehicular, bicycle or pedestrian traffic is to be maintained, including the traveled way, shoulders, sidewalks, and other paved surfaces damaged by traffic or environmental factors and not by Contractor operations. During periods of active work on the contract, the C ontractor shall complete needed patches on a daily basis. During periods of winter shutdown, the Engineer will inspect the pavement on frequent and regular intervals and will notify the Contractor of areas to be patched. The Contractor shall install paveme nt patching, at locations identified by the Engineer, within 24 hours of notification. The Contractor shall place pavement patches to provide a relatively smooth, uniform driving surface suitable for safe travel at the posted speed limit. Pavement patches shall be placed to repair surface irregularities including, but not limited to, holes, depressions, cracks, and uneven joints. Areas to be patched shall be adequately cleaned and tack -coated if necessary, and patching material shall be thoroughly compacted by hand or by roller.
619-3.23 Mailboxes. In the event the original mounting post has been lost, damaged, is unusable, or is
not consistent with U.S. Postal Service requirements, the Contractor shall furnish and install a new mounting post and/or mailbox with mounting post at the designated locati on and at the proper height in accordance with the requirements of the U.S. Postal Service. The replacement mailbox shall be of a similar or larger size than the original. Where the mailbox will be placed over a guide rail and/or ot her location where the postal patron will have easiest access to the rear of the mailbox, the replacement mailbox shall be one having a door on each end.
619-4 Method of Measurement
619-4.01 General . (None Specified.)
619-4.02 Basic Work Zone Traffic Control . The work under basic work zone traffic control will be
measured for payment on a lump sum basis.
619-4.03 Basic Work Zone Traffic Control (Daily Operations). The work under basic work zone traffic
control (daily operations) will be measured for payment on a lump sum basis.
619-4.04 Temporary Business Signs. The quantity to be measured for payment will be in square feet to
the nearest 0.1 square feet of business signs installed.
619-4 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3
619-4.05 Covering or Removal of Pavement Markings . The quantity to be measured for payment will
be in feet to the nearest whole foot along the centerline of the pavement stripes covered or removed. No measurement will be made for the gaps between broken and dotted line segments. If preformed tape is used to cover an existing line, payment will be based on the width of the line covered. Measurement for covering or removal of striping with a width greater than 4 inches will be made by the following method: Width of Striping (in) x Number of Feet 4 (in) Letters and symbols will be measured by each unit covered or removed. A unit will consist of one letter or one symbol except that a double -headed arrow will be measured as two units and triple headed arrow will be measured as three units. Example: "SCHOOL" would be measured as six units. Each R in a railroad crossing marking will be measured as a single unit, but the "X" will be measured by the number of feet of 4 inch stripe.
619-4.06 Temporary Pavement Markings . The quantity to be measured for payment will be in feet to the
nearest whole foot along the centerline of the pavement stripes installed, and will be based on a 4 inch wide stripe. No measurement will be made for the length of skips in the dashed line. M easurement for installation of striping with a width greater than 4 inches will be made by the following method: Width of Striping (in) x Number of Feet 4 (in)
619-4.07 Interim Pavement Markings . The quantity to be measured for payment will be in feet to the
nearest whole foot along the centerline of the pavement stripes installed, and will be based on a 4 inch wide stripe. No measurement will be made for the length of skips in the dashed line. Measurement for installation of striping with a width greater than 4 inches will be made by the following method: Width of Striping (in) x Number of Feet 4 (in) Letters and symbols will be measured by each unit installed. A unit will consist of one letter or one symbol except that a double -headed arrow will be measured as two units and triple headed arrow will be measured as three units. Example: “SCHOOL” would be measured as six units. Each R in a railroad crossing marking will be measured as a single unit, but the “X” will be measured by the number of feet of 4 inch stripe.
619-4.08 Temporary Rumble Strips . The quantity to be measured for payment will be in feet to the nearest
whole foot of individual temporary rumble strip installed, measured transverse to the direction of traffic flow.
