Part 100 — GENERAL REQUIREMENTS AND COVENANTS (Continued) Page
Section 105 Control of Work ……………………………………………….………… 1-31
105.01 Authority of the Engineer ……….…….……………………..………… 1-31 105.02 Plans and Shop Drawings …………………………………………….. 1-32 105.03 Conformity with Plans and Specifications ………………..…..……… 1-33 105.04 Coordination of Plans, Specifications, Supplemental Specifications, and Special Provisions ………...…………... 1-33
105.05 Cooperation by Contractor ……………………………………………. 1-34
105.06 Cooperation with Utilities ….………………….……………….…….… 1-34 105.07 Cooperation between Contractors ………………………..….…….… 1-36 105.08 Construction Stakes, Lines and Grades ……………….……....….… 1-36 105.09 Authority and Duties of Resident Engineer …………………………. 1-37
105.10 Inspection of Work ……….………..…………………….…….…….… 1-37
105.11 Removal of Unacceptable and Unauthorized Work …………..….… 1-38 105.12 Load Restrictions ……………………………………………….……… 1-38 105.13 Maintenance during Construction …………………….………....…… 1-38 105.14 Opening Sections of Proj ect to Traffic …………………….………… 1-39
105.15 Furnishing Right-of-Wa y ………………..……………. …….………… 1-39
105.16 Failure to Maintain Roadway or Structure ………………………….. 1-39 105.17 Acceptance ………………….………….…………………..….…….… 1-40 105.18 Claims for Adjustments and Disputes ……………………………….. 1-41 105.19 Procedure for Claims and Disputes ……..……….....................…… 1-44 105.20 Project Delays …… …………….……………………………….……… 1-44
105.21 Work Zone Training …………………………………………….……… 1-45
105.22 Request for Informati on (RFI)………………………………….……… 1-46
Section 106 Control of Material ….…………………………….…………..……..…. 1-47
106.01 Source of Supply and Quality Requirements …………….…………. 1-47 106.02 Local Material Sources …………………………………….….…….… 1-48
106.03 Samples, Tests, Cited S pecifications ……………………………...… 1-49
106.04 Certification of Co mpliance …………………………………………… 1-49
106.05 Plant Inspection ………………………………………………………… 1-49 106.06 Storage of Materials …………………………………….……………… 1-50 106.07 Handling Materials …………………………………….……………….. 1-51 106.08 Unacceptable Materials ……………………………………….……….. 1-51
106.09 Department-Furnished Materials …………………………….……….. 1-51
Section 107 Legal Relations and Responsib ility to Public ………….….…..……… 1-52
107.01 Laws to be Observed ……………………………………….….………. 1-52 107.02 Specific Statutes Required to be Inserted ………………….….……… 1-52 107.03 Permits, Licenses and Taxes …….……………………..……..….…… 1-55
107.04 Patented Devices, Materials and Processes ............................…… 1-55
107.05 Restoration of Surfaces Opened by Permit …………….….…...……. 1-55 107.06 Federal-Aid Participat ion ...…………………………………….……… 1-55
107.07 Sanitary, Health and Safety Provisions ………………………………. 1-55 107.08 Public Convenience and Safety ……………………………………….. 1-56 107.09 Barricades and Warning Signs …………………………….…...……… 1-56
107.10 Use of Explosives …………………………………………….…...…….. 1-57
107.11 Protection and Restoration of Property and Landscape ……..….….. 1-59 107.12 Forest Protection ..............................................................…..……… 1-60 107.13 Responsibility for Dama ge Claims …………………..………………… 1-60
-ii-
Part 100 — GENERAL REQUIREMENTS AND COVENANTS (Continued) Page
107.14 Third Party Beneficiary Clause …….……………….…….…………… 1-61
107.15 Personal Liability of Department Employees …….……..…………… 1-62 107.16 No Waiver of Legal Ri ghts …………………………….….…………… 1-62
107.17 Hazardous Material ……………..…..……………….…………….…… 1-62 107.18 Civil Rights ………………………………………………………………. 1-62
Section 108 Prosecution and Progress.………………………..…..…….………….. 1-63
108.01 Subletting of Contract …….………………….….….….………………. 1-63
108.02 Notice to Proceed ………………………………………………………. 1-63 108.03 Prosecution and Progress ………...........................................……… 1-63 108.04 Limitation of Operations ...………….………………………...……….. 1-77 108.05 Character of Workers ………..….……………………..…….…..…….. 1-77
108.06 Methods and Equipment ……………………………………………….. 1-77
108.07 Determination and Extension of Contract Time …....………..……… 1-78 108.08 Failure to Complete on Time ………………..…………………..…….. 1-79 108.09 Default of Contract ………………………………………..……….……. 1-80 108.10 Termination of Contract ………………………………………………... 1-82
Section 109 Measurement and Payment …………………………………………… 1-85
109.01 Measurement of Quantities ………………….………………..……..... 1-85 109.02 Scope of Payment ………………………………………..……….……. 1-88 109.03 Compensation for Altered Quantities ……………….……....………… 1-88 109.04 Differing Site Conditions, Changes, Extra Work
and Force Account Work ………………...…………………... 1-88
109.05 Eliminated Items ………………………………………………………… 1-91
109.06 Partial Payments ……………………………………….....….…….…… 1-91 109.07 Partial Payment of Lump Sum Items …….………..….….…………… 1-92 109.08 Payment of Withheld Funds …………………………………………… 1-93 109.09 Acceptance and Final Payment ………………………………………. 1-93
109.10 Compensation for Projec t Delays ……………….……..……………… 1-94
109.11 Prompt Payment Procedures …………………………….………….... 1-95 109.12 Subcontractor Prompt Payment ..........................…………………… 1-95
DIVISION II CONSTRUCTION DETAILS
Part 200 — Earthwork and Erosion Control
Section 201 Site Preparation ………………………………………………………… 2-1 Section 202 Excavation and Embankment …………………………………...……. 2-12 Section 203 Structure Excavation and Backfill …………………………………..… 2-24 Section 204 Trimming and Fine Grading …………………………………………… 2-31 Section 205 Trench Excavation ……………………………………………………… 2-32 Section 206 Perimeter Erosion Controls…………………………………………….. 2-38 Section 207 Check Dams ………………………………………………..…………… 2-43 Section 208 Temporary Dewatering Basins ………………………………………… 2-48 Section 209 Storm Drain Protection ……………………………………………….… 2-50 -iii-