325.04 Separator Fabric for Bases
319.06 Basis of Payment
The Department will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:
325.01 Description
This work consists of installing a separator fabric for bases.
325.02 Materials
Provide separator fabric in accordance with Subsection 712.05, "Geotextiles for Bases."
325.03 Equipment — Vacant
325.04 Construction Methods
325.05 Method of Measuremen T
The Resident Engineer will measure the are a covered by Separator Fabric after placement, not including overlaps.
325.06 Basis of Payment
The Department will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit: SEPARATOR FABRIC Square Yard [Square Meter] SECTION 326 GEOSYNTHETIC REINFORCEMENT
326.01 Description
This work consists of installing geosynthetic reinforcement material beneath the aggregate base layer in the pavement structure, or beneath the roadway embankment. This includes the use of geogrids and geotextiles. Geotextile is made of synthetic fibers manufactured in a woven or loose nonwoven manner to form a blanket -like product used to reinforce soil and rock. Geogrid is a co ntinuous sheet of net -shaped synthetic material formed by tensile elements that reinforce soil and rock by interlocking.
326.02 Materials
Use geosynthetic reinforcement that is an integrally -formed single layer structure. Provide geogrids in accordance wit h Subsection 712.07, "Geogrid Subgrade Reinforcement of Pavement Structures." Provide geotextiles in accordance with Subsection 712.04, “Geotextiles for Subgrade Reinforcement.” 326. 03 EQUIPMENT — VACANT
326.04 Construction Methods
Get an email when 325 changes
Oklahoma revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.