619-4.09 Interim Tubular Markers . The quantity to be measured for payment will be the number of
interim tubular markers installed.
619-4.10 Portable Variable -Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS). The quantity of PVMS or TMVMS with a pay unit of each to be measured for payment will be the number of signs provided. The quantity of PVMS or TMVMS with a pay unit of weeks to be measured for payment will be in weeks to the nearest whole week.
619-4.11 Type III Construction Barricades . The quantity to be measured for payment will be the number
of barricade units installed.
619-4 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-4.12 Temporary Positive Barrier . . The quantity to be measured for payment of temporary positive barrier will be in feet to the nearest foot along the centerline of temporary positive barrier installed. The quantity to be measured for payment of Box Beam to Flared Temporary Concrete Barrier Transition will be the number of such transitions installed. The quantity to be measured for payment of Box Beam to Unflared Temporary Concrete Barrier Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Face to Box Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Back to Box Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of Corrugated Beam to Flared Temporary Concrete Barrier Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Face to Corrugated Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of Temporary Concrete Barrier Back to Corrugated Beam Transition will be the number of such transitions installed. The quantity to be measured for payment of temporary positive barrier will be in feet to the nearest foot along the centerline of temporary positive barrier installed .
619-4.13 Temporary Glare Screen . The quantity to be measured for payment will be in feet to the nearest
whole foot along the length of the temporary glare screen installed.
619-4.14 Temporary Impact Attenuator . The quantity to be measured for payment will be the number of
temporary impact attenuators installed.
619-4.15 Temporary Sand Barrel Arrays . The quantity to be measured for payment will be the number
of individual sand barrel modules installed.
619-4.16 Vehicle Arresting Barrier . The quantity to be measured for payment will be the number of
barriers installed.
619-4.17 Maintain or Modify Traffic Signal Equipment . The quantity of signalized intersections
maintained to be measured for payment will be in months to the nearest 1/4 month. The quantity of traffic signal equipment modified to be measured for payment will be on an each location basis.
619-4.18 Temporary Traffic Signals . The work under temporary traffic signals will be measured for
payment on an each location basis.
619-4.19 Nighttime Operations . The work under nighttime operations will be measured for payment on a
lump sum basis.
619-4.20 Traffic Control Supervisor . The work under traffic control supervisor will be measured for
payment on a monthly basis to the nearest 1/4 month.
619-4.21 Temporary Structures and Approaches . The work performed under temporary structures and
approaches will be measured for payment on a lump sum basis.
619-4.22 Pavement Patching . The work under Pavement Patching, Winter will be measured for payment
on a Dollars -Cents basis.
619-4 23
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619-4.23 Mailboxes. The quantity to be measured for payment will be the number of mailboxes installed in accordance with the contract documents or as directed by the Engineer. Mailboxes installed for the Contractor’s convenience or due to damage during the contract period wi ll not be compensated for.
619-4.24 Portable Temporary Rumble Strips (PTRS). PTRS arrays will be measured by Device -Day.
When measured by Device -Day the quantity will be the number of devices (PTRS arrays) used each calendar day which are satisfactorily furnished, installed, maintained, and operated at each work zone location. If P TRS arrays are utilized at more than one work zone location on the same day, the total number of PTRS array -days measured for payment will be the total number of PTRS arrays setup on that day. For the purpose of this specification, one Device -Day is defined as one PTRS array, set up and in use in a calendar day exceeding one hour. Two Device -Days is one PTRS array over two days or two PTRS arrays used on one day. A PTRS array relocated within th e same work zone on the same day or same shift will count as one PTRS array.
619-4.25 Automated Flagger Assistance Devices (AFAD). The quantity measured for payment will be
the number of AFAD’s used each day which are satisfactorily furnished, installed, maintained, and operated at each work zone location. If AFAD’s are operated at more than one work zone location on the same day, the total number of AFAD -days measured for payment will be the total number of AFAD setup on that day, however no additional payment will be made for AFAD’s relocated within the same work zone on the same day. Work shifts spanning over two consecutive calendar days will be considered to occur on the “same day”. For the purpose of this specification, one AFAD -Day is defined as two AFAD’s, set up and in use for a portion of a day exceeding one hour.
