652.04 655 652.04 Basis of Payment. The Department will pay for accepted quantities at the contract price as follows: Item Unit Description 652 Cubic Yard Placing Stockpiled Topsoil (Cubic Meter) ITEM 653 TOPSOIL FURNISHED AN D PLACED
653.01 Description
653.02 Materials
653.03 Construction Requirements
653.04 Method of Measurement
653.05 Basis of Payment
653.01 Description. This work consists of furnishing and spreading topsoil and
preparing the subgrade.
653.02 Materials. Furnish topsoil consisting of loose, friable, loamy material
without admixture of subsoil or refuse. For topsoil to be considered loamy, ensure that the fraction pas sing the No. 10 (2.00 mm) sieve does not contain more than 40 percent clay. Furnish topsoil consisting of not less than 4 percent and not more than 20 percent organic matter as determined by loss on ignition of samples oven dried to constant weight at 212 F (100 C). Test topsoil according to AASHTO T 267. Furnish topsoil that is free of grass, brush, and, roots.
653.03 Construction Requirements. Before placing any topsoil, prepare all
areas to be covered with topsoil according to 659.10. Place the topsoil according to
659.11 When seeding is specified, open the topsoil up to receive the seed.
653.04 Method of Measurement. The Department will measure compacted
Topsoil Furnished and Placed by the number of cubic yards (cubic meters) accepted in place.
653.05 Basis of Payment. The Department will pay for accepted quantities at
the contract price as follows: Item Unit Description 653 Cubic Yard Topsoil Furnished and Placed (Cubic Meter)