1−49 Sites from which material has been removed shall, upon completion of the work, be left in a neat and presentable condition.
106.03 SAMPLES, TESTS, CITED SPECIFICATIONS . Materials will be inspected, tested and
accepted by the Engineer before incorporation in the work. Work in which untested and unaccepted materials are used without approval of the Engineer shall be performed at the Contractor's risk. No payment will be made for materials found to be unacceptable and/or unauthorized. Unless otherwise designated, tests in accordance with the cited current standard methods of AASHTO, ASTM or other organizati ons used by the Department will be made by, and at the expense of the Department. Samples will be taken by a qualified representative of the Department. Materials being used are subject to inspection, test or rejection at any time prior to incorporation into the work. Copies of all tests will be furnished to the Contractor's representative upon request. Whenever there is an AASHTO designation followed by an ASTM designation, the AASHTO designation will govern when there are minor differences between the two specifications. 106.04 CERTIFICATION OF COMPLIANCE . The Engineer may permit use, prior to sampling and testing, of certain materials or assemblies accompanied by Certificates of Compliance, stating that such materials or assemblies fully comply with the requirements of the Contract. The certificate shall be signed by the manufacturer. Each lot of such materials or assemblies delivered to the work must be accompanied by a Certificate of Compliance and clearly identified. Materials or assemblies used on the basis of Certificates of Compliance may be sampled and tested and if found not in conformity with Contract requirements will be subject to rejection whether in place or not. The form and distribution of Certificates of Compliance shall be as approved by the Engineer. The Engineer is authorized to refuse permission for use of materials or assemblies on the basis of Certificates of Compliance. Unexpired Warranties. If the Contractor is furnished a warranty at the time of purchase of any product or material and the warranty has not expired at the time of acceptance of the work by the State, the warranty shall then be turned over to the State.
106.05 PLANT INSPECTION . The Engineer may undertake the inspection of materials at the
source. Manufacturing plants may be inspected for compliance with specified manufacturing methods. Material samples will be obtained for laboratory testing for compliance with materials quality requirements. This may be the basis for acceptance of manufactured lots as to quality. 1−50
106.06 STORAGE OF MATERIALS . Materials shall be stored to ensure the preservation of
their quality and fitness for the work according to the requirements of the Contract, including but not limited to the manufacturer’s recommendations. Stored materials, even though approved before storage, may again be inspected prior to their use in the work. Stored materials shall be located to facilitate their prompt inspection.
106.09 DEPARTMENT-FURNISHED MATERIALS . The Contractor shall furnish materials
required to complete the work, except those specified to be furnished by the Department. Material furnished by the Department will be delivered or made available to the Contractor at the points specified in the Contract Documents. The cost of handling and placing Department-furnished materials after they are delivered to the Contractor shall be included in the Contract price for the item in which they are used. The Contractor will be responsible for all material delivered. Deductions will be made from any monies due the Contractor for shortages, deficiencies, other causes, and damage which may occur after delivery. Demurrage charges, resulting from the Contractor's failure to accept the material at the designated time and point of delivery will also be deducted from monies due the Contractor.