619-5 Basis of Payment
619-5.01 General. The price bid shall include all labor, materials, and equipment necessary to complete
the work. No payment will be made for damage caused by vehicle accidents, vandalism, or any other similar causes.
619-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 C. Major Non -Conformance. Where major non -conformance with the requirements of this specification is noted by the Engineer, and prompt Contractor compliance is deemed not to be obtainable, the Engineer may stop contract work. Where major non -conformance with the requirements of this specification is noted by the Engineer, and the Contractor fails to correct deficiencies for a period of 24 hours, the Department may correct the adverse conditions by any means deemed appropriate a nd will deduct the cost of the corrective work from any monies due the Contractor. The cost of this corrective work will be in addition to the non - payment for basic work zone traffic control, non -payment of any other items of work under this section and li quidated damages assessed.
619-5.02 Basic Work Zone Traffic Control . The lump sum price bid for basic work zone traffic control
shall include all labor, materials, and equipment necessary to complete the work. Construction signs; arrow panels; warning lights on signs, barricades, and channelizing devices; the cost of temp orarily terminating guide rail, median barrier, or bridge rail during non -work hours; work required to maintain drainage facilities during construction operations; and dust control shall be included in the lump sum p rice bid for basic work zone traffic control. Removal of debris from drainage features that was present at the time of contract award shall be paid for separately. Progress payments will be made at 10 percent of the lump sum price when the initial construction sign installation is complete, as determined by the Engineer, and an additional 10 percent of the lump sum price bid when 10 percent of the contract work, excl uding basic work zone traffic control, contingency items, and mobilization, has been completed. The remaining 80 percent will be paid in subsequent contract payments, in proportion to the amount of other contract work completed, less any non -payment for de ficient work zone traffic control. If the contract completion date is extended, no additional payment will be made for basic work zone traffic control.
619-5.03 Basic Work Zone Traffic Control (Daily Operations). The lump sum price bid for basic work
zone traffic control (daily operations) shall include all labor, materials, and equipment necessary to complete the work. Construction signs; arrow panels; warning lights on signs, barricades, and channelizing devices ; and the cost of temporarily terminating guide rail, median barrier, or bridge rail during non -work hours; shall be included in the lump sum price bid for basic work zone traffic control (daily o perations). Progress payments will be made at 10 percent of the lump sum price when the initial construction sign installation is complete, as determined by the Engineer, and an additional 10 percent of the lump sum price bid when 10 percent of the contract work, excl uding basic work zone traffic control, contingency items, and mobilization, has been completed. The remaining 80 percent will be paid in subsequent contract payments, in proportion to the amount of other contract work completed, less any non -payment for de ficient work zone traffic control. If the contract completion date is extended, no additional payment will be made for basic work zone traffic control.
619-5.04 Business Signs. The unit price bid for temporary business signs shall include the cost of labor,
materials, and equipment necessary to complete the work, including sign supports.
619-5.05 Covering or Removal of Pavement Markings. The unit price bid for the covering or removal
of pavement markings shall include the cost of all labor, materials, and equipment necessary to complete the work, including the costs of any repairs or replacement of damaged pavement or existing pavement markings resulting from pavement marking removal operations.
619-5.06 Temporary Pavement Markings. The unit price bid for temporary pavement markings shall
include the cost of furnishing all labor, materials, and equipment necessary to complete the work. Payment shall be provided each time temporary pavement markings are first applied on a pavement course in accordance with the contract requirements.
619-5 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 No additional payment shall be provided for the installation of construction signs, temporary delineators, and channelizing devices necessitated by the Contractor’s failure to place temporary pavement markings before the pavement is opened to traffic, or f or temporary roadside pavement channelization, until edge lines are placed. No additional payment shall be provided for markings required because the Contractor failed to place the next pavement course or the final pavement markings within 14 calendar days.
