REMOVAL AND STORAGE OR RECONSTRUCTION OF FENCING AND GUARDRAIL 625.02 593 624.06 BASIS OF PAYMENT The Department will pay for each p ay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:
625.01 Description
This work consists of removing and storing, or reconstructing, fencing and guardrail.
625.02 Materials
Provide salvaged materials in good condition from the existing installation for reconstruction. Replace other materials. Provide paint in accordance with Subsection 730.02, “Requirements for Paint Systems.” Unless otherwise required by the Contract, provide aluminum paint for refurbishing. Provide zinc -rich paint in accordance with Subsection 730.02, “Requirements for Paint Systems.” 625. 06 REMOVAL AND STORAGE OR RECONSTRUCTION OF FENCING AND GUARDRAIL 594 625.03 EQUIPMENT — VACANT
625.04 Construction Methods
625.05 Method of Measuremen T
For removal and storage of guardrail or fence, the Resident Engineer will measure the l ength from center to center of end posts before removal. For removal and reconstruction of guardrail or fence, the Resident Engineer will measure the length from center to center of end posts after reconstruction and approval.
625.06 Basis of Payment
The D epartment will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:
626.01 Description
This work consists of constructing concrete monuments or markers.
626.02 Materials
Provide materials in accordance with the following sections: Material: Section: Portland Cement Concrete Class A 701 Reinforcing Steel 723 The Department will provide the bronze plates used for markers or monuments.
626.03 Equipment — Vacant
626.04 Construction Methods
Construct monuments and right -of-way markers using reinforced concrete in accordance with Section 509, “Structural Con crete,” and as shown on the Plans. Provide monuments and right -of-way markers with a carborundum finish. Replace monuments or right -of-way markers, damaged during construction before final acceptance, at no additional cost to the Department. Set and plumb monuments and right -of-way markers to the depth shown on the Plans. Compact select backfill, approved by the Resident Engineer, to stabilize and secure the monuments or right -of-way markers.
626.05 Method of Measuremen T — Vacant
626.06 Basis of Payment
The Department will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit: