ITEM 518 DRAINAGE OF STRUCTURES
518.01 Description. This work consists of constructing drainage systems.
518.02 Fabrication. Fabricate scuppers according to Item 513. Select a fabricator that is at least
pre-qualified at level SF. The Department will base final acceptance of all fabricated members on the Engineer’s approval that the fabricated items can be successfully incorporated into the structures. Submit mill test reports for structural steel, steel castings, bronze, and sheet lead certified according to 501.06.
518.03 Materials. Furnish materials conforming to:
Scuppers, structural steel and cast steel ............................................ 513 Metal pipe ............................................. 707 Plastic pipe .......................... 707.33, 707.45 Other metals .......................................... 711 Prefabricated Geocomposite Drain (PGD) ................................. 712.16 Geotextile fabric, Type A ................ 712.09 Reinforced thermosetting resin pipe ...................................... 707.80 Furnish pipe specials of a grade at least as high as the type of pipe specified. Furnish porous backfill consisting of gravel, stone, or air -cooled blast furnace slag, with a No. 57 size gradation according to Table 703.01-1. The sodium sulfate soundness loss shall not exceed 15 percent. Furnish ACBFS conforming to Supplement 1027.
518.04 General. As shown on the plans, connect all parts to new or existing sewers or other
outlets. When installing to superstructure, take into account the deflection of spans under full dead load.
518.05 Porous Backfill. Place porous backfill as shown on the plans. When not shown on the
plans, place backfill at least 2 feet (0.6m) thick behind the full length of abutments, wing walls, and retaining walls. Measure the thickness of porous backfill normal to the abutment or wall face. The Contractor may leave undisturbed rock or shale within 18 inches (0.5 m) of the abutment or wall. Place 2 ft³ (0.23 m³) of bagged No. 3 aggregate at each weep hole to retain the porous backfill. Place the porous backfill for the full width of the trench and extend it to the bottom of the approach slab or base, as shown in the plans. Place porous backfill in loose lifts not to exceed 12 inches. Run a plate compactor or tamper over the top of each lift for consolidation of approximately 85% of original layer thickness. If placed in loose lifts greater than 12 inches, flood the porous backfill at the appropriate moisture content for consolidation of approximately 85% of original layer thickness.
518.06 Prefabricated Geocomposite Drain (PGD). Do not use PGD on Integral Abutments or
above the beam seat elevation on Semi Integral Abutments.
518.07 Pipe. For drain pipe leading down from the superstructure, use either galvanized steel
pipe, 748.06, or plastic pipe, 707.45, or reinforced thermosetting resin pipe, 707.80. Provide specials, elbows, tees, wyes, and other fittings essential for a complete and satisfactory installation of the same material and quality as the pipe. Construct watertight joints of adequate strength. In steel pipe, weld joints or use clamp -type couplings having a ring gasket. In plastic pipe, make joints according to the applicable ASTM standard. In reinforced thermosetting resin pipe, make joints according to manufacturer guidelines and procedures. Securely fasten the pipe to the structure with hanger or clamp assemblies that are galvanized according to 711.02. Place subsurface pipe as shown in the plans. If the plans require drainage pipe in the porous backfill, provide plastic pipe conforming to 707.33. For corrugated metal pipe, perforated specials are not required and the Contractor may make bends with adjustable elbows conforming to the thickness requirements of the pipe specifications.
518.08 Scuppers. Construct secure and watertight connections, including the connections to
adjacent concrete. Provide castings, true to form and dimension. Weld the joints of structural steel scuppers. Galvanize scuppers according to 711.02.
518.09 Excavation. Excavate all material encountered to the dimensions necessary to provide
ample space at least to install pipe or other drainage facility behind abutments and for outlets.
518.10 Method of Measurement. The Department will measure Porous Backfill and Porous
Backfill with Geotextile Fabric, by the number of Square Yards (Square Meters), Cubic Yards (Cubic Meters) or lump sum. The Department will measure Prefabricated Geocomposite Drain by the number of Square Yards (Square Meters) or lump sum. The Department will measure pipe specials by the same method as the pipe. If pipe is by the foot (meter), the Department will measure the pipe along its centerline. The Department will measure all Square Yard (Square Meters) items as the area of the abutment or wall being covered for drainage
518.11 Basis of Payment. The cost to backfill, if not separately itemized in the Contract, and
excavation is incidental to the drainage facility that necessitates them. The Department will include bagged aggregate with porous backfill for payment. The Department considers all items to place the Prefabricated Geocomposite Drain including surface preparation, tape, fasteners, adhesives, outlet fittings or other support material, incidental to the Prefabricated Geocomposite Drain. The Department will pay for perforated and non-perforated pipes for the Prefabricated Geocomposite Drain as separate pay items per 518.07. The Department will pay for accepted quantities at the contract prices as follows: Item Unit Description 518 Cubic Yard Porous Backfill (Cubic Meter) or Lump Sum 518 Cubic Yard Porous Backfill with Geotextile Fabric (Cubic Meter) or Lump Sum 518 Square Yard Prefabricated Geocomposite Drain (Square Meter) or Lump Sum 518 Foot (Meter) ___ inch (___ mm) ___ Pipe, Including Specials 518 Each Scuppers, Including Supports 518 Pound or Foot Trough Horizontal Conductors (Kilogram or Meter) 518 Pound or Foot Pipe Horizontal Conductors (Kilogram or Meter) 518 Foot (Meter) ___ inch (___ mm) Pipe Downspout Including Specials