619-5.07 Interim Pavement Markings . The unit price bid for interim pavement markings shall include
the cost of furnishing all labor, materials, and equipment necessary to complete the work. The work to remove traffic paint or epoxy paint will be paid for separately.
619-5.08 Temporary Rumble Strips . The unit price bid for temporary rumble strips shall include the cost
of all labor, materials, and equipment necessary to complete the work. Payment will include the cost of pavement cleaning, asphalt concrete, and other materials used to form or fill in the rumble strips and tack coat. On multiyear contracts where it is desired to have rumble strips in place for more than one construction season, the rumble strips will be paid for separately each year they are installed.
619-5.09 Interim Tubular Markers. The unit price bid for interim tubular markers shall include the cost
of furnishing all labor, materials, and equipment necessary to complete the work, including removal and the cost of replacing damaged markers. Interim tubular markers that are in satisf actory condition may be relocated. When interim tubular markers are relocated, payment will be made for another interim tubular marker.
619-5.10 Portable Variable -Message Signs (PVMS) and Truck Mounted Variable Message Signs
(TMVMS). The unit price bid for PVMS or TMVMS shall include the cost of all labor, materials, testing and equipment necessary to complete the work, including cellular telephone service initial start -up and monthly charges for the cellular communications option. Th e TMVMS does not require cellular communications service. Progress payments for PVMS or TMVMS with a pay unit of each will be made for 90 percent of the unit price bid when each unit has been satisfactorily installed and is operational at the first location. The remaining 10 percent will be paid upon removal.
619-5.11 Type III Construction Barricades. The unit price bid for Type III construction barricades shall
include all labor, materials, and equipment necessary to complete the work, including lighting when required. When barricades are relocated or the diagonal stripes are changed to allow traffic to pass on the other side of the barricade, additional payment will be made for another barricade. Movements of the barricade from one side of the roadway to the other side, movements within 100 feet of the initial location, or daily replacement to approximately the same location, not requiring any change in the diagonal stripes, will not be considered as relocation, and will not be paid for as additional barricades. No payment will be made for Type III construction barricades used at the option of the Contractor in lieu of channelizing devices.
619-5.12 Temporary Positive Barrier. The unit price bid for temporary positive barrier shall include all
labor, materials, and equipment necessary to satisfactorily complete the work, including any required connection devices, end treatments, end section pinning, temporary delineation and rep air of pavement after removal of temporary positive barrier. Temporary impact attenuators, if required, will be paid for separately. When temporary positive barriers are relocated, except movements necessary to maintain, realign, or replace damaged units and daily relocat ion of segments to allow access to the work area which are restored at the end of the work shift, additional payment for the relocation will be made for additional length of temporary concrete barrier.
