ITEM 510 DOWEL HOLES

510.01 Description. This work consists of drilling holes into concrete or masonry, and furnishing

and placing grout into the holes. The furnishing and placing of steel for dowels is included in Item 509.

510.02 Materials. Cement grout consists of one part of hydraulic cement conforming to Item

701 and three parts sand conforming to 703.03, by volume, and water. Furnish nonshrink, nonmetallic grout conforming to 705.20.

510.03 Drilling of Holes. Drill holes at the location and the depth shown on the plans without

spalling the concrete. Drill holes for cement grout at least 1/2 inch (13 mm) larger in diameter than the dowel bar. Drill holes diameters for nonshrink, nonmetallic grout at least 1/16 inch (1.5 mm) larger in diameter than the dowel bar. Drill hole for encapsulated type nonshri nk, nonmetallic grout as recommended by the manufacturer. Instead of drilling holes, the Contractor may install formed holes with laitance removed.

510.04 Placement. Do not install grout if the temperature of the concrete into which the grout is

being placed is below 40 F (4 C). Force dowel bars into the holes, to the specified depth, spreading the grout around the bar and solidly filling the hole. Before installing cement grout and dowels, saturate cement grout dowel holes with water then blow out all excess water. Place enough cement grout to completely fill the holes during dowel installation. If cement grout does not completely fill the hole, remove the dowel, pour additional grout into the hole, and reinstall the dowel. Before installing nonshrink, nonmetallic grout and dowel, clean and dry the grout holes. Immediately after mixing, place a sufficient amount of nonshrink, nonmetallic grout to provide complete coverage around the dowel to ensure anchorage. If nonshrink, no nmetallic grout does not completely fill the hole, pour additional grout in until the hole is filled flush. Obtain the correct protrusion of the anchors or dowels, and hold dowels in the plan position within the holes until the grout has initially hardened. If horizontal holes are specified, provide a means of retaining the grout in the hole flush with the vertical face and remove this material after the grout has hardened. Do not use material for retaining the grout that bonds to the grout.

510.05 Curing and Loading. Before applying any stresses to dowels, cure nonshrink,

nonmetallic grout as follows: Daily Minimum Ambient Temperature Minimum Curing Time 33 to 50 F (1 to 10 C) 3 hours 51 to 68 F (11 to 20 C) 1 1/2 hours above 68 F (above 20 C) 1 hour

510.06 Basis of Payment. The Department will pay for accepted quantities at the contract prices

as follows: Item Unit Description 510 Each Dowel holes with cement grout 510 Each Dowel holes with nonshrink, nonmetallic grout

Dowel Holes in other states

Get an email when 510 changes

Ohio revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Construction and Material Specifications, 2023 (rev. 7/17/2026) Edition. Pages 327–328 of 892. View official source ↗

Ask about this section

Scoped to Ohio Construction & Material Specifications, Section 510 — Dowel Holes. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.