00866Longitudinal Pavement Markings - High Performance

OR · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 951–953 Save this section

Ask about Section 00866

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

00866.75 885 Section 00866 - Longitudinal Pavement Markings - High Performance Description

00866.00 Scope - In addition to the requirements of Section 00850, install high performance

longitudinal pavement markings according to the following Specifications. Labor

00866.30 Manufacturer's Representative - Provide a manufacturer's representative according

to 00850.30.

00866.31 Manufacturer -Certified Installers - Provide certified installer's according to 00850.31.

Construction

00866.40 General - Before installing, and in the presence of the Engineer, conduct a performance

test by applying a 150 foot test section on roofing felt. Do not place permanent Material without the Engineer's approval of the performance test. Additional performance tests may be required. Conduct performance tests at no additional cost to the Agency.

00866.45 Installation - Place markings only when the manufacturer's representative determines that

the Pavement is ready for the pavement marking Material. Do not place th e pavement markings on longitudinal Pavement joints. Apply reflective elements at a rate to obtain the following minimum initial reflectivity readings: • White - 250 mcd/m 2/lx • Yellow - 200 mcd/m2/lx Apply marking M aterial by one or more of the following methods: • Method 1: Extruded Markings - Apply markings with an extrusion or ribbon type process. • Method 2: Spray ed Markings - If more than one application is required to obtain the specified thickness, retrace additional applications directly over previous applications within 1/16 inch. • Method 1-2: Extruded or Sprayed Markings - Install Method 1 markings or Method 2 markings. For grooved markings, grind the slot depth as shown. Apply the specified marking M aterial centered in the slot as shown. The top of the marking shall be flat or slightly convex.

00866.75 Manufacturer Warranty - Furnish a manufacturer warranty that unconditionally warrants

to the Agency the pr oduct(s) and installation under this Section against failure, according to this Subsection and 00170.85(c)(1). Use Agency -supplied warranty forms, available from the Engineer. "Unconditionally warrant" means that the warranty covers all failures, regardl ess of the source or cause of the failure, including, without limitation, whether the source or cause is or may be related to workmanship, inspection, or choice of M aterials. The Agency inspection of any portion of the Work during the Contract and during the product installation, the Agency acceptance of the Work , corrections under the warranty, or expiration of the warranty shall not relieve the obligations under this warranty. 00866.80

a.Warranty Period - The warranty period shall be for 1 year.
b.Failure - For purposes of this warranty, failure is defined as one or more of the following: Retroreflectivity - Marking s fail to maintain a minimum retroreflectivity of 150 mcd/m2/lx for white and 125 mcd/m2/lx for yellow. Insufficient Color Stability (Yellow) - Yellow marking s fail to meet ASTM D6628. Insufficient Color Stability (White) - White markings fail to meet ASTM D6628. Adhesion - Any 300-foot segment of marking shows 5 percent or greater loss of line due to non-adhesion . This constitute s a failure of that segment.
c.Remedy - Upon notification by the Engineer of a failure, provide the following remedy at no additional cost to the Agency: Repair or replace, at the discretion of the Engineer all failed pavement markings within 6 months of the Agency's request to do so. Use Materials and procedures meeting the Specifications. Match repairs to adjoining Work . Coordinate timing of repair Work with the Engineer.
d.Agency's Right to Make Repairs - If, in the opi nion of the Engineer, a failure causes or may cause a hazard, the failure may be temporarily corrected by Agency or other forces at no additional cost to the Agency. Replace temporary repairs with permanent repairs at no additional cost to the Agency and according to the Specifications and within the time specified in 00866.75(c). Measurement

00866.80 Measurement - The quantities of high performance pavement markings will be measured

on the length basis. High performance pavement markings will be based on a nominal line width of 4 inches. If the width of the line is other than 4 inches, measurement will be adjus ted by converting to an equivalent length of nominal 4 inch line on a proportionate area basis. Measurement will be the actual stripe. Gaps between skip stripes will not be measured. 00866.90 887 Payment

00866.90 Payment - The accepted quantities of Work performed under this Section will be paid for

at the Contract unit price, per unit of measurement, for the following items : Pay Item Unit of Measurement Method 1 (Extruded)

a.Plural Component, Extruded, ____ ....................................................... Foot
b.Plural Component, Extruded, W et Weather, ____ ................................ Foot
c.Hi-Build Paint, Extruded, ____ .............................................................. Foot
d.Hi-Build Paint, Extruded, Wet Weather, ____ ....................................... Foot Method 2 (Sprayed)
e.Plural Component, Sprayed, ____ ........................................................ Foot
f.Plural Component, Sprayed, Wet Weather, ____ ................................. Foot
g.Hi-Build Paint, Sprayed, ____ ............................................................... Foot
h.Hi-Build Paint, Sprayed, Wet Weather, ____ ........................................ Foot Method 1 -2 (Extruded or Sprayed)
i.Plural Component, Extruded or Sprayed, ____ ..................................... Foot
j.Plural Component, Extruded or Sprayed, Wet Weather, ____ .............. Foot
k.Hi-Build Paint, Extruded or Sprayed, ____ ............................................ Foot
l.Hi-Build Paint, Extruded or Sprayed, Wet Weather, ____ ..................... Foot The word “Surface” or “Grooved” will be inserted in the blank. Payment will be payment in full for furnishing and placing all Material s, and for furnishing al l Equipment , labor, and Incidental s necessary to complete the Work as specified. Payment for Work under this Section will be limited to 75 percent of the amount due until the Agency has received the signed Warranty.

Get an email when 00866 changes

Oregon revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Oregon Standard Specifications for Construction, 2024 Edition. Pages 951–953 of 1,268. View official source ↗

Ask about this section

Scoped to Oregon 2024 Standard Specifications for Construction, Section 00866 — Longitudinal Pavement Markings - High Performance. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.