619-5 12
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The unit price bid for temporary positive barrier – Category X shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including pinning. The unit price bid for warning lights on temporary positive barrier with shall include the cost of furnishing all labor, materials, equipment, and electrical power necessary to complete the work. Should a barrier that is equipped with warning lights be moved to a new location where temporary concrete barrier with warning lights is required, payment will be made for additional warning lights on temporary positive barrier. The unit price bid for Box Beam to Flared Temporary Concrete Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of exi sting rail; placement and removal of the temporary berm; seeding of the disturbed area; and replacement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. The unit price bid for Box Beam to Unflared Temporary Concrete Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of e xisting rail: furnishing of Transition End Pieces, rub rail heavy posts and blockouts; and replacement of rail with holes in its face. The unit price bid for Temporary Concrete Barrier Face to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of exist ing rail and furnishing of box beam tapered end piece. The unit price bid for Temporary Concrete Barrier Back to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to complete the work, including removal and replacement or resetting of existing rail and re placement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. The unit price bid for Corrugated Beam to Flared Temporary Concrete Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of existing rail; placement and removal of the temporary berm; seeding of the disturbed a rea; and furnishing and removal of terminal rail section. No separate payment will be made for corrugated beam used to provide an overlap. The unit price bid for Temporary Concrete Barrier Face to Corrugated Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting o f existing rail and furnishing and removal of W beam end piece. The unit price bid for Temporary Concrete Barrier Back to Corrugated Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to complete the work, including removal and replacement or resetting of existing rail and furnishing and removal of terminal rail section. No separate payment will be made for corrugated beam used to provide an overlap. Progress payments will be made at the unit price bid for 90 percent of the quantity, after placement and demonstration of satisfactory operation. The remaining 10 percent will be paid upon removal. No payment will be made for temporary concrete barrier installed at the Contractor’s option, required solely due to a delay caused by the Contractor’s operations, or installed to protect pavement edge drop -offs, unless required in the contract documents. The unit price bid for temporary positive barrier shall include all labor, materials, and equipment necessary to satisfactorily complete the work, including any required connection devices, end treatments, end section pinning, temporary delineation and rep air of pavement after removal of temporary positive barrier. Temporary impact attenuators, if required, will be paid for separately. When temporary positive barriers are relocated, except movements necessary to maintain, realign, or replace damaged units a nd daily relocation of segments to allow access to the work area which are restored at the end of the work shift, additional payment will be made for additional length of temporary positive barrier. The unit price bid for pinned temporary positive barrier shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including pinning.
619-5 13
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The unit price bid for temporary positive barrier stiffened with box beam shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including the box beam. The unit price bid for temporary positive barrier with warning lights shall include the cost of furnishing all labor, materials, equipment, and electrical power necessary to complete the work. Should a barrier that is equipped with warning lights be moved to a new location where temporary positive barrier with warning lights is required, payment will be made for additional length of temporary positive barrier with warning lights. The unit price bid for Box Beam to Flared Temporary Positive Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of existi ng rail: placement and removal of the temporary berm; seeding of the disturbed area; and replacement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. The unit price bid for Box Beam to Unflared Temporary positive Barrier Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of exis ting rail: furnishing of Transition End Pieces, rub rail heavy posts and blockouts; and replacement of rail with holes in its face. The unit price bid for Temporary Positive Barrier Face to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work, including removal and replacement or resetting of existing rail and furnishing of box beam tapered end piece. The unit price bid for Temporary Positive Barrier Back to Box Beam Transition shall include the cost of furnishing all labor, materials, and equipment necessary to complete the work, including removal and replacement or resetting of existing rail and repla cement of rail with holes in its face. No separate payment will be made for box beam used to provide an overlap. Progress payments will be made at the unit price bid for 90 percent of the quantity, after placement and demonstration of satisfactory operation. The remaining 10 percent will be paid upon removal. No payment will be made for temporary positive barrier ins talled at the Contractor’s option, required solely due to a delay caused by the Contractor’s operations, or installed to protect pavement edge drop -offs, unless required in the contract documents.
619-5.13 Temporary Glare Screen . The unit price bid for temporary glare screen shall include all labor,
materials, and equipment necessary to complete the work. When glare screens are relocated, except movements necessary to maintain, realign, or replace damaged units and daily relocation of temporary positive barrier segments with glare screen attached to allow access to the work area which are restored at the end of the work shift, additional payment will be made for the length of glare screen relocated. No payment will be made for repair or replacement of damaged components.
619-5.14 Temporary Impact Attenuator. The unit price bid shall include the cost of all labor, materials,
and equipment necessary to complete the work, including the connection to temporary or existing barrier, the back -up system, the pad, if indicated, and any excavation or backfill. When atte nuators are relocated, payment will be made for a new temporary impact attenuator, except minor movements within a site, such as movements to maintain, realign, or adjust an attenuator. No payment will be made to repai r, restore or replace an attenuator damaged by public traffic or by the Contractor’s operations. Progress payments will be made based on the unit price bid as follows: 90 percent when the attenuator is adequately installed and operational; the remaining 10 percent will be paid upon removal .
