Finishes & Coatings (09000-12999)

101.84CONTRACT AWARD BOOKLET. A document provided to the Contractor after the

RI · 2024 Standard SpecificationsBook pages 2424View official source ↗

1−10

101.77 TITLES (OR HEADINGS) . The titles or headings of the sections and subsections

herein are intended for convenience of reference and shall not be considered as having any bearing on their interpretation.

101.78 TOWNSHIP, TOWN, CITY OR DISTRICT . A subdivision of the State used to designate

or identify the location of the proposed work.

101.79 TRAVELED WAY . The portion of the roadway provided for the movement of vehicles,

exclusive of shoulders and auxiliary lanes. 101.80 WINTER SHUTDOWN . The period from December 15th through the following April 15th. 101.81 WORK . The furnishing of all labor, materials, equipment, and other incidentals necessary for the successful completion of the project in accordance with the Contract 101.82 WORKING DAY . A calendar day during which normal construction operations could proceed for a major part of a shift, normally excl uding Saturdays, Sundays and holidays.

101.83 REPETITION OF EXPRESSIONS . In order to avoid cumbersome and confusing

repetition of expressions in these Specifications, it is provided that whenever anything is, or is to be, done, if, as, or, when, or where "contemplated, required, determined, directed, specified, authorized, ordered, given, designated, indica ted, considered, necessary, deemed necessary, permitted, reserved, suspended, established, approval, approved, disapproved, acceptable, unacceptable, suitable, accepted, satisfactory, unsatisfactory, sufficient, insufficient, rejected or condemned," it shall be understood as if the expression were followed by the words "by the Engineer" or "to the Engineer."

101.84 CONTRACT AWARD BOOKLET. A document provided to the Contractor after the

award of the Contract containing the following elements of the Contract Documents: Notice to Contractors; the Bidder’s Proposal; executed copies of both the Contract Agreement and Contract Bonds; and a Contract Award compact disk (CD) containing the RI Standard Specifications for Road and Bridge Constructi on, Supplemental Specifications, Special Provisions, Required Contract Provisions fo r Federal-Aid Projects, Federal Wage Rates, all Contract Addenda issued prior to the date of the opening of proposals, Distribution of Quantities, Plans, Appendices and Bid Analysis Reports.

101.85 CONTRACT BID PACKAGE. A compact disk (CD) containing the following items,

provided to prospective bidders for bid preparation purposes: RI Standard Specifications for Road and Bridge Construction, Supplemental Spec ifications, Special Provisions, Required Contract Provisions for Federal-Aid Projects, Federal Wage Rates, Distribution of Quantities, Plans, Appendices, the Quest Lite installation software and the Quest Lite bid file.

101.86 TRANSPORTATION MANAGEMENT PLAN. The document that lays out the set of

coordinated transportation management strategies that will be used to manage the work zone safety and mobility impacts of the project. 101.87 TMP IMPLEMENTA TION MANAGERS. The project managers with the primary responsibility and authority for implementation of the Transportation Management Plan. The Department and the Contractor must each de signate on the Transportation Management Plan their respective TMP Implementation Manager for the project.

Source: Rhode Island Standard Specifications (Bluebook), 2024 Edition. Pages 2424 of 826.