Incidental Construction (600-699)

652PLACING STOCKPILED TOPSOIL

OH · 2019 Standard SpecificationsBook pages 00View official source ↗

651.01 654 650 ROADSIDES ITEM 651 TOPSOIL STOCKPILED

651.01 Description

651.02 Construction Requirements

651.03 Method of Measurement

651.04 Basis of Payment

651.01 Description. This work consists of stripping topsoil from areas shown

on the plans or from within the Right -of-Way limits, transporting, and stockpiling topsoil at locations shown on the plans or at locations selected by the Contractor with project approval.

651.02 Construction Requirements. Remove all heavy grass, weeds, or other

vegetation over the areas before stripping. Keep the topsoil separate from other excavated materials. Rem ove topsoil before beginning the regular excavation or embankment work in the area. Strip the topsoil to the depth shown on the plans or as directed by the Engineer.

651.03 Method of Measurement. The Department will measure Topsoil

Stockpiled by the number of cubic yards (cubic meters) completed and accepted, measured from the removal areas.

651.04 Basis of Payment. The Department will not pay for any removal of

topsoil beyond the directed depth. The Department will pay for accepted quantities at the contra ct price as follows: Item Unit Description 651 Cubic Yard Topsoil Stockpiled (Cubic Meter) ITEM 652 PLACING STOCKPILED T OPSOIL

652.01 Description

652.02 Construction Requirements

652.03 Method of Measurement

652.04 Basis of Payment

652.01 Description. This work consists of hauling and spreading topsoil from

stockpiles and preparing the surface.

652.02 Construction Requirements. Prepare the surface according to 653.03.

Place and spread the topsoil according to 653.03.

652.03 Method of Measurement. The D epartment will measure Placing

Stockpiled Topsoil by the number of cubic yards (cubic meters) completed and accepted in place.