619-5.15 Temporary Sand Barrel Arrays. The unit price bid for temporary sand barrel arrays shall
include the cost of all labor, materials and equipment necessary to complete the work, including the cost of the sand fill and salt additive. Replacement of individual modules damaged by public tra ffic will be paid for at the unit price bid for each temporary sand barrel. Relocation of barrels to a new location will be paid for as a new installation.
619-5 16
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Progress payments will be made based on the unit price bid as follows: 90 percent when the barrels are adequately installed and operational; the remaining 10 percent will be paid upon removal.
619-5.16 Vehicle Arresting Barrier . The unit price bid for vehicle arresting barrier shall include the cost
of all labor, materials, and equipment necessary to complete the work. No payment will be made to repair, restore, or replace an attenuator damaged by public traffic or by the Contra ctor’s operations.
619-5.17 Maintain or Modify Traffic Signal Equipment. The unit price bid for maintaining traffic signal
equipment shall include the cost of all labor, materials, and equipment necessary to perform the work, with the exception of inductance loop replacement, if necessary, which will be paid for separately. Th e cost of the electric power shall be the responsibility of the original maintaining agency. No payment will be made during any period for which the Contractor has been granted an extension of time with engineering charges. The unit price bid for modifying traffic signal equipment per location shall include the cost of all labor, materials, and equipment necessary to perform the work.
619-5.18 Temporary Traffic Signals . The unit price bid for temporary traffic signals per location shall
include the cost of all labor, materials, and equipment necessary to complete the work, including the cost of electric power necessary to operate the signal until its removal is approved or directed by the Engineer. A location may be an intersection, a work zone with two or more signal faces interconnected and operating together, or other limits as defined in the contract documents. Portable or temporary traffic signals used at the Contractor’s option in lieu of flaggers shall be included in the lump sum price bid for basic work zone traffic control. Progress payments will be made at 50 percent of the unit price bid for each location after installation and demonstration of satisfactory operation. The remaining 50 percent will be paid in progress payments per week of temporary traffic signal provided. T he amount of such weekly payment will be determined by dividing 50 percent of the unit price bid by the number of weeks the temporary traffic signal is to remain in operation, as shown on the approved progress schedule.
619-5.19 Nighttime Operations . The lump sum price bid for portable lighting shall include all labor,
materials, and equipment necessary to complete the work, including the cost to adapt equipment and provide power to light sources. Progress payments will be made based on the lump sum price bid as follows: 20 percent when the Nighttime Operations and Lighting Plan has been accepted and satisfactory lighting of nighttime operations has begun; the remaining 80 percent will be paid in progress payments per week of nighttime operations completed. The amount of such weekly payment will be determined by dividing 80 percent of the lump sum amount bid by the number of weeks of nighttime operations in the approved Nighttime Operations and Lighting Plan.
619-5.20 Traffic Control Supervisor . The unit price bid for traffic control supervisor shall include the
cost of furnishing all labor, materials, equipment, training, and direct supervision necessary to provide and support the activities of a traffic control supervisor.
619-5.21 Temporary Structures and Approaches . The lump sum price bid for temporary structures and
approaches shall include the cost of all labor, materials, and equipment necessary to complete the work including design preparation, submittals, and inspection of the structure. Progress payments will be made at the unit price bid for 90 percent of the quantity after the temporary structures and approaches are complete and operable. The remaining 10 percent will be paid upon removal.
619-5.22 Pavement Patching . Payment shall include the cost of furnishing all labor, materials, and
equipment necessary to patch pavement during periods of winter shutdown when work on the contract is inactive, or when asphalt material is not available, including mobilization of wor k crews and work zone
619-5 23
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 traffic control. The cost of all work associated with providing and installing suitable pavement patching materials to maintain pavements open to traffic in acceptable condition when work on the contract is active, or when asphalt material is available, wi ll be paid under an asphalt sidewalk item if that item is in the contract, or alternatively, under a top course paving item, regardless of the material actually used. Payment for winter patching will be based on force account records submitted to the Engin eer, plus 10% overhead and 10% profit in accordance with §109 -05.
