ITEM 653 TOPSOIL FURNISHED AND PLACED
653.01 Description. This work consists of furnishing and spreading topsoil and preparing the
subgrade.
653.02 Materials. Furnish topsoil consisting of loose, friable, loamy material without admixture
of subsoil or refuse. For topsoil to be considered loamy, ensure that the fraction passing the No. 10 (2.00 mm) sieve does not contain more than 40 percent clay. Furnish topsoil consisting of not less than 4 percent and not more than 20 percent organic matter as determined by loss on ignition of samples oven dried to constant weight at 212 F. Test topsoil according to AASHTO T 267. Furnish topsoil that is free of grass, brush, and, roots.
653.03 Construction Requirements. Before placing any topsoil, prepare all areas to be covered
with topsoil according to 659.10. Place the topsoil according to 659.11. When seeding is specified, open the topsoil up to receive the seed.
653.04 Method of Measurement. The Department will measure compacted Topsoil Furnished
and Placed by the number of cubic yards accepted in place.
653.05 Basis of Payment. The Department will pay for accepted quantities at the contract price
as follows: Item Unit Description 653 Cubic Yard Topsoil Furnished and Placed
Topsoil Furnished and Placed in other states