ITEM 652 PLACING STOCKPILED TOPSOIL
652.01 Description. This work consists of hauling and spreading topsoil from stockpiles and
preparing the surface.
652.02 Construction Requirements. Prepare the surface according to 653.03. Place and spread
the topsoil according to 653.03.
652.03 Method of Measurement. The Department will measure Placing Stockpiled Topsoil by
the number of cubic yards completed and accepted in place.
652.04 Basis of Payment. The Department will pay for accepted quantities at the contract price
as follows: Item Unit Description 652 Cubic Yard Placing Stockpiled Topsoil