619-5.23 Mailboxes . The unit price bid for mailboxes shall include all labor, materials, and equipment
necessary to complete the work. Only one payment for each mailbox will be made regardless of the number of times it is moved or replaced and shall be made when the mailbox has been placed in its final location. Where multiple mailboxes are installed on a single post, payment will be based upon the number of individual mailboxes so installed.
619-5.24 Portable Temporary Rumble Strips (PTRS). The price bid shall include the cost of furnishing
all labor, materials, and equipment necessary to satisfactorily complete the work. Pavement cleaning, if necessary, shall be included.
619-5.25 Automated Flagger Assistance Devices (AFAD). The unit price bid shall include the cost of all
labor, materials, and equipment necessary to satisfactorily complete the work. The cost of advance warning signs shall be included in the unit bid price for Item 619.01 – Basic Work Zone Traffic Control. Payment will be made under: Item No. Item Pay Unit 619.01 Basic Work Zone Traffic Control Lump Sum 619.0101 Basic Work Zone Traffic Control (Daily Operations) Lump Sum 619.04 Type III Construction Barricades Each 619.05nn Temporary Structures and Approaches Lump Sum 619.0701 Temporary Business Signs Square Feet 619.0801xx Remove Pavement Marking Stripes Feet 619.0802xx Remove Pavement Marking Letters or Symbols Each xx = Material 01 = Traffic Paint, 02 = Epoxy Paint, 06 = Permanent Pavement Tape 619.0803 Cover Existing Pavement Marking Stripes (Removable Tape) Feet 619.0804 Cover Existing Pavement Marking Letters or Symbols (Removable Tape) Each 619.09xx Temporary Pavement Markings, Stripes Feet xx = Material 01= Traffic Paint, 03= Removable Tape, 04= Removable Wet Reflective Tape 619.1001xx Interim Pavement Markings, Stripes Feet 619.1002xx Interim Pavement Markings, Symbols Each 619.1003xx Interim Pavement Markings, Letters Each xx = Material 01= Traffic Paint, 02= Epoxy Paint, 03= Removable Tape,
619-5 25
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 04= Removable Wet Reflective Tape, 05= Traffic Paint Supplemented with Raised Markers 619.1105XY Portable Variable Message Sign (PVMS) Standard size – Full Matrix (LED) Each 619.1106XY Portable Variable Message Sign (PVMS) Standard size – Full Matrix (LED) Week 619.1107XY Portable Variable Message Sign (PVMS) Large size - Full Matrix (LED) Each 619.1108XY Portable Variable Message Sign (PVMS) Large size - Full Matrix (LED) Week 619.1109XY Portable Variable Message Sign (PVMS) Small size - Full Matrix (LED) Each 619.1110XY Portable Variable Message Sign (PVMS) Small size - Full Matrix (LED) Week 619.1111XY Portable Variable Message Sign (PVMS) Standard size – Line or character matrix (LED) Each 619.1112XY Portable Variable Message Sign (PVMS) Standard size – Line or character matrix (LED) Week XY = Options X= Equipment Options Y= Cellular Communication Options 1 = No optional equipment specified 1 = No Cellular Communications required 2= Radar 2 = Cellular Communications 3= CCTV Camera 3 = Cellular Communication with NTCIP compliance 4= Radar & CCTV Camera 619.1113 Truck Mounted Variable Message Signs (TMVMS) Each 619.1114 Truck Mounted Variable Message Signs (TMVMS) Week 619.12 Temporary Glare Screen Feet 619.13nn Temporary Traffic Signals Each Location 619.14 Automated Flagger Assistance Device (AFAD) DVDY 619.1611 Maintain Traffic Signal Equipment (Requirement A) Intersection Month 619.1612 Maintain Traffic Signal Equipment (Requirement B) Intersection Month 619.1613 Maintain Traffic Signal Equipment (Requirement C) Intersection Month 619.1614nn Modify Existing Traffic Signal Equipment (Temporary) Each Location 619.1711 Temporary Positive Barrier – Category 1 (Pinning Prohibited) Feet 619.1712 Temporary Positive Barrier – Category 2 (Pinning Permitted) Feet 619.1713 Temporary Positive Barrier – Category 3 (Pinning Prohibited) Feet 619.1714 Temporary Positive Barrier – Category 4 (Pinning Permitted) Feet 619.1715 Temporary Positive Barrier – Category 5 (Pinning Prohibited) Feet 619.1716 Temporary Positive Barrier – Category 6 (Pinning Required) Feet 619.1717 Temporary Positive Barrier – Category 7 (Pinning and Box -Beam -Stiffening Required) Feet 619.1719 Warning Lights on Temporary Positive Barriers Each 619.1720 Box Beam to Flared Temporary Concrete Barrier Transition Each 619.1721 Box Beam to Unflared Temporary Concrete Barrier Transition Each 619.1722 Temporary Concrete Barrier Face to Box Beam Transition Each 619.1723 Temporary Concrete Barrier Back to Box Beam Transition Each 619.1724 Corrugated Beam to Flared Temporary Concrete Barrier Transition Each 619.1725 Temporary Concrete Barrier Face to Corrugated Beam Transition Each 619.1726 Temporary Concrete Barrier Back to Corrugated Beam Transition Each
620-1 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 619.1802 Temporary Impact Attenuator - Redirective (Test Level 2) Each 619.1803 Temporary Impact Attenuator - Redirective (Test Level 3) Each 619.1812 Temporary Impact Attenuator - Gating (Test Level 2) Each 619.1813 Temporary Impact Attenuator - Gating (Test Level 3) Each 619.20 Interim Tubular Markers Each 619.21 Temporary Sand Barrel Module Each 619.22 Temporary Rumble Strips Feet 619.2202 Portable Temporary Rumble Strips DVDY 619.23 Vehicle Arresting Barrier Each 619.24 Nighttime Operations (Entire Project) Lump Sum 619.24nn Nighttime Operations Lump Sum 619.25 Traffic Control Supervisor Month 619.2601 Pavement Patching, Winter Dollars -Cents 619.27 Mailboxes Each NOTE: nn denotes a serialized pay item. DVDY denotes Devices per Day SECTION 620 - BANK AND CHANNEL PROTECTION (Last Revised May 1, 201 9)
620-1 DESCRIPTION. This work shall consist of furnishing all labor, equipment, and materials to place
a protective covering of erosion -resistant material in the locations indicated in the contract documents or as directed by the Engineer. The work shall be done in accordan ce with these specifications and in conformity with the lines, grades, thicknesses, and typical sections shown in the contract documents or established by the Engineer.
620-1.01 Vacant .
620-1.02 Stone Filling. Stone filling shall consist of a layer of well graded stone.
620-1.03 Dry Rip -Rap. Dry rip -rap shall consist of a fitted layer of shaped and graded stone.
620-1.04 Grouted Rip -Rap. Grouted rip -rap shall consist of a layer of stone, similar to dry rip -rap, with
the spaces between the stones filled with cement grout.
620-1.05 Bedding Material. Bedding material shall consist of a layer of granular material placed to
prevent underlying finer material from passing into and through the stone filling or rip -rap.
620-1.06 Concrete Block Paving. Concrete block paving shall consist of concrete blocks placed on
embankment slopes under structures as protection against erosion.
620-1.07 Gabions. Gabions shall consist of open wire mesh baskets, filled with stones.
620-2 Materials
620-2.01 General. The requirements for bank and channel protection materials are described below. The
procedure for acceptance or rejection of stone filling and rip -rap materials shall be in conformance with the procedures contained in the geotechnical control procedure “ Procedure for the Control of Stone Filling and Rip -Rap Items ”.