701.1 701.1( c) MATERIAL
701.1GENERAL —Obtain cement from a producer listed in Bulletin 15 and from silos set aside for
Department use. Do not use retrieved or reclaimed cement. Do not use cement with a material temperature exceeding 150F at the time of delivery to the plant.
the Monthly Mill Test Form TR -7011 or Form TR -7015 for blended cement to the L TS for verification of compliance with Department specifications:
• Base the Monthly Mill Test on actual or historical statistical process controls.
• Specify the type of material and cross -reference the test to the bill of lading.
• Ensure that a responsible company official sign the Monthly Mill Test.
• Submit split sample with corresponding test results monthly.
For each shipment to the project, furnish two copies of the vendor's bill of lading. Include one copy with the shipment to the project; the vendor will retain the other copy. Use a form acceptable to the LTS that contains the following information:
• Statement that material has been tested and conforms to Department specifications.
• Type of material
• Silo number
• Company lot identification
• Date of shipment
• Producer's name and location
• Consignee's name and location
• Temperature of cement
• Trailer number
• Quantity (tons) 701.1(c) 701.1( f) • Alkali content (%) —determined according to AASHTO T 105.
Ship bulk cement in clean, acceptable, metal, rubber, or plastic waterproof containers or compartments. Ship bagged cement 94 pounds net per bag) in suitable paper bags with the brand, type, and manufacturer's name printed on them. Protect cement bags from the weather. Reject cement bags with net weight more than 3% below that specified.
• Provide storage capacity sufficient to maintain the paving schedule.
• Store bulk cement in acceptable silos.
• Store bagged cement in enclosed buildings.
• Store bagged cement in stacks not exceeding eight bags in height and cover.
sample according to PTM No. 509.
allowed by the Representative in writing. If using more than one source, separate cement of different types and from different sources. Use each type and source in continuous, segregated portions of the project. If possible, limit cement used in an indi