General Provisions (00100-00999)

625Removal and Storage or Reconstruction of Fencing and Guardrail

OK · 2019 Standard SpecificationsBook pages 607608View official source ↗

REMOVAL AND STORAGE OR RECONSTRUCTION OF FENCING AND GUARDRAIL 625.02 593 624.06 BASIS OF PAYMENT The Department will pay for each p ay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:

A.FENCE, STYLE WWF Linear Foot [Meter]
B.GATE, STYLE WWF Each
C.FENCE, STYLE SWF Linear Foot [Meter]
D.GATE, GALVANIZED STEEL Each
E.FENCE, STYLE CLF Linear Foot [Meter]
F.GATE, STYLE CLF Each
G.FENCE, STYLE GDF Linear Foot [Meter] Include the cost of connections to cross fences to be included in the contract unit price for the relevant fence pay item. The Department will pay for the cost of Class A concrete and reinforcing steel used in the construction of concrete wall for fence, if required by the Contract, in accordance with Section 509, "Structural Concrete," and Section 511, "Reinforcing Steel for Structures." REMOVAL AND STORAGE OR RECONSTRUCTION OF FENCING AND GUARDRAIL

625.01 Description

This work consists of removing and storing, or reconstructing, fencing and guardrail.

625.02 Materials

Provide salvaged materials in good condition from the existing installation for reconstruction. Replace other materials. Provide paint in accordance with Subsection 730.02, “Requirements for Paint Systems.” Unless otherwise required by the Contract, provide aluminum paint for refurbishing. Provide zinc -rich paint in accordance with Subsection 730.02, “Requirements for Paint Systems.” 625. 06 REMOVAL AND STORAGE OR RECONSTRUCTION OF FENCING AND GUARDRAIL 594 625.03 EQUIPMENT — VACANT

625.04 Construction Methods

A.Removal and Storage Store removed material at the location shown on the Plans, or as directed by the Resident Engineer. When removing material, prev ent damage to posts, cable, fence, plates, or fittings. Coil and tie cable or fence before storing. Box or tie fittings together in bundles. Stack metal plates and posts on blocks off the ground.
B.Reconstruction of Guardrail or Fence When reconstructing guardrail or fence, remove and temporarily store until the resetting operation. Reconstruct guardrail or fence in accordance with Section 623, "Guardrail and End Treatments, " and Section 624, "Fences." Replace lost or damaged material at no additional cost to the Department. Coat newly -cut holes with zinc -rich paint. After erecting metal plate rail, clean abrasions of existing paint and apply one coat of aluminum paint to damaged an d primed areas. After the first coat dries, apply a second coat of aluminum paint to all plate rail and fittings in accordance with Subsection 623.04.B, “Rail Elements.” If required by the Contract, set Department -provided guardrail at locations shown on the Plans in accordance with Section 623, “Guardrail and End Treatments.”

625.05 Method of Measuremen T

For removal and storage of guardrail or fence, the Resident Engineer will measure the l ength from center to center of end posts before removal. For removal and reconstruction of guardrail or fence, the Resident Engineer will measure the length from center to center of end posts after reconstruction and approval.

625.06 Basis of Payment

The D epartment will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:

A.REMOVE AND STORE FENCE Linear Foot [Meter]
B.REMOVE AND RECONSTRUCT FENCE Linear Foot [Meter]
C.REMOVE AND STORE GUARDRAIL Linear Foot [Meter]
D.REMOVE AND RECONSTRUCT GUARDRAIL Linear Foot [Meter] MONUMENTS 626.06 595 SECTION 626 MONUMENTS

626.01 Description

This work consists of constructing concrete monuments or markers.

626.02 Materials

Provide materials in accordance with the following sections: Material: Section: Portland Cement Concrete Class A 701 Reinforcing Steel 723 The Department will provide the bronze plates used for markers or monuments.

626.03 Equipment — Vacant

626.04 Construction Methods

Construct monuments and right -of-way markers using reinforced concrete in accordance with Section 509, “Structural Con crete,” and as shown on the Plans. Provide monuments and right -of-way markers with a carborundum finish. Replace monuments or right -of-way markers, damaged during construction before final acceptance, at no additional cost to the Department. Set and plumb monuments and right -of-way markers to the depth shown on the Plans. Compact select backfill, approved by the Resident Engineer, to stabilize and secure the monuments or right -of-way markers.

626.05 Method of Measuremen T — Vacant

626.06 Basis of Payment

The Department will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:

A.MONUMENTS Each
B.RIGHT -OF-WAY MARKERS Each
C.RIGHT -OF-WAY MARKERS REMOVED AND RESET Each If the Contract requires the placement of bronze plates only (e.g. in the end posts of bridges or face of curbs), Include the cost of placing bronze plates to be included in the contract unit price for other relevant pay items.
Source: Oklahoma Standard Specifications for Highway Construction, 2019 Edition. Pages 607608 of 935.